697DCK-24-Q-00048 Q A - Carpet Replacement Installation.pdf
PDF 126 KB Posted
- Attached to
- Carpet Replacement/Installation - Louisville KY
- Solicitation number
- 697DCK-24-Q-00048
About this file
This document is a set of Questions and Answers related to Solicitation Number 697DCK-24-Q-00048 for Carpet Replacement/Installation at the Louisville Airport Air Traffic Control Tower Base Building (SDF TRACO) site for the Federal Aviation Administration (FAA) in Louisville, KY.
The key details are:
- The solicitation does not require a mandatory site visit, however the FAA has scheduled a site visit on April 17th at 11 AM EST.
- The FAA has already purchased the static dissipative carpet for the TRACON and it is stored at Johnson's Commercial Flooring. The contractor must furnish new 4" vinyl cove base and installation materials including Mohawk EnPress, FlexLok+, and Mohawk M700 Plus.
- The contractor must validate all dimensions and quantities for the work.
- The work must be coordinated with the FAA Contracting Officer's Representative (COR) in advance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - SDF Basebuilding and TRACON Carpet Replacement.pdf | ||
| Office and Tracon carpet area.pdf | ||
| Tower carpet area.pdf | ||
| 697DCK-24-Q-00048.pdf | ||
| Davis-Bacon Act WD KY20240093.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
697DCK-24-Q-00048 – Q & A - Carpet Replacement/Installation
1. Does this solicitation require a site visit first from the contractor?
A: No, the site visit is not mandatory.
2. Government Furnished:
• Static Dissipative Carpet (already purchased by the FAA and stored at Johnson’s Commercial
Flooring).
A: True, for the TRACON. The FAA has possession of the TOWER carpet onsite.
3. Contractor Furnished:
• New 4” vinyl cove base (color to be coordinated with local POC).
• Installation materials include Mohawk EnPress, FlexLok+, and Mohawk M700 Plus (please confirm).
A: YES
4. Unclear/Need Confirmation:
- Are any of the installation materials (Mohawk EnPress, FlexLok+, Mohawk M700 Plus) government-furnished, or are they to be supplied by the contractor?
A: Supplied by the contractor
5. The Statement of Work mentions that we can reach out at any time for a site visit, but the SF
1449 specifies a site visit date of April 17 at 11 AM EST, which we unfortunately missed. Could we schedule another site visit so my team can fully understand the scope of work? YES
A: The Sow isn’t a binding agreement until a contract is in place, however, the solicitation is where you will find the official date/information for the site visit.
File details come from the government source that posted it. Updated .