Amendment002.pdf

PDF 2 MB Posted

Attached to
Fluorescent Light Replacements at the New York ARTCC, Ronkonkoma, New York
Solicitation number
697DCK-23-R-00165
Issued by

About this file

This amendment to a solicitation provides clarification on technical requirements for fluorescent light replacements at the New York ARTCC facility. The Federal Aviation Administration is seeking to replace fluorescent lights with LED fixtures across multiple buildings on site. Key details include:

  • The solicitation number is 697DCK-23-R-00165 and has a price range from $500,000 to $1,000,000. Payment and performance bonds are required.

  • A site visit is scheduled for February 15, 2023 at 10:00am where contractors must register attendees in advance and comply with COVID protocols.

  • The scope of work involves replacing T12 and T8 fluorescent fixtures with new LED fixtures of various types in office spaces, corridors, mechanical rooms, and other areas across multiple buildings as identified in the drawings and lighting plans.

  • The amendment provides answers to contractor questions seeking clarification on fixture quantities and locations, electrical requirements, and approval of alternate fixture types.

  • Offerors must check the website periodically for any amendments as they will only be posted electronically. The closing date was not provided.

View the file

Other files

File Type Posted
697DCK-23-R-00165amendment1.pdf PDF
Scan02-15-2023-123437sitevisit.pdf PDF
DOLWAGERATES.pdf PDF
RFO697DCK-23-R-00165.pdf PDF
Lighting Replacement Spec.pdf PDF
SOW Lighting Replacement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.

PAGE OF PAGES

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

Items 8 and 15, and returning is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.

E. IMPORTANT: Contractor is not, is required to sign this document and return

ORDER NO. IN ITEM 10A.

1 1

0002 02/23/2023

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1200 DISTRICT AVENUE

BURLINGTON MA 01803

AAQ510BOS-AFN

x

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ x x

697DCK-23-R-00165

copies to the issuing office.

01/31/2023

(x)

Amendment 0002 is issued for the following questions and answers:

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Susan J. Newcomb

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment 0002

1. The drawings call for new emergency fixtures to replace existing emergency fixtures. The quantities for these E fixtures are not shown on the drawings and we have no way of knowing how many are required.

ANSWER: Please see attached drawing “Existing Lighting Plans” For Emergency battery fixture count and locations, hatched fixtures are EM battery powered. (Note NOT all lighting plans are shown in the drawing and only used for reference, contractor shall field verify existing conditions for accuracy.) For bidding purposes, contractor shall assume 20% of the fixtures will be equipped with EM battery pack.

2. Page 8 states 2x2 fixtures but the pictures show 2x4 in sheetrock ceilings Please clarify ANSWER: These are 2X2 fixtures, the picture was taken from an angle.

3. Can you please specify what electrical prevailing rate should be used. But there seemed to be confusion at the walk thru regarding A vs M rate . FYI This is not M rated work ANSWER: The Department of Labor Wage Determination are attached to the RFO and hereby made a part of the RFO. You are required to pay the rates as spelled out on the Wage Rates. Refer to Section H and J of the RFO

4. Will fixture equals be entertained?

ANSWER: Alternate fixtures will if they meet the specifications.

5. Some area notes call to ‘Provide and install EM battery pack option for fixtures with existing battery pack capability’ – is there a count and/or location of such fixtures or should we use a percentage of 15%?

ANSWER: See question #1

6. Are there any specific FAA approved LED drivers that will not interfere with their electronics?

ANSWER: LED drivers must be rated FCC Title 47 part 15 class b. An example would be eldoLED SOLOdrive drivers.

7. Second floor mezzanine has sheetrock ceilings – the spec fixtures may not work in this space, is there a trim kit specified?

ANSWER: yes, DGA22 can be ordered, see data sheet and notes on the fixture schedule.

8. Garage has significant amount of pallets and equipment throughout the space – who’s responsibility is it to move this equipment?

ANSWER: FAA will move anything in the way for the project to proceed.

9. Are we permitted to submit an alternate type of any fixture?

ANSWER: See question 4

10. It looks like all you are asking for at this time is that the first three pages of the solicitation should be emailed to you on or before 2/28/23 along with the schedule of values? Is this correct.

Answer: Incorrect. Please refer to Section L and M of the RFO for full Business and Technical proposal requirements.

The RFO and all pertained attachments are posted on the Federal Governments official contract opportunity page at https://sam.gov/content/home

11. Is a bid bond needed?

Answer: No, only payment and performance bonds are required

12. They show and walked us in the basement restrooms which have 6” Recessed lights but there are no recessed lights on the fixture schedule, nor do I see the restrooms listed on their list.

Answer: Basement restrooms are not part of the project.

13. Central Computer Complex – According to plan we are not changing all the fixtures in the room is that correct? The drawing has a dotted line along half the room. Has a count of 118, drawing shows 121, but still not entire room, correct? There are an additional 95 fixtures on the drawings, outside of work area.

Answer: Correct, not all fixtures are required to replace in this area, all T12s must be replaced with LED fixtures.

14. How many emergency fixtures are there, as we were not able to identify all or have access to certain rooms? Please provide emergency fixture count for total fixtures.

ANSWER: See question #1

15. What is the square footage of the Floor Tech Ops Office space in the Admin Wing, there are no measurements on the drawings?

Answer: 96’ X 35’ = 3360 ft^2 including the LAN Room C127 and Mechanical C129

16. In the Admin Wing, Tech Ops Office are rooms C127 and C129 included as not included in Table 4 for the fixtures?

Answer: Room C127 is referred as Storage C12 in Table 4. C129 does not require a fixture replacement.

17. From the Table 4 – Storage C12 is not on drawing? Please advise location

Answer: Storage C12 is room C127, next to the Tech Ops Offices.

https://sam.gov/content/home

18. Table 1 – Existing operations wing 2nd floor light fixtures all Rooms labeled M161- M168, but are not labeled on the drawings, is this the same area as the At Room Ready Rooms A-F on drawing, please clarify?

Answer: correct, Oceanic Conference rm is M161+M162, A is M163, B is M164 and so on.

19. SOW page 11 Tech area C119 – Type C or Type G?

Answer: Type C or approved equivalent

20. SOW page 13 mentions 20 Surface mounted fixtures – what type of fixture is to replace these?

Answer: Type C or approved equivalent

21. SOW page 11 shows office C130 has 130 4x2 & 2x2 – how many of each type?

Answer: C130 has 46 fixtures, 43 or them are 4x2, 3 are 2x2.

22. How many drywall ceiling adapter kits are required for the hard ceilings mentioned on SOW page 8?

Answer: The Mezzanine area is located on the second floor of the Operations and Control Wing. 63 + 57 = 120 approximately.

23. Would the agency consider an approved equal from Satco lighting instead of Lithonia?

Answer: refer to Question #4.

24. What NYS Prevailing Wage Rate is being utilized on the project? Is this a "Maintenance" Wage Rate or an "A" Construction Wage Rate?

Answer: Refer to Question #3

25. Regarding the Emergency Lights spelled out in the Bid documents is Not specific at All.

There is No Way to know which existing lights are in fact EM Lights and how many there are. The way its currently constructed there will be a change order during the job to rectify the emergency light counts and areas required.

26. Option would be to include a percentage of the Lighting Package as EM so say 600 lights total at 10% EM Lights would = 60 EM Lights assumed as an example. This would still likely incur a change order due to the counts being off still.

27. The Admin Wing Basement calls for type C/D fixtures, assuming there are in fact NO Type "D" in the basement Admin area. Also, we would like an overall total count on the type "D" fixtures just for Clarity.

Answer: Table 3 shows there are 2 1x2 fixtures which are to replace with Type D. There are also 1X2 fixtures in the Annex building (1) and PSB (2). Overall total is 5. See photo 10 for a typical 1X2 fixture.

28. The Tech Area C119 the Area calls for (20) 2x4 Fixtures in the Sheetrock Ceiling area of both tech offices, We feel that 1x4 Surface mount fixtures "Type C" would be best in this area.

Answer: This is Correct. Tech Supply Area fixtures shall be replaced with Type C.

29. The Admin Wing Calls for (20) Incandescent fixtures and calls for replacement with LED of the same wattage, But NO fixtures are spelled out to Supply and install, we would like clarification on a fixture Type and think that even a simple replacement of the existing Incandescent bulbs to a New LED Par 30-38 Type Bulb Replacement that Suffices the No Interference Spec would be sufficient assuming the existing fixture All work.

Answer: These are to be replaced with Type C 1X4 surface mounted fixtures. Submittals shall be submitted for alternatives and they will be approved if the specifications are met.

30. The Support Wing A115 Mechanical Room calls for New Type C Fixtures. This room is currently piped and wired Utilizing the Existing fixtures as a Raceway to carry power to each light in the room. The way that it's currently installed the New "Type C" lights May Not match up exactly dimensionally to the existing fixtures. This would mean that additional Conduit and wiring would be needed to complete the existing wiring back to a working manner. Please advise on how to approach.

Answer: The contractor shall provide all labor, equipment, and supplies necessary to complete the installation. Modification of conduits and wiring shall be coordinated and approved by the COR before proceeding. The contractor may also submit an alternative LED fixture that match up the dimensions of the existing fixtures.

AutoCAD SHX Text _U_

AutoCAD SHX Text

AutoCAD SHX Text K'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text G'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 8'

AutoCAD SHX Text 4'

AutoCAD SHX Text

AutoCAD SHX Text 16'

AutoCAD SHX Text 1/8"=1'-0"

AutoCAD SHX Text

GENERAL NOTES:

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 1/8"_=_1'-0"_______

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E18

AutoCAD SHX Text

AutoCAD SHX Text E18_

AutoCAD SHX Text

___________________LIGHTING_PLAN__________________

AutoCAD SHX Text

______________SECOND_FLOOR/MEZZANINE______________

AutoCAD SHX Text

AutoCAD SHX Text M'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text R'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text U'

AutoCAD SHX Text

AutoCAD SHX Text

DRAWING NOTES:

AutoCAD SHX Text

SECOND_FLOOR/MEZZANINE_LIGHTING_PLAN__

AutoCAD SHX Text N-A159-A. 37

AutoCAD SHX Text N-A159-A. 39

AutoCAD SHX Text F

AutoCAD SHX Text

CLOSET

AutoCAD SHX Text

AutoCAD SHX Text M160

AutoCAD SHX Text

AutoCAD SHX Text M168

AutoCAD SHX Text

AT READY ROOM AREA F

AutoCAD SHX Text

AutoCAD SHX Text M167

AutoCAD SHX Text

AT READY ROOM AREA E

AutoCAD SHX Text

AutoCAD SHX Text M166

AutoCAD SHX Text

AT READY ROOM AREA D

AutoCAD SHX Text

AutoCAD SHX Text M165

AutoCAD SHX Text

AT READY ROOM AREA C

AutoCAD SHX Text

AutoCAD SHX Text M164

AutoCAD SHX Text

AT READY ROOM AREA B

AutoCAD SHX Text

AutoCAD SHX Text M163

AutoCAD SHX Text

AT READY ROOM AREA A

AutoCAD SHX Text

AutoCAD SHX Text M162

AutoCAD SHX Text

OCEANIC CONFERENCE AND SCHEDULING ROOM

AutoCAD SHX Text

AutoCAD SHX Text M161

AutoCAD SHX Text

SCHEDULES AND ETAMS OFFICE

AutoCAD SHX Text

AutoCAD SHX Text M157

AutoCAD SHX Text

COORIDOR

AutoCAD SHX Text

STAIR NO. 7

AutoCAD SHX Text

COORIDOR

AutoCAD SHX Text _M159

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C.

AutoCAD SHX Text

LIGHTING FIXTURE SCHEDULE IS SHOWN ON DRAWING E27.

AutoCAD SHX Text A.

AutoCAD SHX Text B.

AutoCAD SHX Text

COORDINATE INSTALLATION OF LIGHT FIXTURES WITH MECHANICAL EQUIPMENT.

AutoCAD SHX Text NUMBER OF WIRES IS SHOWN ON HOMERUN ONLY. CIRCUITING BETWEEN DEVICES MAY NOT SHOW ALL NECESSARY CONDUCTORS. EACH BRANCH CIRCUIT SHALL HAVE ITS OWN SEPARATE NEUTRAL AND GROUNDING CONDUCTOR. USE OF COMMON/SHARED NEUTRAL OR GROUNDING CONDUCTORS IS NOT PERMITTED.

AutoCAD SHX Text N-A159-A. 23

AutoCAD SHX Text F

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text EMERGENCY LIGHTING FIXTURES SHALL BE EQUIPPED WITH A 90 MINUTE BATTERY PACK. LAMPS SHALL BE CONTROLLED BY THE SWITCHED FIXTURE BALLAST UNDER NORMAL OPERATION AND CHANGE TO EMERGENCY OPERATION UPON LOSS OF NORMAL POWER (BATTERY PACK SHALL MONITOR AN UNSWITCHED LEG OF THE CIRCUIT SERVING THE FIXTURE). INSTALL INDICATION LAMP AND TEST SWITCH WHERE READILY OBSERVABLE AND ACCESSIBLE.

AutoCAD SHX Text H

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E22

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 10-15-01

AutoCAD SHX Text

DELETE EXIT SIGN IN CORRIDOR M159

AutoCAD SHX Text

D._NGUYEN

AutoCAD SHX Text

P._TRAN

AutoCAD SHX Text

J._WEAVER

AutoCAD SHX Text

WIRE PA SPEAKERS TO NEW PA SYSTEM LOCATED ON BASEMENT LEVEL.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text PROVIDE RECESSED 2' X 2' FLUORESCENT FIXTURES TO MATCH EXISTING ADJACENT MEZZANINE.

AutoCAD SHX Text

(TYP)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 9-2003

AutoCAD SHX Text

RECORD SET OF DRAWINGS

AutoCAD SHX Text

DEPARTMENT OF TRANSPORTATION

AutoCAD SHX Text

FEDERAL AVIATION ADMINISTRATION

AutoCAD SHX Text

DESIGNED BY:

AutoCAD SHX Text

ISSUED BY:

AutoCAD SHX Text

APPROVED BY:

AutoCAD SHX Text

DRAWING NO.:

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

REV.

AutoCAD SHX Text

LTR.

AutoCAD SHX Text

DESIGN FILE:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

TIME:

AutoCAD SHX Text

USER:

AutoCAD SHX Text

AIRWAY FACILITIES

AutoCAD SHX Text

DIVISION

AutoCAD SHX Text

DIVISIONACILITIES

AutoCAD SHX Text

REV.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

CHECKED

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

DATE

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

REVIEWED BY:

AutoCAD SHX Text

$$DATE

AutoCAD SHX Text

$$TIME

AutoCAD SHX Text

$$USER

AutoCAD SHX Text

$$DGN

AutoCAD SHX Text

EASTERN REGION

AutoCAD SHX Text

JAMAICA, NEW YORK

AutoCAD SHX Text

AEA-D-37679-

AutoCAD SHX Text

CHECKED BY:

AutoCAD SHX Text

DRAWN BY:

AutoCAD SHX Text

SUBMITTED BY:

AutoCAD SHX Text

DATE:

AutoCAD SHX Text

NEW YORK ARTCC

AutoCAD SHX Text

RONKONKOMA, NEW YORK

AutoCAD SHX Text

AutoCAD SHX Text

KEY PLAN

AutoCAD SHX Text

PROJECT NORTH

AutoCAD SHX Text

CONTROL WING

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text G

AutoCAD SHX Text H

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text U

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text U'

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text P'

AutoCAD SHX Text

AutoCAD SHX Text R

AutoCAD SHX Text

FAA CONTROL

AutoCAD SHX Text

AIR ROUTE TRAFFIC CONTROL CENTER RONKONKOMA, NEW YORK

AutoCAD SHX Text 8-15-01: ASTA and Covered Walkway for FAA Review

AutoCAD SHX Text 10-31-01: Final; ASTA and Covered Walkway for FAA Review

AutoCAD SHX Text 11-21-01: FAA Review for ATOP & Support Area

AutoCAD SHX Text 06-29-01: FAA Review for Coverd Walkway

AutoCAD SHX Text 01-11-02: FAA Final Review for ATOP & Support Area

AutoCAD SHX Text 03-14-02: Consolidated Part A

AutoCAD SHX Text

AutoCAD SHX Text

OPERATIONS WING MODIFICATION

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text 3_

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text 3_

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text D_

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text S

697DCK-23-R-00165 amendment2
Amendment0002
Existing Lighting Plans
e06c5563-9bfe-4006-b853-61830b1009f9.pdf
Sheets and Views
Layout1
preview

File details come from the government source that posted it. Updated .