Presentation for Industry Final.pdf
PDF 871 KB Posted
- Attached to
- FAA Airport Traffic Control Tower Design Competition Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Design Challenge Q_A Set 3.pdf | ||
| 697DCK-22-R-00012 Amend 0002.pdf | ||
| Design Challenge Q_A Set 2.pdf | ||
| 697DCK-22-R-00012 Amend 0001.pdf | ||
| Design Challenge Q_A.pdf | ||
| J1 - Phase I RFI - FAA ATCT Design Competition .pdf | ||
| 697DCK-22-R-00012.pdf | ||
| DRAFT 697DCK-22-R-00012.pdf | ||
| DRAFT 697DCK-22-R-00012.pdf | ||
| DRAFT - J1 - Phase I RFI - FAA ATCT Design Competition.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Presented to:
By:
Date:
Federal Aviation AdministrationArchitect – Engineer
FAA Airport Traffic Control Tower (FAA) Design
Competition
“Our continuing mission is to provide the safest, most efficient aerospace system in the world.”
FAA and Industry
Thuylinh TranNguyen, Zane Edwards
November 9, 2021
Federal Aviation Administration
Agenda
• Welcome Message
Administrative Notes
• Schedule
• ATCT Design Competition Video
• Background
• Procurement Goal
• Tower Design Specifications
• Procurement Strategy
• Procurement Process
• Questions and Suggestions
• One on One Meetings
Schedule
2:00 – 2:45 Government Presentation to Industry & Q&A
2:45 – 2:55 Break
3:00 – 7:00 Vendor one-on-ones
ATCT Design Competition Video https://www.youtube.com/watch?v=IV9tEl7zCWY https://www.youtube.com/watch?v=IV9tEl7zCWY
Background
• The FAA has more than 100 aging control towers at regional and municipal airports across the United States that will eventually need to be replaced.
Procurement Goal
• The goal of the nationwide solicitation is to develop a standardized design for towers that will:
– Meet operational and cost requirements
– Maximize energy efficiency
– Be easy to modify according to height needs
– Be rapidly constructed
Tower Design Specifications The design must meet the following requirement:
1. Support an ATCT with a range of between 60 feet Above Ground Level (AGL) (cab floor) to 119 ft AGL (cab floor).
2. Enable a cost-efficient construction approach and/or enable an innovative approach that supports high throughput construction at multiple sites across the U.S. and U.S. Territories, both urban and rural.
3. Include one elevator, a mechanical floor, an electrical floor, an equipment room, and one dedicated office space. The elevator shall not service the top two floors.
4. Support a control cab.
5. Minimize the physical footprint of the facility.
6. Be well suited for the climate for multiple environments and be adaptable for seismic, high wind and hurricane, and different foundation types.
7. Incorporate sustainability considerations (i.e., increase efficiency, optimize performance, eliminate unnecessary use of resources, ensure the health of occupants, protect the environment, generate cost savings, and mitigate risks to assets).
8. Be aesthetically pleasing.
Procurement Strategy
• Competition Structure
– Full and Open Competition
• Contract Type
– Firm-Fixed-Price
• North American Industry Classification System Codes
– 541310: Architectural Services
• Period of Performance
– 12 months to complete design from contract award
Procurement Process
• Screening Information Request (SIR)
Stage Process
Phase I Request for Information (RFI) SIR: Offerors must submit an innovative design concept and execution approach that facilitates the rapid deployment of the new ATCT across the US; up to 15 successful Offerors will be selected to participate in Phase II
Phase II Request for Qualifications (RFQ) SIR: Offerors must submit financial capability and past performance / corporate experience of the proposed teaming arranging; up to 6 successful Offerors will be selected to participate in Phase III
Phase III Request for Offerors (RFO) SIR: Offerors must submit a 10% design as well as a conceptual construction/deployment plan for multiple towers, a cost proposal to advance the design to ~50% - 80%; one or more successful Offerors may be selected for an award; however, the FAA may decide not to award any winner in Phase III
Procurement Process Cont’d
• Evaluation Scoring Criteria
– Phase I: The highest 15 scores will be selected to participate in Phase II; scores from this phase will receive a weight of 70%
– Phase II: Scores from this phase will receive a weight of 30%, Phase I and II combined highest six scoring Offerors will be selected to participate in Phase III
– Phase III: The highest score(s) may be selected for award
Procurement Process Cont’d
• Contract Award
– One or more Offerors may be selected for award
– The FAA may decided to not award to any Offerors
– The FAA intends to execute purchase orders for $100,000 with each of the unsuccessful, pre-qualified offerors that are selected to participate in Phase III of the solicitation process, and submit complete design packages / proposals per solicitation requirements, but ultimately are not awarded the resultant contract. Said purchase orders will be executed at the completion of Phase III
– In order to receive an award, Offerors must be registered for SAM.gov
Acquisition Points of Contact
• Contracting Officer (Atlanta): Thuylinh TranNguyen Thuylinh.T.TranNguyen@faa.gov mailto:Thuylinh.T.TranNguyen@faa.gov
Questions and
Suggestions
Helpful Links
• How to register for SAM.gov
– https://www.youtube.com/watch?v=y2t5queourQ
• Register for DUNS number
– https://fedgov.dnb.com/webform/ https://www.youtube.com/watch?v=y2t5queourQ
| Architect – Engineer �FAA Airport Traffic Control Tower (FAA) Design Competition |
| Agenda |
| Schedule |
| ATCT Design Competition Video |
| Background |
| Procurement Goal |
| Tower Design Specifications |
| Procurement Strategy |
| Procurement Process |
| Procurement Process Cont’d |
| Procurement Process Cont’d |
| Acquisition Points of Contact |
| Slide Number 13 |
| Helpful Links |