Amendment A-0001.pdf

PDF 148 KB Posted

Attached to
Replace HVAC System at QCF ARSR, Clearfield, PA Federal contract opportunity
Solicitation number
697DCK-19-R-00305
Issued by
Department of Transportation Federal Aviation Administration Southern Region

About this file

Amendment A-0001 (pdf)

View the file

Other files for this federal contract opportunity

Other files attached to Replace HVAC System at QCF ARSR, Clearfield, PA, newest first.
File Type Posted
SIR - 697DCK-19-R-00305.pdf PDF
Attachment 1 - Statement of Work.doc DOC document
Attachment 2 - Drawings.pdf PDF
Attachment 2 - Drawings.pdf PDF
Attachment 1 - Statement of Work.doc DOC document
SIR - 697DCK-19-R-00305.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OMB Control No. 2120-0595 (SF-30) FAA Template No. 11 (8/97)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

A-0001 05/30/2019 WA-19-02738

6. ISSUED BY 7. ADMINISTRATED BY (If other than Item 6)

DOT/FEDERAL AVIATION ADMINISTRATION

SOUTHERN REGION, AAQ-570

1701 COLUMBIA AVENUE

COLLEGE PARK, GA 30337

DOT/FEDERAL AVIATION ADMINISTRATION

SOUTHERN REGION, AAQ-570

1701 COLUMBIA AVENUE

COLLEGE PARK, GA 30337

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

All Prospective Offerors.

9A. AMENDMENT OF SOLICITATION NO.

697DCK-19-R-00305

9B. DATED (SEE ITEM 11)

04/22/2019

10A. MODIFICATION OF CONTRACT/ORDER NO.

*TO BE COMPLETED BY VENDOR IF NOT COMPLETE 10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation on as amended, by one of the following methods:

(a) By completing Item 8 and 15, and returning 1 copies of the amendment; (b) acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hours and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE CONTRACT/ORDER NO.

AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Reference: 697DCK-19-R-00305 – Amendment –A – 0001 – Replace HVAC System at QCF ARSR, Clearfield, PA.

Please see attached page (Addendum to 697DCK-19-R-00305 Replace HVAC System – QCF ARSR). This amendment is being issued to include the attached page.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING SPECIALIST(Type or print)

James E. Love 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

(Signature of person authorized to sign)

BY

(Signature of Contracting Specialist)

05/30/2019

Addendum to 697DCK-19-R-00305 Replace HVAC System – QCF ARSR

1. AC-3 needs to have an 18kW 3-phase heater option installed. The model number called out in the scope of work does not include any backup heat. Although the existing AC-3 label does not show it, an 18kW heater was added to it during installation years ago.

2. There is a damper in the short section of ductwork leading to the workbench that does not show in either drawing.

3. A damper should exist in the reworked duct.

4. Summary Of Work Electrical (page 3) paragraph 5 should be ‘the outside disconnects should be NEMA-4X Stainless Steel’.

5. The temporary AC unit must remain operational in the Transmitter Room until both AC-1 & AC-4 and all their associated ductwork have been installed and checked out.

6. The same applies to the AC units in Electronics area.

7. The SSC wishes to keep any of the existing Thermostats that are not part of the final product.

8. The contractor must patch the holes through the exterior wall and match the existing siding and insulation.

9. New units shall be operational without issue for 24 hours prior to removing the old units used for temp cooling.

21. SF 30 - Amendment of Solicitation
21. QCF HVAC Proj Addendum

File details come from the government source that posted it.