Attachment J-3 Past Performance Survey.pdf

PDF 170 KB Posted

Attached to
WILMINGTON INTERNATIONAL AIRPORT TRAFFIC CONTROL TOWER BASE BUILDING ROOF REPLACEMENT AND ARCHITECHTURAL REPAIRS
Solicitation number
697DCK-19-R-00075
Issued by

About this file

Attachment J-3 Past Performance Survey (pdf)

View the file

Other files

File Type Posted
Attachment J-1f ILM Drawings.pdf PDF
Business Declaration Form.pdf PDF
697DCK-19-R-00075.pdf PDF
Attachment J-1c Request for Information.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-1 ILM ATCT Specifications_Amendment 0001.pdf PDF
Attachment J-1e Asbestos and Lead Based Paint Survey.pdf PDF
697DCK-19-R-00075, Amendment 0001.pdf PDF
Site Visit Log.pdf PDF
Attachment J-1d Product Substitution Request.pdf PDF
Attachment J-1a Notice of Proposed Construction or Alteration.pdf PDF
Attachment J-1b Approvlal or Disapproval of Contractor's Materials or Shop Drawings.pdf PDF
Attachment J-1 ILM ATCT Specifications.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
697DCK-19-R-00075, Amendment 0002.pdf PDF
Attachment J-1b Approvlal or Disapproval of Contractor's Materials or Shop Drawings.pdf PDF
Attachment J-1a Notice of Proposed Construction or Alteration.pdf PDF
697DCK-19-R-00075, Amendment 0001.pdf PDF
Attachment J-1e Asbestos and Lead Based Paint Survey.pdf PDF
Attachment J-1d Product Substitution Request.pdf PDF
Site Visit Log.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-1c Request for Information.pdf PDF
Attachment J-1 ILM ATCT Specifications.pdf PDF
697DCK-19-R-00075.pdf PDF
Attachment J-1 ILM ATCT Specifications_Amendment 0001.pdf PDF
Attachment J-1f ILM Drawings.pdf PDF
Business Declaration Form.pdf PDF
Attachment J-1 ILM ATCT Specifications.pdf PDF
697DCK-19-R-00075.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-1a Notice of Proposed Construction or Alteration.pdf PDF
Attachment J-1c Request for Information.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-1b Approvlal or Disapproval of Contractor's Materials or Shop Drawings.pdf PDF
Attachment J-1e Asbestos and Lead Based Paint Survey.pdf PDF
Attachment J-1f ILM Drawings.pdf PDF
Business Declaration Form.pdf PDF
Attachment J-1d Product Substitution Request.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-1 ILM ATCT Specifications.pdf PDF
Attachment J-1c Request for Information.pdf PDF
Attachment J-1d Product Substitution Request.pdf PDF
697DCK-19-R-00075.pdf PDF
Attachment J-1a Notice of Proposed Construction or Alteration.pdf PDF
Attachment J-1b Approvlal or Disapproval of Contractor's Materials or Shop Drawings.pdf PDF
Attachment J-1e Asbestos and Lead Based Paint Survey.pdf PDF
Attachment J-1f ILM Drawings.pdf PDF
Show 40 more

Latest 50 of 58 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE SURVEY (PAGE 1 OF 2)

697DCK-19-R-00075

SECTION 1 -- TO BE COMPLETED BY THE OFFEROR AND PROVIDED TO THE CUSTOMER REFERENCE

Name of Firm Being Evaluated: ______________________________________________

Project Title & Location: ____________________________________________________

Project Dollar Value:_________________________________________________________

Year Completed: _________________ Project Manager: _________________________

SECTION 2 -- TO BE COMPLETED BY THE CUSTOMER REFERENCE AND EMAILED DIRECTLY TO:

Katherine.fogle@faa.gov

Forms submitted by other than the customer (i.e., by the offeror), will not be considered.

In blocks below, please indicate your overall level of satisfaction with work performed by the firm shown in Section 1. Mark Not Applicable (N/A) for any areas that do not apply. Please Provide any additional comments on page 2.

On this project, the firm: Satisfaction Low High N/A

1. Met contract requirements 1 2 3 4 5 N/A

2. Managed project schedule 1 2 3 4 5 N/A

3. Communicated effectively 1 2 3 4 5 N/A

4. Managed project cost controls 1 2 3 4 5 N/A

5. Manage employees, including subcontractors 1 2 3 4 5 N/A

6. Maintained an effective quality control and safety program 1 2 3 4 5 N/A

7. Your OVERALL Level of Customer Satisfaction 1 2 3 4 5 N/A

CUSTOMER SATISFACTION SURVEY (PAGE 2 OF 2)

697DCK-19-R-00075

mailto:Katherine.fogle@faa.gov

8. REMARKS: (Please speak to QUALITY OF PRODUCT PRODUCED / ADHERENCE TO PROJECT

SCHEDULE / PROJECT MANAGEMENT)

Your Name: ____________________________________ Phone Number: ______________________

Firm Name: ________________________________________________________

Relationship to this Project: ___________________________________________________________

File details come from the government source that posted it.