697DCK-18-R-00637, Amendment 0002.pdf

PDF 58 KB Posted

Attached to
Fire Life Safety Upgrades for the Sacramento Airport Air Traffic Control Tower (ATCT) and Base Building.
Solicitation number
697DCK-18-R-00637
Issued by

About this file

697DCK-18-R-00637, Amendment 0002 (pdf)

View the file

Other files

File Type Posted
Attachment J-1d CAB and Hatch Pictures.pdf PDF
Attachment J-1c Structural Analysis Appendix.pdf PDF
Attachment J-1b SMF ATCT Structural Drawing Set.pdf PDF
697DCK-18-R-00637, Amendment 0001.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-1 Statement of Work_Revised.pdf PDF
697DCK-18-R-00637, Amendment 0004.pdf PDF
697DCK-18-R-00637, Amendment 0002.pdf PDF
Site Visit Log.pdf PDF
697DCK-18-R-00637.pdf PDF
Attachment J-1a SMF ATCT Final Design Drawings_Revised.pdf PDF
Attachment J-1 Statement of Work.pdf PDF
697DCK-18-R-00637, Amendment 0005.pdf PDF
697DCK-18-R-00637, Amendment 0006.pdf PDF
Attachment J-1a SMF Drawings.pdf PDF
697DCK-18-R-00637, Amendment 0003.pdf PDF
Attachment J-1 Statement of Work_Amendment 0001.pdf PDF
697DCK-18-R-00637.pdf PDF
697DCK-18-R-00637, Amendment 0003.pdf PDF
697DCK-18-R-00637, Amendment 0005.pdf PDF
697DCK-18-R-00637, Amendment 0002.pdf PDF
697DCK-18-R-00637, Amendment 0001.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
Attachment J-1c Structural Analysis Appendix.pdf PDF
Attachment J-1d CAB and Hatch Pictures.pdf PDF
Attachment J-1a SMF Drawings.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Attachment J-1a SMF ATCT Final Design Drawings_Revised.pdf PDF
697DCK-18-R-00637, Amendment 0004.pdf PDF
Attachment J-1 Statement of Work_Amendment 0001.pdf PDF
Attachment J-1 Statement of Work.pdf PDF
Site Visit Log.pdf PDF
Attachment J-1 Statement of Work_Revised.pdf PDF
697DCK-18-R-00637, Amendment 0006.pdf PDF
Attachment J-1b SMF ATCT Structural Drawing Set.pdf PDF
Attachment J-1d CAB and Hatch Pictures.pdf PDF
Attachment J-1c Structural Analysis Appendix.pdf PDF
Attachment J-1b SMF ATCT Structural Drawing Set.pdf PDF
Attachment J-1a SMF ATCT Final Design Drawings_Revised.pdf PDF
Attachment J-1a SMF Drawings.pdf PDF
697DCK-18-R-00637.pdf PDF
Attachment J-1 Statement of Work.pdf PDF
Attachment J-3 Past Performance Survey.pdf PDF
Site Visit Log.pdf PDF
Attachment J-2 Wage Determination.pdf PDF
697DCK-18-R-00637, Amendment 0001.pdf PDF
697DCK-18-R-00637, Amendment 0006.pdf PDF
Attachment J-1 Statement of Work_Amendment 0001.pdf PDF
697DCK-18-R-00637, Amendment 0005.pdf PDF
Show 40 more

Latest 50 of 123 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 2

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/27/2018

4. REQUISITION/PURCHASE REQ.NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE AAQ510ATL-AFN 7. ADMINISTERED BY (If other than Item 6) CODE

FEDERAL AVIATION ADMINISTRATION

AAQ-500 - REGIONAL ACQUISITIONS

1701 COLUMBIA AVENUE

COLLEGE PARK GA 30337

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (x) 9A. AMENDMENT OF SOLICITATION NO.

697DCK-18-R-00637

x 9B. DATED (SEE ITEM 11)

09/05/2018

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

x The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, x is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required.)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, x is required to sign this document and return 1 copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0002 is issued to extend the proposal due date from October 1, 2018 at 15:00 MT to October 5, 2018 at 15:00 MT. Any proposal received after 15:00 MT on October 5, 2018 will be considered non-responsive and will not be eligible for award. Proposals must include all of the documents required in Section L and Section M to be eligible for award.

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Katherine Fogle

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. CONTRACT AUTHORITY

Digitally signed by Katherine Furman

Katherine Furman Fogle Fogle Date: 2018.09.27 10:13:20 -06'00'

(Signature of Contracting Officer)

16C. DATE SIGNED

9/27/18

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED

697DCK-18-R-00637/0002

PAGE OF

2 2

NAME OF OFFEROR OR CONTRACTOR

ITEM NO.

(A)

SUPPLIES/SERVICES

(B)

QUANTITY

(C)

UNIT

D)

UNIT PRICE

(E)

AMOUNT

(F)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
Amendment 0002 is issued to extend the proposal due date from October 1, 2018 at 15:00 MT to October 5, 2018 at 15:00 MT. Any proposal received after 15:00 MT on October 5, 2018 will be considered non-responsive and will not be eligible for award. Pro...

File details come from the government source that posted it.