RFI 4 Q.docx

DOCX document 12 KB Posted

Attached to
AIR HANDLING UNIT (AHU) 1-10 REPLACEMENT, SALT LAKE CITY, UT RFI #4 WITH RESPONSES
Solicitation number
697DCK-18-R-00563
Issued by

About this file

RFI 4 Q (docx)

View the file

Other files

File Type Posted
Final Spec Rev1 07242018.pdf PDF
SF_30_3 AHU SLC.pdf PDF
Final Spec Rev1 07242018.pdf PDF
RFI 2.docx DOCX document
SF_30_1 AHU SLC.pdf PDF
RFI.docx DOCX document
1442 697DCK-18-R-00563.pdf PDF
SF_30_4 AHU SLC.pdf PDF
RFI-3docx.docx DOCX document
Past Performance Survey 00563.docx DOCX document
Sol_697DCK-18-R-00563 comments.pdf PDF
WAGE RATES UT108.txt TXT text file
SF_30_2 AHU SLC.pdf PDF
Sol_697DCK-18-R-00563 comments.pdf PDF
RFI-3docx.docx DOCX document
SF_30_3 AHU SLC.pdf PDF
RFI.docx DOCX document
1442 697DCK-18-R-00563.pdf PDF
WAGE RATES UT108.txt TXT text file
Final Spec Rev1 07242018.pdf PDF
Past Performance Survey 00563.docx DOCX document
SF_30_1 AHU SLC.pdf PDF
Final Spec Rev1 07242018.pdf PDF
SF_30_2 AHU SLC.pdf PDF
RFI 2.docx DOCX document
RFI.docx DOCX document
Past Performance Survey 00563.docx DOCX document
SF_30_1 AHU SLC.pdf PDF
1442 697DCK-18-R-00563.pdf PDF
Final Spec Rev1 07242018.pdf PDF
Sol_697DCK-18-R-00563 comments.pdf PDF
SF_30_2 AHU SLC.pdf PDF
WAGE RATES UT108.txt TXT text file
Final Spec Rev1 07242018.pdf PDF
RFI 2.docx DOCX document
Final Spec Rev1 07242018.pdf PDF
SF_30_1 AHU SLC.pdf PDF
Past Performance Survey 00563.docx DOCX document
Sol_697DCK-18-R-00563 comments.pdf PDF
1442 697DCK-18-R-00563.pdf PDF
RFI.docx DOCX document
Final Spec Rev1 07242018.pdf PDF
WAGE RATES UT108.txt TXT text file
Final Spec Rev1 07242018.pdf PDF
WAGE RATES UT108.txt TXT text file
Past Performance Survey 00563.docx DOCX document
1442 697DCK-18-R-00563.pdf PDF
Final Spec Rev1 07242018.pdf PDF
Sol_697DCK-18-R-00563 comments.pdf PDF
Final Spec Rev1 07242018.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q.

There is a conflict between the mechanical and electrical plans. The electrical plans call out for 30 AMP circuits feeding the units. This is sufficient if the I tia have hot water reheat. Since the units are electric reheat, 30 Amps is not sufficient. Please advise what size circuit and where it shall be pulled from.

A.

The following units will not have electric reheat or HW reheat per drawing m103:

AHU 1,3,4,5,6,7,8,9,10.

Only units OAH-1(SF-1) and AHU 2 have HW reheat.