16 SOW_RCAG and RTR, Pitts - 11Dec17.pdf

PDF 17 KB Posted

Attached to
Replacement of Antenna Towers at the Pittsburgh RCAG & RTR, Pittsburgh, Pennsylvania.
Solicitation number
697DCK-18-R-00090
Issued by

About this file

16 SOW_RCAG and RTR, Pitts - 11Dec17 (pdf)

View the file

Other files

File Type Posted
16 Drawings RTR Pitts - 24May17.pdf PDF
16 SPECs RTR Pitts - 24May17.pdf PDF
21 Amend1 Signed - 26Feb18.pdf PDF
16 GFM RTR Pitts - 11Dec17.pdf PDF
16 Specs RCAG Pitts - 24May17.pdf PDF
16 Drawings RCAG Pitts - 24May17.pdf PDF
16 SOW_RCAG and RTR, Pitts - 11Dec17.pdf PDF
16 CostBreakdown RTR_Pitt - 8Jan18.pdf PDF
SIR 697DCK-18-R-00090.pdf PDF
16 PPQ 697DCK18R00090_Pitts- 8Jan18.pdf PDF
16 GFM RCAG Pitts - 11Dec17.pdf PDF
16 CostBreakdown RCAG_Pitt - 8Jan18.pdf PDF
16 WD Allegheny_RCAG&RTR Pitts - 5Jan18.pdf PDF
21 Amend2 Signed - 27Feb18.pdf PDF
16 WD Allegheny_RCAG&RTR Pitts - 5Jan18.pdf PDF
16 GFM RTR Pitts - 11Dec17.pdf PDF
SIR 697DCK-18-R-00090.pdf PDF
16 Drawings RCAG Pitts - 24May17.pdf PDF
16 PPQ 697DCK18R00090_Pitts- 8Jan18.pdf PDF
16 CostBreakdown RCAG_Pitt - 8Jan18.pdf PDF
16 CostBreakdown RTR_Pitt - 8Jan18.pdf PDF
21 Amend1 Signed - 26Feb18.pdf PDF
16 GFM RCAG Pitts - 11Dec17.pdf PDF
16 Drawings RTR Pitts - 24May17.pdf PDF
16 SPECs RTR Pitts - 24May17.pdf PDF
16 Specs RCAG Pitts - 24May17.pdf PDF
16 Specs RCAG Pitts - 24May17.pdf PDF
16 PPQ 697DCK18R00090_Pitts- 8Jan18.pdf PDF
SIR 697DCK-18-R-00090.pdf PDF
16 SPECs RTR Pitts - 24May17.pdf PDF
16 CostBreakdown RCAG_Pitt - 8Jan18.pdf PDF
16 SOW_RCAG and RTR, Pitts - 11Dec17.pdf PDF
16 GFM RCAG Pitts - 11Dec17.pdf PDF
16 Drawings RTR Pitts - 24May17.pdf PDF
16 Drawings RCAG Pitts - 24May17.pdf PDF
16 GFM RTR Pitts - 11Dec17.pdf PDF
16 CostBreakdown RTR_Pitt - 8Jan18.pdf PDF
16 WD Allegheny_RCAG&RTR Pitts - 5Jan18.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RCAG TOWER REPLACEMENT

PITTSBURGH (PIT) RCAG

JANUARY 9, 2017

Summary of the Work

1.4 WORK AT THE RCAG SITE:

• Perform the earthwork, site grading and surfacing, associated with the construction of the antenna tower foundations, cable duct and tower grounding.

• Construct two 17.5-foot x 17.5-foot x 4-foot concrete foundations.

• The work also includes the tower cabling and facility grounding system, restoration of areas during construction, and installation of appurtenances as described herein or indicated on the drawings.

• Offload and erect two (2) 80 foot FAA furnished antenna towers. The work also includes installation of PVC conduit and GFM 7/8” heliax cables from the top of the new towers to the building.

• The towers will come completely unassembled. Grounding components will not be supplied with the towers.

• After a two (2) week period in which the FAA will make the new towers operational, remove and dispose of the old towers.

• At the end of the project submit redline drawings and other items in the specifications under contract closeout.

Summary of the Work

1.5 WORK AT THE RTR SITE:

• Perform the earthwork, site grading and surfacing, associated with the construction of the antenna tower foundations, cable duct and tower grounding.

• Construct four 17.5-foot x 17.5-foot x 4-foot concrete foundations.

• The work also includes the tower cabling and facility grounding system, restoration of areas during construction, and installation of appurtenances as described herein or indicated on the drawings.

• Offload and erect four (4) 80 foot FAA furnished antenna towers. The work also includes installation of PVC conduit and GFM 1/2” heliax cables from the top of the new towers to the building.

• The towers will come completely unassembled. Grounding components will not be supplied with the towers.

• After a two (2) week period in which the FAA will make the new towers operational, remove and dispose of the old towers.

• At the end of the project submit redline drawings and other items in the specifications under contract closeout.