This document outlines a solicitation for janitorial services at Federal Aviation Administration facilities in Columbia, South Carolina. The solicitation seeks to award a firm-fixed price contract set aside for total small business to provide janitorial services at the Columbia Air Traffic Control Tower and Tech Ops/AT Building beginning April 1, 2023 for a one year base period plus four one-year options. Services include vacuuming, mopping, cleaning restrooms and windows, trash removal, and other janitorial tasks according to the specified schedule. Interested offerors must attend a mandatory site visit on January 30, 2024 and submit proposals by February 20, 2024. The contract award is currently scheduled for an unspecified date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

REQUIREMENT FOR

JANITORIAL SERVICES

WEST COLUMBIA, SOUTH CAROLINA

1. GENERAL INFROMATION: This contract is for the Federal Aviation Administration (FAA) requirements for certain janitorial services required at its facilities located on and around the Columbia Metropolitan Airport, West Columbia, South Carolina.

The contractor is to furnish all labor, tools, equipment, supplies and material required to provide the services, indicated herein, in accordance with the schedules and specifications.

2. HOURS OF WORK: The janitorial requirement for the Air Traffic Control Tower Building, Technical Operations District Office Building/Air Traffic Building must be completed between the hours of 4:00 p.m. and 9:30 p.m. on weekdays and between 7:30 a.m. and 6:00 p.m. on weekends (including holidays). Cleaning in the break-room in the Air Traffic building and AF/AT building is not allowed from 11:00 a.m. – 1:00 p.m.

and 5:00 p.m. –7:00 p.m. to allow for lunch breaks.

3. STANDARDS: Supplies and materials furnished by the contractor must be rated good or better grade by the industry and/or trade and customarily used for that purpose.

Cleaning supplies that have toxic/pungent fumes or highly flammable are prohibited. In addition to regular cleaning supplies, the contractor will also supply all hand soap, paper towels, toilet paper, trash liners for 33 gallon containers and liners for 10 gallon containers which are at each desk and various other locations. Fixture counts are approximate: Trashcans-51, Bathrooms-6, Toilets-9, Sinks-9, Paper towel dispensers-7.

All work shall be accomplished in a first-class, workmanlike manner according to the terms and specifications of this contract. Hasty and/or careless performance will not be acceptable and penalties as provided elsewhere will be enforced.

5. UTILITIES: The FAA will provide at no cost all electrical power, hot and cold water necessary to accomplish the work. Since there is no water available at the remote facilities, the contractor will have to provide containers to transport water to those facilities.

6. STORAGE: The FAA will provide two (2) storage areas, one of 30 sq. feet and one of 24 sq. feet, for the contractor’s janitorial supplies and equipment. It shall be the contractor’s responsibility to keep the designated storage space clean, neat and odor free. The FAA will revoke the storage privilege if the contractor fails to maintain the space in a neat and clean manner. The storage of highly flammable liquids/materials is expressly prohibited.

7. WORK SCHEDULE: The contractor will be required to prepare and provide for approval, a complete work schedule to accomplish all scheduled work under this contract to the local contracting officers representative. The work schedule must be provided within two weeks of the starting date for the contract.

8. SECURITY: The FAA requires strict security in some of the work areas. It shall be the contractor’s responsibility to ensure all doors that have been unlocked by or for him shall be locked when leaving the area. The contractor may be required to sign in and out of the buildings.

9. ORIENTATION: The FAA will provide the contractor a one-time orientation of the facilities. It shall then be the contractor’s responsibility to provide proper orientation for any employee who performs work under this contract. Missed work because of improper orientation is not acceptable.

10. HAZARDOUS SUBSTANCES: The contractor shall notify the facility manager prior to introducing any hazardous substance into the workplace. The contractor will provide the following information:

a) The type of hazardous material

b) Material Safety Data Sheets (MSDS) for all hazardous substances the contractor will use

c) The method the contractor will use to inform the FAA of any precautionary measures that need to be taken to protect FAA employees.

11. WORK REQUIREMENTS: Work requirements for this contract are listed on the attached Schedules and Specifications. The frequency of the work required is indicated upon the schedules in accordance with the following symbolic chart:

SYMBOL MEANING

D7 Daily, seven days per week D5 Daily, five days per week, Monday through Friday D4 Daily, four days per week D3 Daily, three days per week 2W Twice weekly, usually Tuesday and Friday W Weekly, once per week BW BI-Weekly, every other week W/M Weekly and monthly requirements M Monthly, once per month BM BI-Monthly, every other month Q Quarterly, every third month SA Semi-Annual, every six months A Annual, once per year N No work required -- Not applicable, no work required

JANITORIAL SPECIFICATIONS

1. VACUUM CARPET: All exposed carpet shall be thoroughly cleaned with an industrial grade machine. Vacuum cleaning inside the TRACO and ATCT tower cab shall be done with the government provided vacuum system. Built-in bookcases, credenzas, cabinets and tables do not have to be moved for cleaning. However, the contractor shall keep the carpet areas in corners, along walls, around and under furniture free from dirt and dust build-up of appropriate attachments or other means.

2. CARPET CLEANING: Steam clean or dry clean all carpet using a suitable machine designed for this purpose. The carpet shall be vacuumed clean prior to applying any cleaning agents. Care shall be taken to prevent the carpet from becoming saturated. All furniture must be moved during this operation.

3. SWEEP FLOORS/STAIRS: All tile and/or concrete floors/stairs shall be swept clean in accordance with the schedule. Sweeping compound or properly treated dust mops are to be used to keep dust to a minimum. Corners and other areas that are not accessible to large brooms/mops will be cleaned by rag, brush or other suitable means.

4. MOP FLOOR: Floors shall be mopped with hot or warm water with detergent to remove dirt and grime from the floor and then mopped with clean water to rinse any remaining dirt or detergent film. When dry, the floor shall be clean and free of dirt and streaks. Splashing and/or splattering of dirty water and/or detergent on walls, furniture, fixtures or equipment is not permitted and must be removed.

5. MOP/BUFF TILE FLOOR: Clean, damp mop and power buff all floor surfaces.

Heavy furniture does not have to be moved. Stubborn dirt and traffic marks must be removed with fine steel wool or suitable nylon pads. Supplies, equipment, and methods used must provide a clean and properly buffed surface.

6. MOP/WAX/BUFF TILE FLOOR: Clean and damp mop floor surface. Heavy furniture does not have to be moved. Remove stubborn dirt and traffic marks with fine steel wool or suitable nylon pads. Apply one heavy coat of non-slip (not self-polishing) floor wax and power buff to provide a clean and properly buffed surface. Care must be exercised in application of wax. Any wax splashed or splattered upon walls, furniture, fixtures or equipment must be removed.

7. MOP/STRIP/WAX/BUFF TITLE FLOOR: Remove all existing wax from the floor with a suitable stripping agent and pads. Rinse the floor a minimum of two (2) times to remove all old wax and debris. When the floor is thoroughly clean and dry, apply a minimum of two (2) heavy coats of non-slip (not self-polishing) floor wax. Power buff to provide a clean and properly buffed surface. Any wax or stripping agent splashed or splattered upon walls, furniture, fixtures or equipment must be removed. Heavy furniture does not have to be removed.

8. CLEAN PLUMBING FIXTURES AND MIRRORS: With a clean rag or sponge dipped in a solution of clean water, detergent and germicide clean all fixtures including wash basins, pipes, faucets, toilets and seats (top and bottom), dispensers, partitions and entrance doors. The wall area immediately adjacent to each item above must also be cleaned. Damp wipe all cleaned surfaces with clean water. Polish mirrors with a lint free soft cloth or paper towel. Clean each toilet bowl and urinal with cleaning solution and bowl brush.

9. PAPER AND TRASH REMOVAL: Empty all wastebaskets and trash containers in accordance with schedule. All containers shall be kept clean and odor free. Replace liners, wash and/or deodorize as required. Paper, trash, shipping cartons and packaging materials shall be removed and deposited in the outside dumpster provided.

Care shall be taken to prevent paper and/or trash from becoming windblown. The dumpster shall be closed after each use. Replace trash can liners in large waste receptacles in tower cab daily. Paper recycling containers are positioned at each desk and computer workstation. These are to be emptied daily or when half full into larger container located in each large work area.

10. SPOT CLEAN WALLS/PARTITIONS: Walls and partitions are to be spot cleaned with warm water and commercial detergent to remove spots, smudges, fingerprints, grease and furniture marks. If spot cleaning results in a noticeable shading, the entire section must be cleaned. Care must be exercised to prevent drips and spills.

This requirement includes only those areas that may be reached while standing on the floor.

11. CLEAN FURNITURE: Metal and plastic furniture surfaces are to be dusted and wiped clean of dirt, smudges and fingerprints using clean water and detergent. Wood surfaces are to be dusted and wiped clean with a suitable furniture polish. Cloth upholstery on furniture shall be thoroughly vacuumed and spot cleaned with upholstery cleaner.

12. REPLENISH SOAP AND PAPER: All soap, paper towel and toilet paper dispensers/holders are to be serviced and replenished in accordance with the schedule.

Stock levels shall be maintained to assure adequate supplies until the next scheduled servicing.

13. CLEAN LIGHT FIXTURE, SPOT CLEAN WALLS ON CEILING: The upper portions of walls and partitions, light fixtures, ceiling and air vents are to be spot cleaned with warm water and detergent to remove spots, smudges, fingerprints, grease and soot.

If spot cleaning results in noticeable shading, the entire section must be cleaned. Care must be exercised to prevent drips and spills. A stepladder or appropriate stand is required to reach this cleaning requirement.

14. DUST: While standing on the floor, remove all dust from furniture, window sills and any other surface that may be reached. A vacuum cleaner or properly treated dust rags shall be used to prevent dust from becoming airborne. The dusting of office desks/ furniture is required each time the office is visited. Papers or working material will not be disturbed during the dusting process. DUSTING OF ELECTRONICS EQUIPMENT IS

NOT REQUIRED.

15. CLEAN GLASS WINDOWS, DOORS, WALLS: Clean inside and/or outside in accordance with schedule. Remove all foreign matter, dirt and scum. The method and materials used shall ensure that the surfaces are clean and free of film, streaks, stains and lint. Floors, walls, furniture and equipment shall be protected from spills, drips and stains during the cleaning process.

16. VENETIAN BLINDS: Clean all venetian blinds in accordance with the schedule.

Dust and dirt must be dislodged and allowed to become airborne during cleaning. Cords and/or bindings shall not be saturated with water or cleaning solutions.

17. BRIGHT METAL: Bright metal surfaces shall be cleaned with appropriate detergents and polished/buffed with a clean soft cloth. Kept free of finger prints,smudges. Application of some metal polish may be required on an infrequent basis to maintain the original luster.

18. POLICE: Police area around building entrances, pickup and dispose of paper and other trash. Sweep/clean as required to keep entrances neat and free of spider webs, insect nests and other debris.

19. READY ROOM: Wipe down tables, chairs, stove, refrigerator, sink and trash containers with a clean cloth or sponge dampened with detergent. After cleaning, wipe all surfaces with clean cloth and clean water. These will be free of smudges, debris, streaks. Replace trash container liners daily and deodorize container.

20. REFRIGERATORS : Refrigerators shelves, door panels, walls, and drawers will be wiped down with a clean cloth or sponge dampened with detergent. Any items left in the refrigerator will be disposed of in the trash. Refrigerators in the same building will be on rotating schedules. Cleanings will happen on the first of every month.

EXHIBIT A

FACILITIES INDENTIFICATION AND LOCATION

WEST COLUMBIA, SOUTH CAROLINA

FACILITY SQ. FT. FLOOR LOCATION

ATCT BLDG. 8,480 Approximately ¼ Mile east of Columbia Metro Airport

Technical Operations 12,600 Across the street from and AT Bldg. Air Traffic Control Tower

Task INCRIMENT

1. Gather & Dispose of Trash 6D

2. Dust Mop Tiled floors 5D

3. Wet Mop Tile Floors W

4. Buff Waxed Floors M

5. Wet Mop,Wax & Polish Waxed Floors SA

6. Strip, Wax & Machine Polish Floors A

7. Vacuum Carpeting 5D

8. Shampoo or Steam Clean Carpets A

9. Clean Plumbing Fixtures & Mirrors 5D

10.Clean Restroom Floors 5D

11. Clean & Refill Soap Dispensers 5D

12. Was Restroom Walls & Doors SM

13. Replace Light Bulbs M

14. Dust All Furniture 5D

15. Vacuum Cloth Chairs Q

16. Dust Ledges & Other Flat surfaces W

17. Spot Clean Woodwork, Walls & Floors W

18. Remove Scuff Marks & Stains on

Furniture 4D

19. Wash and Clean inside Windows M

20. Clean Light fixtures Q

21. Clean Glass Doors 5D

22. Clean Windows (outside) M 23.Clean Glass Walls A

24. Clean Stairwells SW

25. Clean Shower Stall W

26. Spot Wash Elevator Walls & Doors W 27.Spot Clean Lockers, Walls& Floors W

28. Clean Microwave Oven W

29. Defrost & Clean Refridgerators Q

30. Clean All Metal& Hardware W

31. Shampoo Controller Chairs SA/AN

32. Spot Clean Cab Shades M

33. Wash Cab Shades EVERY 3 WEEKS

34. Pickup Trash & Paper Outside Building 5D

35. Clear Snow/ Debris from Sidewalk 7D

Legend 4 Days a Week 4D 5 days a week 5D 6 Days a week 6D 7 Days a week 7D

Weekly W Semi-Weekly SW

Semi-Monthly SM Monthly M Quarterly Q

Semi-Annually SA Annually A

As Needed AN