6973GH-25-R-00162.pdf
PDF 347 KB Posted
- Solicitation number
- 6973GH-25-R-00162
About this file
This is a Federal Aviation Administration (FAA) Solicitation for Indefinite-Delivery/Indefinite-Quantity (IDIQ) contract for ASR-9 Rotary Joint Slip Rings, specifically NSN 5999-01-442-3976, Moog Inc. part number D1619-100P1. The solicitation (Number 6973GH-25-R-00162) seeks a single contractor to provide slip ring assemblies for Airport Surveillance Radar (ASR-9) field radar sites, with a one-year base period and three optional years. Only proposals for the specified Moog slip ring will be accepted, with an anticipated contract award focused on the lowest-priced, responsible offeror.
Key details include a proposal submission deadline of June 26, 2025 at 2:00 PM Central Time via email, with proposals to be sent to connie.m.houpt@faa.gov. The contract will cover multiple line items: a base period of 30 units and three option periods of 50 units each. Contractors must be registered in the System for Award Management (SAM) and comply with various federal contracting requirements. The procurement is classified under NAICS code 335312 (Motor and Generator Manufacturing) with a size standard of 1,250 employees, and will utilize full and open competition.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 6973GH-25-R-00162 A0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD
3. SOLICITATION TYPE1. CONTRACT NO. 2. SOLICITATION NUMBER
6. ISSUED BY CODE 7. ADDRESS OFFER TO (If other than Item 6)
5. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder"
NEGOTIATED BID (RFP)
SEALED BID (IFB)
4. DATE ISSUED
PAGE OF PAGES
1 61
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
9. FOR
INFORMATION
CALL
CAUTION: LATE Submissions, Modifications and Withdrawals. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 7, or if hand carried, in the
SOLICITATION
8. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTR., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICE/COST
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
10. TABLE OF CONTENTS
17. OFFER DATE16. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
14C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
14B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
15. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER14A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
13. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)12. DISCOUNT FOR PROMPT PAYMENT the designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above , to furnish any or all items upon which prices are offered at the price set opposite each item , delivered at
11. In compliance with the above, the undersigned agrees, if this offer is accepted within ______________ calendar days (60 calendar days unless a different period is inserted
NOTE: Item 11 does not apply if the solicitation includes Minimum Bid Acceptance Period .
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or by other authorized official written notice.
27. AWARD DATE
(Signature of Contracting Officer)
26. CONTRACT AUTHORITY
24. PAYMENT WILL BE MADE BY
25. NAME OF CONTRACTING OFFICER (Type or print)
CODE 23. ADMINISTERED BY (If other than Item 6)
ITEM
(4 copies unless otherwise specified)
22. SUBMIT INVOICES TO ADDRESS SHOWN IN21. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
20. ACCOUNTING AND APPROPRIATION19. AMOUNT18. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by CONTRACT AUTHORITY)
CODE
06/04/2025 X
AAQ710-AFN
AAQ-710 LOGISTICS CENTER ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
OKLAHOMA CITY OK 73125
1400 CT 06/26/2025
Connie M. Houpt 405 connie.m.houpt@faa.gov
954-7854
X
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Connie M. Houpt
6973GH-25-R-00162
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 61
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
6973GH-25-R-00162
00001 BASE CONTRACT PERIOD 30 EA
NSN 5999-01-442-3976
ASR-9 Rotary Joint Slip Rings P/N D1619-100P1
Electronic & IT: 03
00002 FIRST OPTION PERIOD 50 EA
NSN 5999-01-442-3976
ASR-9 Rotary Joint Slip Rings P/N D1619-100P1
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: )
00003 SECOND OPTION PERIOD 50 EA
NSN 5999-01-442-3976
ASR-9 Rotary Joint Slip Rings P/N D1619-100P1
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: ) 0
00004 THIRD OPTION PERIOD 50 EA
NSN 5999-01-442-3976
ASR-9 Rotary Joint Slip Rings P/N D1619-100P1
Electronic & IT: 03
(Option Line Item)
(Expected Exercise Date/Days After Award: ) 0
Section A - Solicitation/Contract Form
Section B - Supplies or Services/Prices Section B - Schedule
Please refer to Schedule B, page 2. Supplies/Services.
Only proposals for NSN 5999-01-442-3976 Moog Inc. part number D1619-100P1 will be accepted.
This is an Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The precise quantities of slip ring assemblies required are unknown and will be ordered as needed with the issuance of delivery orders. Estimated requirements are not a representation to an offeror or contractor that the estimated quantity will be ordered, or that conditions affecting requirements will be stable or normal. The only person authorized to either issue or modify delivery orders under this IDIQ contract is the Contracting Officer.
The minimum obligation under this contract is one (1) slip ring assembly. This amount (at least) will be obligated on the first delivery order, issued concurrently with the contract. The Government has no obligation to order additional quantities or issue additional delivery orders to the contractor beyond the minimum obligation specified above. The maximum obligation under this contract will be established at contract award.
Clause List
The remainder of this page has been intentionally left blank.
Section C - Description/Specifications Scope of Work
Clause List
C.1 SCOPE OF WORK
The Contractor shall furnish all required labor, facilities, equipment, fixtures, parts, supplies, materials, tools, test equipment, appropriate technical data/expertise, to provide slip ring assemblies, NSN 5999-01-442-3976, part number D1619-100P1, manufactured by Moog Inc. to be used in the Airport Surveillance Radar (ASR-9) system in accordance with all terms, conditions, and provisions set forth herein.
Section D - Packaging and Marking Clause List
AC2102 PRESERVATION, PACKAGING, PACKING AND MARKING (JUL 1997)
(a) All items unless otherwise specified shall be individually packaged to American Society for Testing and Materials (ASTM) D 3951 (packaging). Performance testing of packaging will be IAW ASTM D 4169 assurance level II distribution cycle 18.
(b) All items shall be marked IAW Mil STD 129 ‘Marking for Shipment and Storage’. Bar coding is required, 128 symbology is preferred; however, 3 of 9 will be accepted.
(c) Common hardware items shall be packaged in multiple unit pack quantities compatible with the unit of issue (UI) or Quantity per unit pack (QUP). BULK QUANTITIES ARE NOT ACCEPTABLE.
(d) The following paragraph concerns only Federal Aviation Administration (FAA) items that are shipped to a contractor for repair:
The FAA will endeavor to ship all items in reusable containers. All items shall be returned to the FAA in the same or equal (see A. above) containers. In those instances where material is shipped in specialized containers (plastic/fiberglass shipping cases, metal crates, etc.), that material will be returned in the original container. If an FAA-owned container is not reusable, the contractor shall notify the Contracting Officer, offer to furnish a new comparable container, and state its price. At its option, the FAA may accept the contractor's offer, or independently furnish a suitable shipment container.
Copies of the ASTMs can be attained from:
ASTM
100 Barr Harbor Dr.
West Conshohocken, PA 19428
(610) 832-9500
Copies of Mil STD 129 can be attained from:
DODSSP
Customer Service
Standardization Documents Order Desk
700 Robbins Avenue Building 4D
Philadelphia, PA 19111-5094
Section E - Inspection and Acceptance Clause List
3.10.4-2 INSPECTION OF SUPPLIES - FIXED PRICE (NOV 1997)
3.10.4-16 RESPONSIBILITY FOR SUPPLIES (APR 1996)
AC1908 INSPECTION AND ACCEPTANCE AT DESTINATION (JUN 2015)
(a) Final inspection and acceptance shall be at destination.
(b) Although source inspection by the Government is not anticipated under this contract, the provisions of this clause shall in no way be construed to limit the rights of the Government under the clause entitled 3.10.4-2
INSPECTION OF SUPPLIES - FIXED PRICE.
Section F - Deliveries or Performance Clause List
3.2.2.8-3 DELIVERY OF EXCESS QUANTITIES (APR 1996)
3.10.1-9 STOP-WORK ORDER (APR 2025)
3.2.2.8-6 TIME OF DELIVERY (NOV 1997)
(a) The Government requires delivery to be made according to the following schedule:
REQUIRED DELIVERY SCHEDULE
(Contracting Officer insert specific details)
ITEM NO. QUANTITY WITHIN DAYS AFTER DATE
OF CONTRACT
00001-00004 10 200
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above, may be rejected. The Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFEROR'S PROPOSED DELIVERY SCHEDULE
ITEM NO. QUANTITY WITHIN DAYS AFTER DATE
OF CONTRACT
(b) Attention is directed to provisions of the screening information request/contract that provide that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract. The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (i) five calendar days for delivery of the award through the ordinary mails, or (ii) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term 'working day' excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer may be rejected.
(End of clause)
3.10.1-24 NOTICE OF DELAY (MAR 2009)
If the Contractor becomes unable to complete the contract work at the time(s) specified because of technical difficulties, notwithstanding the exercise of good faith and diligent efforts in the performance of the work called for hereunder, the contractor shall give the Contracting officer written notice of the anticipated delay and the reasons therefor. Such notice and reasons shall be delivered promptly after the condition creating the anticipated delay becomes known to the contractor, but in no event less than forty-five (45) days before the completion date specified in this contract, unless otherwise directed by the Contracting Officer. When notice is so required, the Contracting officer may extend the time specified in the Schedule for such period as deemed advisable.
(End of clause)
3.11-34 F.O.B. DESTINATION (APR 1999)
(a) The term "f.o.b. destination," as used in this clause, means--
(1) Free of expense to the Government, on board the carrier's conveyance, at a specified delivery point where the consignee's facility (plant, warehouse, store, lot, or other location to which shipment can be made) is located; and
(2) Supplies shall be delivered to the destination consignee's wharf (if destination is a port city and supplies are for export), warehouse unloading platform, or receiving dock, at the expense of the Contractor. The Government shall not be liable for any delivery, storage, demurrage, accessorial, or other charges involved before the actual delivery (or "constructive placement" as defined in carrier tariffs) of the supplies to the destination, unless such charges are caused by an act or order of the Government acting in its contractual capacity. If rail carrier is used, supplies shall be delivered to the specified unloading platform of the consignee. If motor carrier (including "piggyback") is used, supplies shall be delivered to truck tailgate at the unloading platform of the consignee, except when the supplies delivered meet the requirements of Item 568 of the National Motor Freight Classification for "heavy or bulky freight." When supplies meeting the requirements of the referenced Item 568 are delivered, unloading (including movement to the tailgate) shall be performed by the consignee, with assistance from the truck driver, if requested. If the Contractor uses rail carrier or freight forwarded for less than carload shipments, the Contractor shall ensure that the carrier will furnish tailgate delivery, when required if transfer to truck is required to complete delivery to consignee.
(b) The Contractor shall--
(1) (i) Pack and mark the shipment to comply with contract specifications; or
(ii) In the absence of specifications, prepare the shipment in conformance with carrier requirements;
(2) Prepare and distribute commercial bills of lading;
(3) Deliver the shipment in good order and condition to the point of delivery specified in the contract;
(4) Be responsible for any loss of and/or damage to the goods occurring before receipt of the shipment by the consignee at the delivery point specified in the contract;
(5) Furnish a delivery schedule and designate the mode of delivering carrier; and
(6) Pay and bear all charges to the specified point of delivery.
(End of clause)
AC0168 AUTHORIZED PERFORMANCE (JUL 2015)
The execution of a contract shall not constitute authority for the contractor to commence performance. Performance shall be ordered by the issuance of a formal delivery order by an authorized Contracting Officer of the Mike Monroney Aeronautical Center. Orders issued orally or by written telecommunications shall reference a formal delivery order number and shall be confirmed by issuance of the formal delivery order.
AC1604 CONTRACT PERIOD (JUN 2015)
The effective period of this contract is one (1) year from date of award or as may be extended by options issued hereunder.
F.1 CHANGE TO INDIVIDUAL DELIVERY ORDER SCHEDULE
(a) The delivery schedule(s) of all delivery orders issued hereunder shall be established in accordance with the terms of the contract.
(b) In the event that the Contractor fails to deliver in accordance with the established delivery schedule(s) and if such failure is not due to an excusable delay as defined in the Default clause of this contract, the Government and the Contractor may at the Government's option, negotiate a revised delivery schedule(s) in exchange for adequate consideration to the Government. A contract modification will not be required, but the delivery order(s) shall be amended in writing accordingly.
(c) A delivery order change or amendment made pursuant to this clause shall not affect the delivery schedule(s) of any other delivery order(s) issued under this contract.
(d) This clause shall not limit the Government's rights under the Default clause.
F.2 DIVERSION OF SHIPMENT UNDER F.O.B. DESTINATION CONTRACTS
(a) When a place of delivery is changed in accordance with the Changes clause of this contract, the contract price shall be adjusted pursuant to that clause for any resulting increase or decrease in the cost of performance. No adjustment shall be made for changes in transportation costs when supplies are identically priced for delivery regionally or nationally and the place of delivery is changed within the area to which the identical price applies. In all other cases, price adjustments due to changes in transportation costs shall be determined by comparing the cost of--
1. Shipments to the new destinations as evidenced by copy of paid freight bills to be supplied by the Contractor with the invoice; and
2. Shipments to the original or old destination as evidenced by copy of the appropriate paid freight bills to be supplied by the Contractor, or, in the event no shipments were made, as evidenced by the applicable rates of a common or contract carrier. If carrier rates are not publicly filed with any regulatory body, (e.g., interstate shipments moving by rail piggyback service) the Contractor shall provide a copy of the contract, letter agreement or other written communication from carriers quoting the rates/changes that would have been applied for shipments to the original or old destination.
(b) If (1) shipments to the new destination are made by the Contractor's owned or leased trucks and/or (2) shipments to the original destination were made or would have been made by the Contractor's owned or leased trucks and/or
(2) shipments to the original destination were made or would have been made by the Contractor's owned or leased trucks, the Contractor shall so certify. The Government shall make an appropriate adjustment in contract prices for payment purposes by substituting a rate equal to 70 percent of the lowest applicable rate published in common carrier tariffs as of the date of shipment for the Contractor's actual rate or contemplated transportation costs.
(c) If any or all of the following data are not clearly shown on, or available from, copies of paid freight bills for each diverted shipment, the Contractor shall supply a statement showing the--
1. Full name of the carrier or carriers in the routing;
2. Number of containers;
3. Gross shipping weight;
4. Actual date of shipment; and
5. Freight description for the supplies as indicated in the "National Motor Freight Classification" or the "Uniform Freight Classification" (Rail).
(d) The contractor shall attempt to deliver finished units slated for direct ship within 60 days following completion. If after appropriate contact and/or coordination the contractor cannot deliver the unit(s) to the designated site through no fault of their own, the contractor shall deliver the unit to the prime Oklahoma City destination, FAALC. The contractor will be paid the agreed upon contractual charge for delivery to Oklahoma City.
Section G - Contract Administration Data Clause List
3.10.1-22 CONTRACTING OFFICER'S REPRESENTATIVE (APR 2012)
AC4529 WARRANTY - COMMERCIAL PRODUCTS AND SERVICES (JUN 2006)
The contractor’s standard commercial warranty shall be deemed to be a part of this contract unless otherwise specified. If the contractor does not have a standard warranty, the warranty provisions of UCC Article 2 shall apply.
AC4550 DELIVERIES TO THE MIKE MONRONEY AERONAUTICAL CENTER (MMAC) (JUL
2015)
(a) Security procedures at the MMAC require that all mail, materials, packages or parcels of any kind be delivered to a central screening point, for inspection by the FAA. This affects mail and other deliveries destined for all organizations located on MMAC property, including government organizations, contractors and permit holders.
After passing security inspection, the mail or material may be handled and delivered by the FAA. FAA will make every reasonable effort to conduct inspections and handle items in a careful manner so as to avoid damage or delay.
(b) This inspection is for the benefit of the FAA only. The FAA makes no representation that any material passing inspection is without hazard, poses no threat, or that it conforms in form, fit, function or quantity to the expectations of the intended recipient.
(c) The FAA shall not be liable for any 1) loss, damage or shortage of any mail or materials, 2) injury, or 3) delay in performance resulting from such inspection and handling, unless liable under the Federal Tort Claims Act (28 U.S.C. 2671-2680).
(d) Any item destined for the contractor that fails to pass inspection remains the property of the contractor, who is responsible for its disposition and coordination with law enforcement agencies as necessary.
Section H - Special Contract Requirements Clause List
3.1.9-1 ELECTRONIC COMMERCE AND SIGNATURE (JUL 2020)
(a) The Electronic Signatures in Global and National Commerce Act (E-SIGN) establishes a legal equivalence between:
(1) Contracts written on paper and contracts in electronic form;
(2) Pen-and-ink signatures and electronic signatures; and
(3) Other legally-required written records and the same information in electronic form.
(b) With the submission of an offer, the offeror acknowledges and accepts the utilization of electronic commerce as part of the requirements of this solicitation and the resultant contract.
(c) Certain documents may need to be provided or maintained in original form, such as large-scale drawings impractical to convert to electronic format or a document with a raised seal signifying authenticity. This clause does not change or affect any other requirements that a document must be in paper format to satisfy legal requirements such as for certain real estate transactions.
(d) The use of electronic signature technology is authorized under this solicitation and the resulting contract.
(e) Contractors must not digitally sign any documents with software that uses the Secure Hash Algorithm 1 (SHA- 1). All digitally signed documents and contracts sent to the FAA must use a SHA-256 or higher hash algorithm. This is based on the National Institute of Standards and Technology (NIST) Policy Statement on Hash Functions dated August 5, 2015. Further guidance on the use of SHA-256 is in NIST Special Publication (SP) 800-57 Part 1, section
5.6.2 as amended and SP 800-131A, Revision 1 dated November 6, 2015. Additional guidance on the use of SHA-3 is in NIST SP 800-185 as amended.
(f) Contractors do not have to update documents previously digitally signed using SHA-1 hash algorithms unless the document requires updating. The FAA and contractors may continue to use SHA-1 for the following applications:
Verifying old digital signatures and time stamps, generating and verifying hash-based message authentication codes (HMACs), key derivation functions (KDFs), and random bit/number generation.
(End of Clause)
AC3007 ECONOMIC PRICE ADJUSTMENT CONTRACT WITH OPTION TERMS (JUN 1999)
a. If the Government exercises its option to extend the contract term in accordance with clause 3.2.4-35 entitled, ‘Option to Extend the Term of the Contract’, the prices of contract line items 0002-0004 shall be subject to adjustment, at the request of either contract party, in accordance with this clause.
b. Contract price adjustment under this clause shall be limited to one occurrence per option term, and each line item price is limited to a maximum of a 10% increase, or 10% decrease, per occurrence. There is no minimum amount of adjustment that may be considered under this clause.
c. The contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.
d. Definitions, for purposes of this clause:
(1) The economic indicator shall be the Producers Price Index published on the Internet by the U.S. Department of Labor, Bureau of Labor Statistics (http://stats.bls.gov).
(2) The base price index shall be the latest published economic indicator [including data identified as ‘(P) preliminary’] as of the SIR opening date, for purposes of calculating adjustment of the option term prices.
(3) The adjusting price index shall be the latest published economic indicator [including data identified as ‘(P) preliminary] as of 120 days prior to expiration of the contract term.
(4) Contract price or contract line item price shall be the unit price reflected in Section B of the contractor's offer, incorporated into the contract at the time of award, or as later changed by formal contract modification executed by the Contracting Officer.
e. Contractor requests for adjustment under this clause must be submitted to the Contracting Officer in writing no later than 45 days after receipt of the Government's preliminary notice of intent to exercise the option to extend the contract term. The Contracting Officer may, at his/her sole discretion, receive and act upon a request submitted at any time prior to the expiration of the current contract term.
f. Adjustments under this clause shall be made only to the contract prices applicable to the option period identified in the Government's preliminary notice. In no event will the contract prices of an expired contract term be adjusted under this clause.
g. The option period contract unit price shall be adjusted by multiplying the unit price by the percentage difference between the applicable base price index and adjusting price index, subject to the limitations described in paragraph b above. If the adjusting price index is lower than the base price index, the contract unit price will be decreased by the same percentage. If the adjusting price index is higher than the base price index, the contract unit price will be increased by the same percentage.
AC4555 NOTICE OF CONTRACTOR TESTIMONY (SEP 2006)
(a) The contractor shall notify the Contracting Officer promptly in writing of its intention, or the intention of its employees, subcontractors of any tier, or subcontractor employees, either voluntarily or under compulsion of competent authority, to provide sworn testimony on any matter related to or arising under the work required by and/or performed under, this contract. Such written notification at a minimum shall consist of the date and time of the testimony, identification of the court, board, or other body before which the testimony is made, the nature of the testimony to be given to the extent it is known at the time of this report, the nature of the contractor’s involvement in the proceeding and any other circumstances related to the work performed under or related to the contract and the proceeding in which the testimony will be taken.
(b) The contractor shall include the substance of this clause, including this paragraph (b), in all subcontracts executed under this contract and shall require all subcontractors to provide the required report to the contractor.
AC4557 STRIKES OR PICKETING
Notwithstanding any other provision hereof, the Contractor is responsible for delays arising out of labor disputes, including but not limited to strikes, if such strikes are reasonably avoidable. A delay caused by a strike or by picketing which constitutes an unfair labor practice is not excusable unless the Contractor takes all reasonable and appropriate action to end such a strike or picketing, such as the filing of a charge with the National Labor Relations Board, the use of other available Government procedures, and the use of private boards or organizations for the settlement of disputes.
Section I - Contract Clauses Clause List
3.1-1 CLAUSES AND PROVISIONS INCORPORATED BY REFERENCE (JUL 2019)
This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make the full text available, or offerors and contractors may obtain the full text via Internet at:
https://fast.faa.gov/contractclauses.cfm.
(End of clause)
3.1.7-2 ORGANIZATIONAL CONFLICTS OF INTEREST (JAN 2023)
3.2.2.3-83 PROHIBITION AGAINST CONTRACTING WITH INVERTED DOMESTIC
CORPORATIONS (OCT 2015)
3.2.2.7-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (APR 2023)
3.2.2.7-8 DISCLOSURE OF TEAM ARRANGEMENTS (APR 2008)
3.2.2.8-1 MATERIAL REQUIREMENT (OCT 2019)
3.2.5-1 OFFICIALS NOT TO BENEFIT (OCT 2024)
3.2.5-3 GRATUITIES OR GIFTS (OCT 2024)
3.2.5-4 CONTINGENT FEES (OCT 2024)
3.2.5-5 ANTI-KICKBACK PROCEDURES (OCT 2024)
3.2.5-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE FAA (OCT 2024)
3.2.5-8 WHISTLEBLOWER PROTECTION FOR CONTRACTOR EMPLOYEES (APR 2024)
3.3.1-1 PAYMENTS (JUL 2018)
3.3.1-6 DISCOUNTS FOR PROMPT PAYMENT (JUL 2018)
3.3.1-8 EXTRAS (OCT 2024)
3.3.1-9 INTEREST (APR 2023)
3.3.1-10 AVAILABILITY OF FUNDS (OCT 2024)
3.3.1-15 ASSIGNMENT OF CLAIMS (JUL 2018)
3.3.1-17 PROMPT PAYMENT (OCT 2024)
3.3.1-20 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS
(OCT 2012)
3.3.1-34 PAYMENT BY ELECTRONIC FUNDS TRANSFER- SYSTEM FOR AWARD
MANAGEMENT (OCT 2024)
3.4.2-8 FEDERAL, STATE, AND LOCAL TAXES - FIXED PRICE CONTRACT (APR 2025)
3.5-1 AUTHORIZATION AND CONSENT (APR 2023)
3.5-13 RIGHTS IN DATA - GENERAL (OCT 2014)
3.6.1-3 UTILIZATION OF SMALL, SMALL DISADVANTAGED, WOMEN-OWNED, SERVICE-
DISABLED VETERAN OWNED, AND HUBZONE SMALL BUSINESS CONCERNS (APR 2025)
3.6.1-4 SMALL BUSINESS SUBCONTRACTING PLAN (APR 2025)
3.6.1-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (OCT 2022)
3.6.1-6 LIQUIDATED DAMAGES - SUBCONTRACTING PLAN (OCT 2022)
3.6.1-15 POST-AWARD SMALL BUSINESS PROGRAM RE-REPRESENTATION (JUL 2023)
3.6.2-4 WALSH-HEALEY PUBLIC CONTRACTS ACT (APR 2025)
3.6.2-12 EQUAL OPPORTUNITY FOR VETERANS (APR 2022)
3.6.2-13 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (APR 2022)
3.6.2-16 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (APR 2025)
3.6.2-39 TRAFFICKING IN PERSONS (OCT 2024)
3.6.4-5 FAA BUY AMERICAN PREFERENCE - STEEL AND MANUFACTURED GOODS (APR
2022)
3.6.4-8 BUY AMERICAN ACT AND FAA BUY AMERICAN PREFERENCE - USMCA
IMPLEMENTATION ACT - BALANCE OF PAYMENTS PROGRAM (JAN 2024)
3.6.4-10 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JAN 2010)
3.6.5-1 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN OWNED ECONOMIC
ENTERPRISES (JAN 2023)
3.6.6-1 DRUG FREE WORKPLACE (APR 2023)
3.6.6-2 SEAT BELT USE BY CONTRACTOR EMPLOYEES (APR 2023)
3.6.6-3 CONTRACTOR POLICY TO BAN TEXT MESSAGING WHILE DRIVING (JUL 2023)
3.8.9-2 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (JUL 2023)
3.9.1-1 CONTRACT DISPUTES (JAN 2020)
3.9.1-2 PROTEST AFTER AWARD (AUG 1997)
3.10.1-7 BANKRUPTCY (APR 1996)
3.10.1-12 CHANGES - FIXED-PRICE (APR 1996)
3.10.1-25 NOVATION AND CHANGE-OF-NAME AGREEMENTS (OCT 2007)
3.10.1-28 CHANGES REQUIRED BY AMS (JAN 2024)
3.10.2-6 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS
(APR 2025)
3.10.4-23 CONTRACTOR AND SUBCONTRACTOR COMPLIANCE WITH FASTENER ACT (NOV
1997)
3.10.6-1 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE) (OCT
1996)
3.10.6-4 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (JAN 2020)
3.11-62 PREFERENCE FOR PRIVATELY OWNED U.S. FLAG COMMERCIAL VESSELS (APR
2025)
3.13-14 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (APR 2025)
3.2.2.3-39 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR DATA OTHER
THAN CERTIFIED COST OR PRICING DATA - MODIFICATIONS (JAN 2022)
(a) Request for exception from certified cost or pricing data requirements.
(1) In lieu of submitting certified cost or pricing data for modifications under this contract, on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.
(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.
(ii) Information on modifications of contracts or subcontracts for commercial items.
(A) If-
(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and
(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.
(B) For a commercial item exception, the Contractor must provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Dependent upon the commercial items being catalog items, market-priced items, or items included on an active Federal Supply Service Multiple Award Schedule contract, the Contractor must include the corresponding information pursuant to that of which is described in paragraphs (a)(1)(B)(1); (a)(1)(B)(2) or (a)(1)(B)(3) of this clause:
(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.
(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.
(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.
(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor's determination of the prices to be offered in the catalog or marketplace.
(b) Requirements for certified cost or pricing data.
If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:
(1) The offeror must prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the information contained at AMS Guidance T3.2.3.G.1 "Instructions for Submitting Certified Cost/Price Proposals for Supplies, Services, or Construction," which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in AMS T3.2.3.G.1 are incorporated as a mandatory format to be used in this contract.
(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror must submit a Certificate of Current Cost or Pricing Data that conforms to the instructions contained in the Appendix G1 to AMS Guidance T3.2.3, 'Cost and Price Methodology."
(End of clause)
3.2.4-2 FIXED-PRICED CONTRACTS WITH ECONOMIC PRICE ADJUSTMENT-STANDARD
SUPPLIES (JUL 2024)
(a) The Contractor warrants that the unit price stated in the "Schedule" for ________ [offeror insert "Schedule" line item number(s)] is not in excess of the Contractor's applicable established price in effect on the contract date for like quantities of the same item. The term unit price excludes any part of the price directly resulting from requirements for preservation, packaging, or packing beyond standard commercial practice. The term established price means a price that
(1) is an established catalog or market price for a commercial item sold in substantial quantities to the general public, and
(2) is the net price after applying any standard trade discounts offered by the Contractor.
(b) The Contractor must promptly notify the Contracting Officer of the amount and effective date of each decrease in any applicable established price. Each corresponding contract unit price must be decreased by the same percentage that the established price is decreased. The decrease must apply to those items delivered on and after the effective date of the decrease in the Contractor's established price, and this contract must be modified accordingly.
The Contractor must certify:
(1) on each invoice that each unit price stated in it reflects all decreases required by this clause; or
(2) on the final invoice that all required price decreases have been applied as required by this clause.
(c) If the Contractor's applicable established price is increased after the contract date, the corresponding contract unit price must be increased, upon the Contractor's written request to the Contracting Officer, by the same percentage that the established price is increased, and the contract must be modified accordingly, subject to the following limitations:
(1) The aggregate of the increases in any contract unit price under this clause must not exceed 10 percent of the original contract unit price.
(2) The increased contract unit price must be effective:
(i) on the effective date of the increase in the applicable established price if the Contracting Officer receives the Contractor's written request within 10 days thereafter; or
(ii) if the written request is received later, on the date the Contracting Officer receives the request.
(3) The increased contract unit price must not apply to quantities scheduled under the contract for delivery before the effective date of the increased contract unit price, unless failure to deliver before that date results from causes beyond the control and without the fault or negligence of the Contractor.
(4) No modification of unit price must be executed under this paragraph (c) until the Contracting Officer verifies the increase in the applicable established price.
(5) Within 30 days after receipt of the Contractor's written request, the Contracting Officer may cancel, without liability to either party, any undelivered portion of the contract items affected by the requested increase.
(d) During the time allowed for the cancellation provided for in subparagraph (c)(5) above, and thereafter if there is no cancellation, the Contractor must continue deliveries according to the contract delivery schedule, and the Government will pay for such deliveries at the contract unit price, increased to the extent provided by paragraph (c) above.
(End of clause)
3.2.4-16 ORDERING (OCT 2024)
(a) Any supplies and services to be furnished under this contract must be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract. Such orders may be issued from the date of contract award through the effective period of the contract.
(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of a conflict between a delivery order or task order and this contract, the contract must control.
(c) If mailed, a delivery order or task order is considered "issued" when the FAA deposits the order in the mail.
Orders issued by facsimile, email or other electronic commerce methods are considered "issued" when the FAA sends the order. Orders may be issued orally only if authorized in the contract.
(End of clause)
3.2.4-17 ORDER LIMITATIONS (OCT 2019)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than one (1), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor-
(1) Any order for a single item in excess of 50 each;
(2) Any order for a combination of items in excess of 50 each; or
(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract, the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor must honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 10 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.
Upon receiving this notice, the Government may acquire the supplies or services from another source.
(End of clause)
3.2.4-20 INDEFINITE QUANTITY (OCT 2019)
(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.
(b) Delivery or performance must be made only as authorized by orders issued in accordance with the "Ordering" clause. The Contractor must furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the maximum. The Government will order at least the quantity of supplies or services designated in the Schedule as the minimum.
(c) Except for any limitations on quantities in the "Order Limitations" clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.
(d) Any order issued during the effective period of this contract and not completed within that period must be completed by the Contractor within the time specified in the order. The contract must govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor must not be required to make any deliveries under this contract after the delivery date established by order(s) placed within the ordering period.
(End of clause)
3.2.4-35 OPTION TO EXTEND THE TERM OF THE CONTRACT (JUL 2021)
(a) The Government may extend the term of this contract by written notice (contract modification) to the Contractor prior to the expiration of the current period of performance provided, that the Government will give the Contractor a preliminary written notice of its intent to extend at least 30 days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.
(b) If the Government exercises this option, the extended contract must be considered to include this option provision.
(c) The total duration of this contract, including the exercise of any options under this clause, must not exceed six
(6) (months) five (5) (years).
(End of clause)
3.2.5-7 DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL
TRANSACTIONS (OCT 2024)
(a) Definitions.
(1) "The Act," as used in this clause, means section 1352, title 31, United States Code.
(2) "Agency," as used in this clause, means executive agency, within the meaning of 5 U.S.C. 101, 102, and 104(I), and any wholly owned Government corporation within the meaning of 31 U.S.C. 9101.
(3) "Covered Federal action," as used in this clause, means any of the following Federal actions:
(i) The awarding of any Federal contract.
(ii) The making of any Federal grant.
(iii) The making of any Federal loan.
(iv) The entering into of any cooperative agreement.
(v) The extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
(4) "Indian tribe" and "tribal organization," as used in this clause, have the meaning provided in section 4 of the Indian Self-Determination and Education Assistance Act (25 U.S.C. 5304) and include Alaskan Natives.
(5) "Influencing or attempting to influence," as used in this clause, means making, with the intent to influence, any communication to or appearance before an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with any covered Federal action.
(6) "Local government," as used in this clause, means a unit of government in a State and, if chartered, established, or otherwise recognized by a State for the performance of a governmental duty, including a local public authority, a special district, an intrastate district, a council of governments, a sponsor group representative organization, and any other instrumentality of a local government.
(7) "Officer or employee of an agency," as used in this clause, includes the following individuals who are employed by an agency:
(i) An individual who is appointed to a position in the Government under title 5, United States Code, including a position under a temporary appointment.
(ii) A member of the uniformed services, as defined in subsection 101(3), title 37, United States Code.
(iii) A special Government employee, as defined in section 202, title 18, United States Code.
(iv) An individual who is a member of a Federal advisory committee, as defined by the Federal Advisory Committee Act, title 5, United States Code, appendix 2.
(8) "Person," as used in this clause, means an individual, corporation, company, association, authority, firm, partnership, society, State, and local government, regardless of whether such entity is operated for profit, or not for profit. This term excludes an Indian tribe, tribal organization, or any other Indian organization with respect to expenditures specifically permitted by other Federal law.
(9) "Reasonable compensation," as used in this clause, means, with respect to a regularly employed officer or employee of any person, compensation that is consistent with the normal compensation for such officer or employee for work that is not furnished to, not funded by, or not furnished in cooperation with the Federal Government.
(10) "Reasonable payment," as used in this clause, means, with respect to professional and other technical services, a payment in an amount that is consistent with the amount normally paid for such services in the private sector.
(11) "Recipient," as used in this clause, includes the Contractor and all subcontractors. This term excludes an Indian tribe, tribal organization, or any other Indian organization with respect to expenditures specifically permitted by other Federal law.
(12) "'Regularly employed," as used in this clause, means, with respect to an officer or employee of a person requesting or receiving a Federal contract, an officer or employee who is employed by such person for at least 130 working days within 1 year immediately preceding the date of the submission that initiates agency consideration of such person for receipt of such contract. An officer or employee who is employed by such person for less than 130 working days within 1 year immediately preceding the date of the submission that initiates agency consideration of such person must be considered to be regularly employed as soon as the officer or employee is employed by such person for 130 working days.
(13) "State," as used in this clause, means a State of the United States, the District of Columbia, the Commonwealth of Puerto Rico, a territory or possession of the United States, an agency or instrumentality of a State, and multi-State, regional, or interstate entity having governmental duties and powers.
(b) Prohibitions. The offeror, by signing its offer, hereby certifies to the best of his or her knowledge and belief that:
(1) No Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on his or her behalf in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment or modification of any Federal contract, grant, loan, or cooperative agreement;
(2) If any funds other than Federal appropriated funds (including profit or fee received under a covered Federal action) have been paid, or will be paid, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress on his or her behalf in connection with the screening information request (SIR), the offeror must complete and submit, with its offer, OMB Standard Form LLL, Disclosure of Lobbying Activities, to the Contracting Officer; and
(3) The offeror will include the language of this clause in all subcontract awards at any tier and require that all recipients of subcontract awards in excess of $150,000 must disclose accordingly.
(4) This certification and disclosure is a prerequisite for making or entering into this contract imposed by the Act. Any person who makes a prohibited expenditure or fails to file or amend a disclosure form, must be subject to a civil penalty of not less than $10,000 and not more than $100,000, for each such failure.
(c) The prohibitions of the Act do not apply under the following conditions:
(1) Agency and legislative liaison by its own employees.
(i) The prohibition on the use of appropriated funds, in subparagraph (b)(1) of this clause, does not apply in the case of a payment of reasonable compensation made to an officer or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .