This is a Statement of Work (SOW) for guy tensioning and maintenance of U.S. Forest Service communication towers in Mississippi. The SOW requires a contractor to perform comprehensive technical and infrastructure maintenance on three specific sites: Airey South Repeater, Erambert Orchard Repeater, and Wausau Repeater. Key work elements include: tensioning guy wires to specified standards, performing corrosion abatement, installing grounding systems, establishing erosion control, securing transmission lines, and creating detailed documentation.
The corresponding federal contract opportunity (Solicitation Number 6973GH-25-R-00122) is a competitive solicitation by the Federal Aviation Administration seeking a firm fixed-price contract. Proposals are due by April 29, 2025, at 4:00 PM Central Time, with site visits scheduled for April 18, 2025, at each location. The FAA intends to award the contract to the lowest-priced offeror determined to be eligible, with site visits coordinated through Brent Edgemon. Interested contractors must submit a complete solicitation response document and are advised that any exceptions to terms and conditions may render their proposal ineligible.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Guy Tensioning
For
U.S. Forest Service Guy Towers
PREPARATION DATE: 9/19/2024
AJW-L533 / United States Forest Service
1. Introduction and Overview This Statement of Work will be issued in support of the United States Forest Service (USFS) mission to sustain the health, diversity, and productivity of the nation’s forests and grasslands to meet the needs of present and future generations. The initiative will focus on addressing systemic maintenance and critical infrastructure issues afflicting the USFS tower inventory and their ability to support mission critical activities. The contracting entity will serve independently to provide technical, and logistics services to support the Federal Aviation Administration (FAA) in the efforts detailed within this scope of work.
2. Scope of Work The scope of work will encompass the implementation of all remediation measures outlined in the site-specific requirements for each site listed below. Selected contractor(s) shall provide all necessary tools, equipment, material, and technical expertise to complete this effort:
a. System Types: Guyed lattice-based communication towers, guyed lattice-based fire watch/lookout towers, guyed lattice-based research towers.
b. Minor Repair: Deficiencies identified below in the site-specific requirements are to be remediated.
c. Grounding: A waterfall ground lead shall be installed on each guy wire near ground level. Each anchor shaft or fan plate shall also be bonded. The grounding leads shall be #2 tinned copper (stranded or solid). A new ground rod shall be installed in front of the anchor per applicable standards.
d. Facility Type:
• Sole-Use: Stand-alone tower with communications building or box that is not attached to any other facility even if on the same land unit.
e. Site Specific Requirements:
• Site - Airey South Repeater
i. Tension each guyed wire to initial tension as specified in TIA-222 Rev. H.
ii. Perform corrosion abatement and control to each guyed wire anchor.
1. Dig to block method is required to inspect guy anchor shaft for corrosion.
iii. Install safety wire at each guy anchor termination point.
iv. Clear soil and vegetation around the immediate area of the guy anchor, guy lanes and establish erosion control.
v. Install grounding at each guy anchor location as specified in TIA-222 Rev.
H.
vi. Grounding resistance should meet NFPA 780’s preferred 10 ohms of resistance with 25 ohms as the accepted minimum standard. Resistance levels more than 25 ohms will need to be approved should soil conditions limit the achievement of referenced minimum standards.
vii. Install above grade ground system on tower and new shelter to meet NFPA 780 and TIA-222 current addition.
Details and acceptations to above grade grounding installation.
1. Standard Conductor sizes: #2/0 AWG 133,100 Cir. Mils
Statement of Work Power Installation
2. Air terminal shall be installed no less than 6’ above the tallest antenna with an isolated lead rundown the tower and tied into the grounding system according NFPA 780. A rolling sphere design to support air terminal placement shall be provided and approved prior to installation.
3. Number of Down Conductors. At least two (2) down conductors shall be provided on any kind of structure, including steeples.
NFPA 780 5.4 does not apply.
4. The target for the total ground resistance of this system is 25 ohms or less.
5. Ground rods shall not be less than 5/8 in. (12.7 mm) in diameter and 10 ft (2.4 m) long.
6. Ground connections shall be exothermic welds when possible or a non-reversible ground lug connection otherwise. Notable exceptions for exothermic welding, all above grade connections, tower legs, locations in dry or arid conditions with approval.
7. Ground rods that cannot be driven straight down, due to contact with rock formations, may be driven at an oblique angle of not greater than 45 degrees from the vertical or may be buried horizontally and perpendicular to the building, in a trench at least 762 mm (30 in.) deep.
8. The interconnection of the lightning protection system grounding electrodes and other grounded media shall be in the form of a ground loop conductor.
9. Each leg of a self-supporting tower shall be bonded to the tower ground ring using grounding conductors of 35 mm2 csa (#2 AWG) or coarser, bare, solid, tinned, copper conductor. Connection method shall be manufacturer or engineer approved.
10. The tower ground bus bar shall be connected to the tower grounding electrode system with a 35 mm csa (#2 AWG) or coarser, bare, solid, tinned, copper conductor.
11. Provide As-Built drawings of ground system.
viii. Install ice bridge/ transmission pathway from tower to shelter to properly support transmission lines, in accordance with NFPA standards.
1. The Ice bridge is to be self-supporting, galvanized, not connected to the tower or building and include a 3" heavy duty 12-gauge steel perforated or solid cover.
2. Feedlines are to be supported via trapeze kits and appropriate hangers.
3. Ice Bridge shall provide protection to the cables from falling ice and provide a means to support the cables from the tower to the building, cables shall not be unsupported for more than four (4) feet.
4. Ice Bridge posts shall be installed in the following manner: at the termination points of the bridge two posts shall be installed across from each other with no more than 12” of the unsupported bridge, Statement of Work mid-span there shall be no more than four (4) feet of unsupported bridge with single posts installed in a staggered fashion.
ix. Secure waveguide/cable to tower at three (3) ft. intervals where not currently attached with appropriate hangers.
x. Perform corrosion abatement and control on all visually identifiable spots of corrosion throughout the tower and guyed system.
1. Iron, steel, or aluminum surfaces to be coated shall be clean; i.e.
devoid of grease, oil, mill scale, oxidation, loosely adherent rust, paint, etc. to SSPC (Steel Structure Painting Council).
2. Grease and Oils - Solvent clean to SSPC-SP1.
3. Rust scale or easy to remove paint - Power tool and hand tool clean to SSPC-SP3.
4. The coating shall be applied at sufficient wet film thickness to achieve a minimum dry film build of 2.5 - 3.5 mils, using manufacturer's recoat time directions.
xi. Replace corroded safety climb hardware at top and bottom of system with new nuts and bolts.
xii. Install battery terminal protectors to reduce potential arc flash.
xiii. Perform tower mapping on structure.
• Site - Erambert Orchard Repeater
i. Tension each guyed wire to initial tension as specified in TIA-222 Rev. H.
ii. Perform corrosion abatement and control to each guyed wire anchor.
1. Dig to block method is required to inspect guy anchor shaft for corrosion.
iii. Install safety wire at each guy anchor termination point.
iv. Clear soil and vegetation around the immediate area of the guy anchor, guy lanes and establish erosion control.
v. Install grounding at each guy anchor location as specified in TIA-222 Rev.
H.
vi. Grounding resistance should meet NFPA 780’s preferred 10 ohms of resistance with 25 ohms as the accepted minimum standard. Resistance levels more than 25 ohms will need to be approved should soil conditions limit the achievement of referenced minimum standards.
vii. Install above grade ground system on tower and new shelter to meet NFPA 780 and TIA-222 current addition.
Details and acceptations to above grade grounding installation.
2. Standard Conductor sizes: #2/0 AWG 133,100 Cir. Mils
3. Air terminal shall be installed no less than 6’ above the tallest antenna with an isolated lead rundown the tower and tied into the grounding system according NFPA 780. A rolling sphere design to support air terminal placement shall be provided and approved prior to installation.
4. Number of Down Conductors. At least two (2) down conductors shall be provided on any kind of structure, including steeples.
NFPA 780 5.4 does not apply.
Statement of Work
5. The target for the total ground resistance of this system is 25 ohms or less.
6. Ground rods shall not be less than 5/8 in. (12.7 mm) in diameter and 10 ft (2.4 m) long.
7. Ground connections shall be exothermic welds when possible or a non-reversible ground lug connection otherwise. Notable exceptions for exothermic welding, all above grade connections, tower legs, locations in dry or arid conditions with approval.
8. Ground rods that cannot be driven straight down, due to contact with rock formations, may be driven at an oblique angle of not greater than 45 degrees from the vertical or may be buried horizontally and perpendicular to the building, in a trench at least 762 mm (30 in.) deep.
9. The interconnection of the lightning protection system grounding electrodes and other grounded media shall be in the form of a ground loop conductor.
10. Each leg of a self-supporting tower shall be bonded to the tower ground ring using grounding conductors of 35 mm2 csa (#2 AWG) or coarser, bare, solid, tinned, copper conductor. Connection method shall be manufacturer or engineer approved.
11. The tower ground bus bar shall be connected to the tower grounding electrode system with a 35 mm csa (#2 AWG) or coarser, bare, solid, tinned, copper conductor.
12. Provide As-Built drawings of ground system.
viii. Install ice bridge/ transmission pathway from tower to shelter to properly support transmission lines, in accordance with NFPA standards.
13. The Ice bridge is to be self-supporting, galvanized, not connected to the tower or building and include a 3" heavy duty 12-gauge steel perforated or solid cover.
14. Feedlines are to be supported via trapeze kits and appropriate hangers.
15. Ice Bridge shall provide protection to the cables from falling ice and provide a means to support the cables from the tower to the building, cables shall not be unsupported for more than four (4) feet.
16. Ice Bridge posts shall be installed in the following manner: at the termination points of the bridge two (2) posts shall be installed across from each other with no more than 12” of the unsupported bridge, mid-span there shall be no more than four (4) feet of unsupported bridge with single posts installed in a staggered fashion.
ix. Secure waveguide/cable to tower at three (3) ft. intervals where not currently attached with appropriate hangers.
x. Perform corrosion abatement and control on all visually identifiable spots of corrosion throughout the tower and guyed system.
xi. Replace corroded hardware that are identified above CSF-2.
Statement of Work
17. Iron, steel, or aluminum surfaces to be coated shall be clean; i.e.
devoid of grease, oil, mill scale, oxidation, loosely adherent rust, paint, etc. to SSPC (Steel Structure Painting Council).
18. Grease and Oils - Solvent clean to SSPC-SP1.
19. Rust scale or easy to remove paint - Power tool and hand tool clean to SSPC-SP3.
20. The coating shall be applied at sufficient wet film thickness to achieve a minimum dry film build of 2.5 - 3.5 mils, using manufacturer's recoat time directions.
ii. Adjust and secure antenna on leg B at 160’ that is leaning into antenna on leg C.
iii. Replace antenna transmission line that has cracked on leg C at 120’.
iv. Install battery terminal protectors to reduce potential arc flash.
v. Perform tower mapping on structure.
• Site - Wausau Repeater
xii. Tension each guyed wire to initial tension as specified in TIA-222 Rev. H.
xiii. Perform corrosion abatement and control to each guyed wire anchor.
1. Dig to block method is required to inspect guy anchor shaft for corrosion.
xiv. Install safety wire at each guy anchor termination point.
xv. Clear soil and vegetation around the immediate area of the guy anchor, guy lanes and establish erosion control.
xvi. Install grounding at each guy anchor location as specified in TIA-222 Rev.
H.
xvii. Grounding resistance should meet NFPA 780’s preferred 10 ohms of resistance with 25 ohms as the accepted minimum standard. Resistance levels more than 25 ohms will need to be approved should soil conditions limit the achievement of referenced minimum standards.
xviii. Install above grade ground system on tower and new shelter to meet NFPA 780 and TIA-222 current addition.
Details and acceptations to above grade grounding installation.
2. Standard Conductor sizes: #2/0 AWG 133,100 Cir. Mils
3. Air terminal shall be installed no less than 6’ above the tallest antenna with an isolated lead rundown the tower and tied into the grounding system according NFPA 780. A rolling sphere design to support air terminal placement shall be provided and approved prior to installation.
4. Number of Down Conductors. At least two (2) down conductors shall be provided on any kind of structure, including steeples.
NFPA 780 5.4 does not apply.
5. The target for the total ground resistance of this system is 25 ohms or less.
6. Ground rods shall not be less than 5/8 in. (12.7 mm) in diameter and 10 ft (2.4 m) long.
7. Ground connections shall be exothermic welds when possible or a
Statement of Work non-reversible ground lug connection otherwise. Notable exceptions for exothermic welding, all above grade connections, tower legs, locations in dry or arid conditions with approval.
8. Ground rods that cannot be driven straight down, due to contact with rock formations, may be driven at an oblique angle of not greater than 45 degrees from the vertical or may be buried horizontally and perpendicular to the building, in a trench at least 762 mm (30 in.) deep.
9. The interconnection of the lightning protection system grounding electrodes and other grounded media shall be in the form of a ground loop conductor.
10. Each leg of a self-supporting tower shall be bonded to the tower ground ring using grounding conductors of 35 mm2 csa (#2 AWG) or coarser, bare, solid, tinned, copper conductor. Connection method shall be manufacturer or engineer approved.
11. The tower ground bus bar shall be connected to the tower grounding electrode system with a 35 mm csa (#2 AWG) or coarser, bare, solid, tinned, copper conductor.
12. Provide As-Built drawings of ground system.
xix. Install ice bridge/ transmission pathway from tower to shelter to properly support transmission lines, in accordance with NFPA standards.
13. The Ice bridge is to be self-supporting, galvanized, not connected to the tower or building and include a 3" heavy duty 12-gauge steel perforated or solid cover.
14. Feedlines are to be supported via trapeze kits and appropriate hangers.
15. Ice Bridge shall provide protection to the cables from falling ice and provide a means to support the cables from the tower to the building, cables shall not be unsupported for more than four (4) feet.
16. Ice Bridge posts shall be installed in the following manner: at the termination points of the bridge two posts shall be installed across from each other with no more than 12” of the unsupported bridge, mid-span there shall be no more than four (4) feet of unsupported bridge with single posts installed in a staggered fashion.
xx. Secure waveguide/cable to tower at three (3) ft. intervals where not currently attached with appropriate hangers.
xxi. Perform corrosion abatement and control on all visually identifiable spots of corrosion throughout the tower and guyed system.
17. Iron, steel, or aluminum surfaces to be coated shall be clean, i.e.
devoid of grease, oil, mill scale, oxidation, loosely adherent rust, paint, etc. to SSPC (Steel Structure Painting Council).
18. Grease and Oils - Solvent clean to SSPC-SP1.
19. Rust scale or easy to remove paint - Power tool and hand tool clean to SSPC-SP3.
20. The coating shall be applied at sufficient wet film thickness to
Statement of Work achieve a minimum dry film build of 2.5 - 3.5 mils, using manufacturer's recoat time directions.
ii. Install new section bolt with manufacturer or engineer specified hardware on leg B, eighth section.
iii. Replace corroded hardware that are identified above CSF-2.
iv. Perform tower mapping on structure.
2.1. Location of Work
a. Repair work will be conducted at USFS field sites and offices by the selected contractor(s).
b. Preparation and planning of activities can be accomplished at the contractor’s home office, and USFS field offices (field office management approval required).
Field Work Locations.
Region Forest Forest Name Site Name
Site Latitude
Site Longitude
08 07
NATIONAL
FORESTS IN
MS
Airey South 30°41'19.54"N 89°3'57.09"W
08 07
NATIONAL
FORESTS IN
MS
Erambert Orchard 31°1'49.44"N 88°59'10.29"W
08 07
NATIONAL
FORESTS IN
MS
Wausau Repeater 31°31'48.98"N 88°53'32.17"W
2.2. Schedule
The Contractor is required to submit a preliminary schedule 10 days after award for the project executed under this SOW for Government approval and submit a final schedule two (2) weeks prior to start of work. This project shall be completed within 30 days of start.
• Contract Award
• Post Award Conference
• Deployment Readiness Review
• Mobilization
• Field Work Start
• Testing
• Field Work Finish
• Clean-up, Site Restoration
Statement of Work
2.3. Site Access
a. The Contractor shall provide a schedule for staging of equipment and materials, and installation. Site access will be made available to the Contractor by the FAA and USFS. For all site visits the contractors shall provide the assigned USFS radio technician with the date, time, and meeting place for the site visit. The assigned USFS radio technician can advise the contractor what types of vehicles may be necessary for traversing the area. All questions regarding scope shall be sent to the primary and/or secondary contacts provided below. Local USFS POC’s do not have the authority to change the SOW or make decisions that incur cost.
b. The FAA Primary POC will provide a USFS POC, but should a site POC not be provided, the contractor can defer to the Primary USFS POC for a site contact to be provided.
c. When contacting any POC provided via e-mail, the contractor should include all primary and secondary contacts.
Project POC(s):
Primary FAA Name: Brent Edgemon Title: Project Manager Email: brent.edgemon@faa.gov Number: 405-834-0738
Secondary FAA Name: Bradley Vaillancourt Title: Project Manager Email: bradley.vaillancourt@faa.gov Number: 405-201-2810
Primary USFS
Name: Yana Patton Title: Communication Site Manager Email: yana.patton@usda.gov Number: 530-226-2779
Secondary USFS Name: Chris Atkinson Title: Communications Systems Civil Engineer Email:
christopher.atkinson@usda.gov Number: 307-461-1516
3. Government Furnished Equipment Security (GFES)
a. Physical Security: The contractor shall be responsible for safeguarding all government property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
b. Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons.
4. Applicable Standards
a. OSHA (1910 and 1926)
i. Contractor shall follow all applicable standards, health, and safety practices.
b. ANSI-TIA 222 Rev. H
i. 7.6.1 Initial Tension. The initial tension in guys, for design purposes, at an ambient temperature of 60o F [16o C] shall be within upper and lower limits of 15
Statement of Work
Statement of Work and 7 percent, respectively, of the manufacturer’s rated breaking strength of the strand. Values of initial tension beyond these limits may be used provided consideration is given to the sensitivity of the structure to variations in initial tension. The design ambient temperature may be adjusted based on site-specific data.
ii. 13.3.2 Guy Tensions. The maximum deviation from the design initial tension shall be ± 10% for guys up to and including 1 in. [25 mm] diameter and ± 5% for guys greater than 1 in. [25 mm] diameter, of the specified design initial tension at an anchorage, corrected for the ambient temperature.
iii. 7.4.6.1 Turnbuckies. Turnbuckles used to connect guy assemblies, shall be forged from AISI grade 1030, 1035 or 1045 steel or equivalent, and suitably heat-treated (quenched and tempered, normalized or annealed).
iv. 10.4 Electrical Resistance & 10.5 Grounding Materials 10.5 Grounding Materials
c. NFPA 780
5. Deliverables and Schedule of Delivery
a. Remediation plan shall be submitted with final schedule two weeks prior to start of work.
b. Documents shall include a report of completed on sites activities, test data for tensioning before and after tensioning aft
c. Schedule of prework and on-site activities is to be provided by the contractor and accepted by the Primary Project POC.
d. Pictures shall be taken of all below grade work before, during and after excavation.
e. Post site completion all field reporting, images, and data packages are to be delivered to the Primary Project POC within 30 days.
f. Any final delivery of project documents shall be submitted in PDF format.
6. Completion Criteria
a. All required project documents have been provided to USFS and FAA and have been formally accepted.
b. All specified requirements have completed and accepted.
STRUCTURE SUPPORT
BRANCH
FAA MMAC AML-4023
TOWER INSPECTION
REPORT
Site ID: 080702TM1011T v.13 1
Top Page Region 08 Forest 07 Site Erambert Orchard Life Safety Mission Capability Environmental Overall Tower Condition Site Coordinates Lat/Long 31°1'49.44"N, 88°59'10.29"W Inspection Team Colby Vinson & Ricardo Avalos Inspection Report Reviewed By Bradley Vaillancourt Date of Inspection 04/13/2023 Obstruction Lighting No RF readings (safe/unsafe) Safe Tower Manufacture Rohn Tower Model 45 Serial Number Unknown Associated Drawing Numbers N/A Tower Height 180’ Number of Sections 18 Elevation of Tower Slope Change N/A Tower Type/System Type: Guyed System: Government Tower Leg and Brace Dimensions Leg: 1.5” Brace: 0.438” Foundation Dimensions/Type Dimensions: 36” Type: Round Slab Tower Cross Section/Face Width Triangular Face Width: 17” Base/Section Bolt Size/Grade Base: N/A Section: 0.625” Climbing Ladder/ Stairs Dimensions Ladder width: N/A Rung to rung: N/A
Rung type: Tower Members Rung size: N/A Weather Conditions Temperature: 65.5° F RH: 65.7%
Wind speed: 3.2 mph Skies: Clear Access Road Owner: FS Road Surface:5 - HIGH DEGREE OF
USER COMFORT
Accessibility: All vehicles
Road Length: 250’ Access road starting Lat/Long: 31°1'52.23"N, 88°59'15.57"W Narrowest Width: 20’ Access Road Notes: Native grass/dirt.
Site Assessment Deficiency Report
• Green: No issues or minor issues noted due to non-compliance with a current standard.
• Yellow: Non-critical issues identified that should be corrected when possible, but is not an immediate concern.
• Red: Critical issues identified that may affect personnel safety, cause a system outage, or damage to equipment.
These issues require immediate attention or should be condemned. A Do Not Climb sign is installed if the structural integrity of the tower is compromised.
Life-Safety Compliance
PRIORITY LEVEL: 2 DEFICIENCY DESCRIPTION WITH RECOMMENDED CORRECTIVE ACTION (RCA):
-No lightning protection system (including down conductors and air terminals) has been installed on the tower.
RCA: Install an LPS to include an air terminal, down conductors, and tie into an earth electrode system in accordance with NFPA 780 Section 4.
-CSF-2 corrosion has developed on the safety climb base hardware. RCA: Replace all hardware that has progressed to CSF-2 and above.
Reference: OSHA Deficiencies (OSHA Standards), Electrical Safety Deficiencies (NEC and NFPA 780) industry best practices), and Hazardous Conditions (issues of concern, life threatening).
Mission Capability
PRIORITY LEVEL: 2 DEFICIENCY DESCRIPTION WITH RECOMMENDED CORRECTIVE ACTION (RCA):
-Recommend collecting as-build’s or performing a tower mapping to conduct a structural analysis to determine an operational wind speed. Operational wind speeds are necessary to determine proper inspection procedures and life safety checks for unmaintained structures. Based on the unrecorded maintenance history of the overall tower a structural analysis should be completed as soon as possible.
-CSF-2 corrosion has developed on hardware securing antenna mounts throughout the structure. RCA: Replace all hardware that has progressed to CSF-2 and above.
Reference: Probability of system outage due to any reason, system life in current condition, theft/tampering preventive measure adequacy, Grounding & Bonding (NFPA 780), Lightning Protection System (NFPA 780), and Utilities & Power (NEC).
Environmental
PRIORITY LEVEL: 3 DEFICIENCY DESCRIPTION WITH RECOMMENDED CORRECTIVE ACTION (RCA):
-Minor amounts of vegetation overgrowth has developed around the guy wire anchors. RCA: Remove existing vegetation and treat the area to prevent future plant growth.
Reference: Wildlife and pest control, weather conditions, flood control, and hazardous waste conditions
Overview This document provides inspection details for self-supporting and guyed towers. Two basic categories are covered in the tower inspection:
1. Structural Condition
2. Corrosion and Coating
All findings within these applicable categories are checked for standards compliance, and used to generate recommendations. If non-compliant issues are found, they are ranked according to their criticality as follows:
Priority 1: Critical issues that may affect personnel safety, cause a system outage, or damage to equipment. These issues require immediate attention
Priority 2: A non-critical issue that should be corrected when possible, but is not an immediate concern.
Priority 3: A minor issue or an item that has been noted due to non-compliance with a current standard. These items may be compliant with previous standards.
Locations of non-compliant items are listed in the data tables. A location reference map is provided in Figure 1 on the next page. A trained tower inspection team performs inspections. Each team member has the following certifications:
• Mobile Crane Operations
• Fundamentals Of Protective Coatings For Industrial Structures
• Fall Protection/High Angle Rope Rescue
• Grounding/Bonding/Shielding/Corrosion/Tower Inspections
• Guyed Tower Inspections
∗ WARNING∗
• Due to safety limitations only employees/climbers trained in Fall Protection/High Angle Rescue shall be allowed to inspect or work above ground level.
• It is imperative that communications between on-site personnel and inspection team members remain open at all times.
∗ NOTICE∗
• Safety guidelines including pre-climb equipment inspection and rescue/rappel planning will be followed at all times.
Rescue Plan Because of differences in tower systems a rescue plan including first man up contingencies for each individual inspection situation shall be discussed, agreed upon, and completely understood by each member of the inspection team at each site before any work above ground starts.
(Refer to ‘Radome Rescue Planning and Procedures’)
Controlled Decent Plan Because of differences in tower systems a rappel plan for each individual inspection situation shall be discussed, agreed upon, and completely understood by each member of the inspection team at each site. Keeping in mind that a minimum 5000-pound anchor point is mandatory for a safe rappel as outlined in Fall Protection training. (Refer to ‘Radome Rappel Planning and Procedures’)
Section 1: Inspection Data Collection Concrete PSI Test (Vertical) Concrete PSI Test (Horizontal)
Slab: 4,133 PSI Slab: N/A Leg B: N/A Leg B: N/A Leg C: N/A Leg C: N/A Leg D: N/A Leg D: N/A Leg E: N/A Leg E: N/A Leg F: N/A Leg F: N/A
Metal Thickness Average (Inches) Coating Thickness Average (Mils) Leg A: 0.128” Member A: 0.467” Leg A: 3.48 mils Member A: 5.9 mils Leg B: 0.130” Member B: 0.466” Leg B: 3.26 mils Member B: 5.3 mils Leg C: 0.134” Member C: 0.460” Leg C: 3.59 mils Member C: 5.5 mils Leg D: N/A Member D: N/A Leg D: N/A Member D: N/A Leg E: N/A Member E: N/A Leg E: N/A Member E: N/A Leg F: N/A Member F: N/A Leg F: N/A Member F: N/A
3 Point Ground Resistance Reading Soil Resistivity Reading 2.01Ω 4.89Ω
Bonded Points Inspection Ohms Bonded Points
Inspection Ohms Structure Bond A: 1.090 Ω Down Conductor A: N/A Structure Bond B: 0.147 Ω Down Conductor B: N/A Structure Bond C: 0.739 Ω Down Conductor C: N/A Structure Bond D: N/A Down Conductor D: N/A
Bonded Points Inspection Ohms
Shelter Bonds: N/A Bus Bar Bonds: Outside/Inside 0.166 Ω Fence Post Bonds: N/A Fence Corner Bonds: N/A Wireway Bonds: N/A Conduit Bonds: N/A Guy Wire Bonds: N/A Other Bonds: N/A
Guy Wire System Inspection Strand Type/Size Foot Pounds (lbfs.)
(Legs with multiple guys, measurements are entered bottom to top) Leg A: 1-7 / 3/16 & 5/16 720 lbfs – Guy 5 Leg B: 1-7 / 3/16 & 5/16 720 lbfs – Guy 5 Leg C: 1-7 / 3/16 & 5/16 680 lbfs – Guy 5 Leg D: N/A N/A
PLUMB AND TWIST INFORMATION WILL BE IN ATTACHMENT Fail
Test Data Notes -Guy Wires – Guy 1, 2, 3, & 4 are 3/16”. Guy wire 5 is 5/16” -Wasn’t able to measure guys 1, 2, 3, & 4, due to size.
-Adjust guy tensions within engineer recommended specs to bring tower back into plumb tolerances.
Transmission Lines
(Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -Tower does not have a feedline/coax ladder RCA: Install a Feedline/coax ladder for proper transmission line support.
-Antenna on leg B at 160’ is leaning into antenna on leg C.
RCA: Bring crane or gin pole in to fix antennas.
-Antenna on leg C at 120’ has transmission lines cracking.
RCA: Replace transmission lines.
Coax and/or Waveguide condition ☐ 3
Connector weatherproofing ☒
Transmission line supports ☐ 3
Lights and Sensors
(Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority N/A Obstruction Light Bulbs and lenses - condition ☐ N/A
Obstruction Light Control Box ☐ N/A
Obstruction Light Photo Cell ☐ N/A
Wiring condition ☐ N/A
Section 3: Foundation Condition Ground Condition
(Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -Minor amounts of vegetation overgrowth has developed around the guy wire anchors. RCA: Remove existing vegetation and treat the area to prevent future plant growth.
Settlement, movement, or earth cracks around foundations
Erosion around foundations ☒
Other foundation concerns (standing water, drainage, vegetation, etc.)
☐ 3
Concrete Condition
(Visual Inspection and Digishmidt Test, see test section 1)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority N/A
Foundation grout condition ☒
Cracking, spalling, splitting, chipping ☒
Low spots - collecting moisture ☒
Section 4: Corrosion, Wood Rot, and Coating Main Tower and Facilities Wooden and Steel
(Visual Inspection, Elcometer thickness and coating reading from Section 1) Ref TI-222-H
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority
N/A
Legs, braces, and other structural members ☒
Climbing facilities – stairways, ladders, guardrails, etc.
Electrical through ways- conduits, j-boxes, light fixtures ☐ N/A
Grating/wood planks ☐ N/A Equipment Mounts ☒
Ground and Lightning Protection System
(Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -CSF-2 corrosion has developed on the outside bus bar hardware. RCA: Replace all hardware that has progressed to CSF-2 and above.Lightning Protection
System ☐ N/A
Bus Bars, including bolts, grounding lugs and crimped connections
☐ 3
Welds and other bonding connections ☐ N/A
Fasteners (nuts, bolts, clamps)
(Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -CSF-2 corrosion has developed on the safety climb base/top hardware. RCA: Replace all hardware that has progressed to CSF-2 and above.
-CSF-2 corrosion has developed on hardware securing antenna mounts throughout the structure. RCA: Replace all hardware that has progressed to CSF-2 and above.
Legs, braces, and other structural members ☒
Climbing facilities – stairways, ladders, guardrails, etc.
☐ 2
Electrical through ways- conduits, j-boxes, light fixtures ☐ N/A
Grating/wood planks ☐ N/A Equipment Mounts ☐ 2
Section 5: Overall Lightning Protection, Bonding, and Grounding Condition
Inspection Points
(Visual Inspection, 3 point ground test, megger, and milli-ohms meter) Ref:
NFPA 780
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -No lightning protection system (including down conductors and air terminals) has been installed on the tower. RCA:
Install an LPS to include an air terminal, down conductors, and tie into an earth electrode system in accordance with NFPA 780 Section 4.
-Guy wire legs A, B, and C are not bonded to an earth electrode system. RCA: Bond the guy wires to an EES in accordance with NFPA 780 Section 4.
-Tower equipment is not within a zone of protection. RCA:
Add a strike termination device (lightning protection system) within accordance with NFPA 780 Section 4 to create a zone of protection.
-No ground well has been installed for earth electrode system test readings. RCA: A ground test well should be installed in accordance with NFPA 780 Annex A.4.13.1.
Lightning Protection System (Rolling Ball, Air Terminal, Halo, and Down Conductor)
☐ 2
EES (Test Well, Conductor Size, and
Ground Rods) ☐ 3
Structure Bonds (Tower and Shelter) ☒
Equipment Bonding (Antennas/Masts, Conduit, J Boxes, Generator, LP tank, and Solar Array)
☐ 2
Fence Bonding (Fence Posts, Gates and Gate
Posts, and Security Wire)
☐ N/A
Guy Wires ☐ 2
Section 6: Tower, Foundation, and Grounding Condition Pictures Grounds Cracking transmission lines
Rusted bolts
Corroded safety climb hardware
No top cap on legs 3 Point Ground Resistance Reading
Section 7: Shelter Information Shelter Exterior Picture Shelter Interior Picture
Shelter Exterior Picture Shelter Interior Picture
STRUCTURE NAME: Erambert STRUCTURE SUPPORTS: Communication HVAC BTU: N/A Make: N/A
STRUCTURE TYPE: Concrete HVAC Model: N/A MAKE: N/A HVAC Serial: N/A MODEL: N/A EXTERIOR L x W x H: 12’x10’x9’ SERIAL: N/A INTERIOR L x W x H: 131”x109”x96” USED FLOOR SPACE(2’x2’ typical rack): 6 NUMBER OF RACKS: 6 AVAILABLE FLOOR SPACE(based on a 2’x’2 square and not entering egress areas): 2
Shelter Inspection Points
(Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -One of the fluorescent ceiling lights isn’t working. RCA:
Replace light tubes with new ones.
Exterior (Roof, Walls, Foundation, Doors, Windows)
Interior (Ceiling, Walls, Floor) ☒ N/A
Electrical (Lighting, Outlets, Load centers) ☐ 3
Fire Extinguishers ☒
Section 11: Inspection Guidance
11.1 Tower Reference
Locations referred to in the trip report are interpreted as follows:
• Leg/Face “A” will be the first leg/face clockwise from true North, each additional leg/face continuing in the clockwise direction will increase alphabetically
• Sections will be numbered starting with one at first complete section closest to ground level and increase numerically to the top of the tower
• Section panels will be numbered starting with one at the lowest point in the section, associated section number, and corresponding face letter
• Guy wires and guy pull-offs will be numbered starting with one at the lowest point increasing numerically to the top of the tower and corresponding leg letter
• Guy anchors will be denoted starting closest to the tower as 1 (inside), 2 (middle), 3 (outside) and corresponding leg letter
Figure 1
The severity of deterioration for timber is reported in terms of degrees: 1st, 2nd or 3rd. These determinations are made visually and are based on the following criteria:
• 1st degree/CSF1 distress, deterioration and degradation is minor as described below Corrosion – None Cracking – None Connection – Connection is in place and functioning as intended.
Distortion - None Settlement - None Erosion/Scour – None
• 2nd degree/CSF2 distress, deterioration and degradation is moderate as described below Corrosion - Freckled Rust. Corrosion of the steel has initiated.
Cracking – Crack has self-arrested or has been arrested with effective arrest holes, doubling plates or similar.
Connections – Loose fasteners or pack rust without distortion is present but the connection is in place and functioning as intended.
Distortion – Distortion not requiring mitigation or mitigated distortion.
Settlement – Exists within tolerable limits or arrested with no observed structural distress.
Erosion/Scour – Exists within tolerable limits or has been arrested with effective countermeasures.
• 3rd degree/CSF3 distress, deterioration and degradation is severe as described below Corrosion - Section loss is evident or pack rust is present Cracking – Identified crack that is not arrested Connections – Missing bolts, rivets or fasteners; broken welds; or pack rust with distortion Distortion – Distortion that requires mitigation that has not been addressed Settlement – Exceeds tolerable limits.
Erosion/Scour – Exceeds tolerable limits but is less than the critical limits
The importance of a distress, deterioration and degradation issue will be reported according to Priority 1, 2, or 3 (the same ranking system used in Sections 1 and 2):
FAA MMAC AJW-L523
TOWER INSPECTION
REPORT
Site ID: 080705TM1009T v.15.4 1
Top Page: Site Information Region/Forest 08/07
Forest Name National Forest of Mississippi
Facility Type Work Center
Facility Use Sole Use
Site Name Wausau Repeater
Life Safety Priority 1 (a) Mission Capability Major Environmental Good
Overall Tower Condition Priority 1 (a)
Site Coordinates Lat/Long 31°31'48.98"N, 88°53'32.17"W
Access Road Starting Lat/Long 31°31'41.02"N, 88°53'29.21"W
Inspection Team Anthony Moore, Tanner Burnett
Inspection Report Reviewed By Scott Mosher
Date of Inspection 2/2/2025
Date of Last Known Inspection 11/17/2020
Obstruction Lighting No
RF readings (safe/unsafe) Safe
Tower Manufacture Rohn
Tower Model 55 Inspection Report Acceptance
Serial Number Unknown Name
Associated Drawing Numbers N/A Signature
Sign Here Tower Height 180’9”
Number of Sections 18 Elevation of Tower Slope Change N/A
Tower Status/Current Use Status Active Current Use LMR
Tower Type/System Type Guyed System Government
Tower Leg and Brace Dimensions Leg 1.5” Brace 7/16”
Tower Cross Section/Face Width Cross Section Triangular Face Width 17”
Base/Section Bolt Size/Grade Base 7/16”, Section 7/16”
Climbing Ladder/ Stairs Dimensions
Ladder Width N/A Rung to Rung N/A
Rung Type Tower Members Rung Size N/A
Weather Conditions
Temperature 59.8 °F Humidity 61.7 %
Wind Speed 2.5 mph Skies Clear
Site Information Notes Gravel roads to access road, then paved.
• Green: No issues or minor issues noted due to non-compliance with a current standard.
• Yellow: Non-critical issues identified that should be corrected, when possible, but is not an immediate concern.
• Red: Critical issues identified that may affect personnel safety, cause a system outage, or damage to equipment. These issues require immediate attention or should be condemned. A Do Not Climb sign is installed if the structural integrity of the tower is compromised.
Life-Safety Compliance
PRIORITY LEVEL: 1 (a) DEFICIENCY DESCRIPTION WITH RECOMMENDED CORRECTIVE ACTION (RCA):
-Section bolt for leg B, ninth section is missing. RCA: Reinstall new manufacturer or engineer specified hardware.
-No lightning protection system (including down conductors and air terminals) has been installed on the tower. RCA:
Install an LPS to include an air terminal, down conductors, and tie into an earth electrode system in accordance with NFPA 780 Section 4.
Reference: OSHA Deficiencies (OSHA Standards), Electrical Safety Deficiencies (NEC and NFPA 780) industry best practices), and Hazardous Conditions (issues of concern, life threatening).
Mission Capability
PRIORITY LEVEL: 2 DEFICIENCY DESCRIPTION WITH RECOMMENDED CORRECTIVE ACTION (RCA):
-The FAA tower mapping/structural analysis is adhering to the current version TIA-222 which stipulates that guyed towers are analyzed once every three years and self-supporting structures analyzed once every five years. It is recommended that subsequent inspections follow the TIA-222 standard.
-The antenna mounts are not bonded to the earth electrode system and is not within a zone of protection. RCA: Bond the antenna mounts to an EES or establish a zone of protection in accordance with NFPA 780 Section 4.
-Guy wire legs A, B, and C are not bonded to an earth electrode system. RCA: Bond the guy wires to an EES in accordance with NFPA 780 Section 4.
Reference: Probability of system outage due to any reason, system life in current condition, theft/tampering preventive measure adequacy, Grounding & Bonding (NFPA 780), Lightning Protection System (NFPA 780), and Utilities & Power
(NEC).
Environmental
PRIORITY LEVEL: 3 DEFICIENCY DESCRIPTION WITH RECOMMENDED CORRECTIVE ACTION (RCA):
N/A
Reference: Wildlife and pest control, weather conditions, flood control, and hazardous waste conditions.
Overview This document provides inspection details for self-supporting and guyed towers. Two basic categories are covered in the tower inspection:
1. Structural Condition
2. Corrosion and Coating
All findings within these applicable categories are checked for standards compliance and used to generate recommendations. If non-compliant issues are found, they are ranked according to their criticality as follows:
Priority 1(a): Critical issues that identify the asset as being structurally unsound and posing an immediate personnel safety risk, to include causing a system outage or damage equipment. The findings recommend immediate closure of the asset.
Priority 1(b): Critical issues found that may affect personnel health and safety, cause a system outage, or damage equipment. The asset is structurally sound but accessible only under specific conditions and circumstances.
Major: A non-critical issue that should be corrected, when possible, but is not an immediate concern.
Minor: A minor issue or an item that has been noted due to non-compliance with a current standard. These items may be compliant with previous standards.
Locations of non-compliant items are listed in the data tables. A location reference map is provided in Figure 1 on the next page. A trained tower inspection team performs inspections. Each team member has the following certifications:
• Mobile Crane Operations
• Fundamentals Of Protective Coatings for Industrial Structures
• Fall Protection/High Angle Rope Rescue
• Grounding/Bonding/Shielding/Corrosion/Tower Inspections
• Guyed Tower Inspections
Common Abbreviations
• “RCA” - Recommended Corrective Actions
• “SF” - Severity Factor
• “CSF” - Corrosion Severity Factor
WARNING
• Due to safety limitations only employees/climbers trained in Fall Protection/High Angle Rescue shall be allowed to inspect or work above ground level.
• It is imperative that communications between on-site personnel and inspection team members always remain open.
NOTICE
• Safety guidelines including pre-climb equipment inspection and rescue/rappel planning will be followed at all times.
Rescue Plan Because of differences in tower systems a rescue plan including first man up contingencies for each individual inspection situation shall be discussed, agreed upon, and completely understood by each member of the inspection team at each site before any work above ground starts. (Refer to ‘Radome Rescue Planning and
Procedures’)
Controlled Decent Plan Because of differences in tower systems a rappel plan for each individual inspection situation shall be discussed, agreed upon, and completely understood by each member of the inspection team at each site.
Keeping in mind that a minimum 5000-pound anchor point is mandatory for a safe rappel as outlined in Fall Protection training. (Refer to ‘Radome Rappel Planning and Procedures’)
Concrete PSI Test (Vertical/Horizontal) Dimensions
Slab Vertical 4,350 PSI 3’ Round
Leg B N/A N/A N/A
Leg C N/A N/A N/A
Leg D N/A N/A N/A
Leg AA N/A N/A N/A
Leg BB N/A N/A N/A
Leg CC N/A N/A N/A
Leg DD N/A N/A N/A
Metal Thickness Average (Inches) Coating Thickness Average (Mils)
Leg A 0.096“ Member A 0.443“ Leg A 3.01 mils Member A 5.80 mils
Leg B 0.112“ Member B 0.443“ Leg B 3.08 mils Member B 4.99 mils
Leg C 0.104“ Member C 0.443“ Leg C 2.54 mils Member C 7.10 mils
Leg D N/A Member D N/A Leg D N/A Member D N/A
Leg AA N/A Member AA N/A Leg AA N/A Member AA N/A
Leg BB N/A Member BB N/A Leg BB N/A Member BB N/A
Leg CC N/A Member CC N/A Leg CC N/A Member CC N/A
Leg DD N/A Member DD N/A Leg DD N/A Member DD N/A
3 Point Ground Resistance Reading Soil Resistivity Reading
15.3 Ω 20.4 Ω
Bonded Points Ohms Bonded Points Ohms
Structure Bond A 0.37 Ω Down Conductor A N/A
Structure Bond B 0.66 Ω Down Conductor B N/A
Structure Bond C 0.17 Ω Down Conductor C N/A
Structure Bond D N/A Down Conductor D N/A
Bonded Points Ohms
Shelter Bonds 0.015 Ω
Bus Bar Bonds 0.25 Ω
Wireway Bonds N/A
Guy Wire Bonds N/A
Other Bonds Meter Base: 74 Ω
Guy Wire System Inspection
Strand Type
Size Foot Pounds (lbfs.)
(Legs with multiple guys, measurements are entered bottom to top)
Leg A 1-7 3/16”, ¼” & 5/16”
UNR, UNR, 680lbfs, 660lbfs, 1,060lbfs
Leg B 1-7 3/16”, ¼” & 5/16”
UNR, UNR, 600lbfs, 620lbfs, 980lbfs
Leg C 1-7 3/16”, ¼” & 5/16”
UNR, UNR, 640lbfs, 600lbfs, 1,120lbfs
Leg D N/A N/A N/A
PLUMB AND TWIST INFORMATION WILL BE IN ATTACHMENT Pass
Test Data Notes
N/A
Section 2: Tower Structure, and Safety Conditions
Tower member and hardware (Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -Section bolt for leg B, ninth section is missing. RCA: Reinstall new manufacturer or engineer specified hardware.
Damaged/Bent Members
(Legs & Braces)
Loose Members ☒
Mounted Equipment (Antennas, etc.)
Welded Connections (Cracks, etc.)
Weep Holes (Plugged/Not Plugged)
Hardware (Loose, Missing, Damaged, Abandon) ☐ 1 (a)
Guy Wire System (Visual Inspection, Tensiometer Readings Section 1) Ref. Annex J TIA
222-H
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority
N/A
Strand Condition ☒
Turnbuckles ☒
Cable Connectors ☒
Guy Tensions ☒
Guy Anchors ☒
Ladder, Platforms, and Catwalks (Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority N/A
Ladder Climbing Safety System
Bent, Damaged or Missing Members
☐ N/A
Catwalk Flooring (i.e., Grating/Wood Planks)
☐ N/A
Hinged Access ☐ N/A
Fastening Hardware (Nuts, Bolts, Screws, Rivets, etc.)
Lines (Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -Transmission lines on the tower are improperly supported. RCA: Install industry designed mounting hardware for proper transmission line support.
-Transmission lines are unsupported between the tower and the adjacent building. RCA: Install an ice bridge for proper transmission line support and protection.
Coax and/or Waveguide Condition
Connector Weatherproofing
Transmission Line Supports
☐ 3
Environmental Condition (Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority N/A
Vegetation Overgrowth (Trees, Brush, Vines etc.)
Waste, Biohazards ☒
Infestation (Wasps, Rodents etc.)
Section 4: Corrosion, Wood Rot, and Coating Condition Main Tower and
Facilities Wooden and Steel (Visual Inspection, Elcometer Thickness and Coating Readings from Section 1) Ref TI-222-H
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority
-CSF-1 corrosion has developed on the tower legs, in spots throughout.
RCA: Perform corrosion abatement, recoat the surface, and continue to monitor.
Legs, Braces, and Other Structural Members
☐ 3
Climbing Facilities Stairways, Ladders and
Safety Systems, Grating/Wood Decking
Electrical Through Ways, Conduits, etc.
☐ N/A
Equipment Mounts ☒
Fencing and Security Wire
☐ N/A
Lightning Protection System (Conductors, Bus Bars, Welds, Bonding Connectors)
Fasteners (Nuts, Bolts, Clamps) (Visual Inspection)
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority -CSF-1 corrosion has developed on climbing safety system hardware, at 180 feet. RCA: Perform corrosion abatement, recoat the surface, and continue to monitor.
Legs, Braces, and Other Structural Members
Climbing Facilities Stairways, Ladders and
Safety Systems, Grating/Wood Decking
☐ 3
Electrical Through Ways, Conduits, etc.
☐ N/A
Equipment Mounts ☒
Fencing and Security Wire
☐ N/A
Lightning Protection System (Bonding, Mounting Hardware)
Section 5: Overall Lightning Protection, Bonding, and Grounding Condition Inspection Points
(Visual Inspection, 3-point Ground Test, Megger, and
Milli-Ohms Meter) Ref
NFPA 780
Compliance Deficiencies, Recommended Correction, and Standards/Regulations
Yes Priority
-No lightning protection system (including down conductors and air terminals) has been installed on the tower. RCA: Install an LPS to include an air terminal, down conductors, and tie into an earth electrode system in accordance with NFPA 780 Section 4.
-No ground well has been installed for earth electrode system test readings. RCA: A ground test well should be installed in accordance with NFPA 780 Annex A.4.13.1.
-The antenna mounts are not bonded to the earth electrode system and is not within a zone of protection. RCA: Bond the antenna mounts to an EES or establish a zone of protection in accordance with NFPA 780 Section 4.
-Guy wire legs A, B, and C are not bonded to an earth electrode system.
RCA: Bond the guy wires to an EES in accordance with NFPA 780 Section 4.
Lightning Protection System (Rolling Ball, Air Terminal, Halo, and Down Conductor)
☐ 1 (b)
EES (Test Well, Conductor Size, and
Ground Rods) ☐ 3
Structure Bonds (Tower and Shelter)
☐ N/A
Equipment Bonding (Antennas/Masts, Conduit, J-Boxes, Generator, LP tank, and Solar Array)
☐ 2
Fence Bonding (Fence Posts, Gates and Gate
Posts, and Security Wire)
Tower Foundation
Missing Section Hardware
Visual Distortion of Tower
Do Not Climb Sign Place on Tower
Corroded Tower Member(s)
Corroded Safety System Hardware
• 2nd degree/SF-2 distress, deterioration and degradation is moderate as described below Delamination/Spall/Patched Area – Delaminated. Spall 1 in. or less deep or 6 in. or less in diameter.
Exposed Rebar – Present without section loss Surface Irregularities – Localized areas of divots, pits, honeycombing or damaged faces.
Efflorescence/Rust Staining/Discoloration/Sweating – Surface white without…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .