Questions and Answers as of 10.8.2024.pdf
PDF 161 KB Posted
- Attached to
- BVY ATCT Roof and HVAC Unit Replacement
- Solicitation number
- 6973GH-24-R-00215
About this file
This document contains Questions and Answers related to Solicitation Number 6973GH-24-R-00215 for the BVY ATCT Roof and HVAC Unit Replacement project.
The key details are:
- The solicitation is for the application of elastomeric to the roof, replacement of HVAC units, and installation of EUHs at the Beverly Air Traffic Control Tower in Beverly, MA.
- It is anticipated that a Firm Fixed-Price contract will be awarded. The NAICS code is 236220 with a $45M employee size standard.
- Offerors must be registered in the SAM database by the established offer receipt date.
- Questions must be submitted in writing by 1 week prior to the closing date. A site visit is scheduled for 26 September at 0900 EDT.
- The performance period is clarified in an amendment posted on SAM.gov.
- Offerors can submit 2-4 Organizational Experience Questionnaires as part of their proposal.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
6973GH-24-R-00215
BVY ATCT Roof and HVAC Unit Replacement
1. The two roof units for the control tower HVAC replacement are listed as one from Trane and one Carrier. Would it be possible to use the same manufacturer for both units?
On the Base building, it is important that the unit selected is compatible with the existing curb that will be re-used and that the supply and return on the unit are located in the same areas. Additionally, the unit selected should meet or exceed all other requirements stated in the mechanical schedule.
For the Cab, the unit selected should have the supply and return located in the same areas as the spec’d unit and should meet or exceed all other requirements stated in the mechanical schedule.
2. Will there be any area on site or close by for delivery and storage of HVAC equipment and contractor supplies?
Yes
3. Will a specification file be provided? All applicable files are located on SAM.gov
4. The solicitation states that the performance period is 30 days after receiving the notice to proceed, but the Statement of Work Section 8 states that the performance period is 60 days after receiving the notice to proceed. Which is correct? See Amendment Posted on SAM.gov
5. Will there be any area on site or close by for delivery and storage of HVAC equipment and contractor supplies? Yes
6. Section L.4 “Instructions for Preparation and Submission of Proposals” states in section a, the following:
(a) The Offeror must complete and submit two (2) “Organizational Experience Questionnaire” forms that include one project per form, SIR attachment J.3 Organizational Experience Questionnaire.
Is this the minimum number of questionnaires we should provide? Are we allowed to provide more than two (2), and if so, is there a maximum number we can provide? Two is the minimum. If you would like to provide more than two you can, but the limit is 4.