16 6973GH-24-R-00014-0001.pdf
PDF 138 KB Posted
- Solicitation number
- 6973GH-24-R-00014
About this file
This document is an amendment to a solicitation for geotechnical surveying services in Douglas, Arizona. The amendment updates the NAICS code from 238220 to 238990, incorporates a revised statement of work and schedule B, and includes questions and answers from potential offerors. Cone penetration testing will not require concrete or asphalt removal and replacement. Proposals are due no later than December 18, 2023 at 1600 hours. The services required include cone penetration testing and cased borehole drilling to assess soil conditions. Physical security services are optional for offerors to propose. The solicitation was issued by the Department of Transportation Federal Aviation Administration Franchise Acquisition Services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16 Attachment 1 Statement of Work Rev 1.pdf | ||
| 16 Attachment 2 Schedule B Rev 1.docx | DOCX document | |
| 16 Attachment 6 Past Experience Form.docx | DOCX document | |
| 16 Attachment 3 Contractor Release Form.doc | DOC document | |
| 16 Attachment 1 Statement of Work.pdf | ||
| 16 Attachment 2 Schedule B.docx | DOCX document | |
| 16 Attachment 5 Performance Bond.pdf | ||
| 16 6973GH-24-R-00014.pdf | ||
| 16 Attachment 7 Wage Determination.pdf | ||
| 16 Attachment 4 Payment Bond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
5. PROJECT NO. (If applicable)2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ.NO.
PAGE OF PAGES
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6)
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
Items 8 and 15, and returning is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required.)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
(x) A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO THE AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14.
E. IMPORTANT: Contractor is not, is required to sign this document and return
ORDER NO. IN ITEM 10A.
1 2
0001 11/20/2023
AAQ-721 LOGISTICS CENTER ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ0721-AFN
OKLAHOMA CITY OK 73125
AAQ-721 LOGISTICS CENTER ACQ
FAA AERONAUTICAL CENTER
PO BOX 25082
BLDG 014-AHQ, ROOM 233A
AAQ721-AFN
OKLAHOMA CITY OK 73125
x
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By ___________ 1 x x
6973GH-24-R-00014
1 copies to the issuing office.
11/20/2023
(x)
Proposals are due NLT 18 December @ 1600.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. CONTRACT AUTHORITY 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Jason M. Perry
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
LIST OF CHANGES:
The purpose of this amendment is to update clause 3.6.1-17, incorporate Statement of Work Revision 1, incorporate schedule B Revision 1, and incorporate Questions and Answers as follows;
FIRST: Clause 3.6.1-17 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE (OCT 2022) is hereby updated:
From: The North American Industry Classification System (NAICS) code for this procurement is:
238220.
The small business size standard as defined by the Small Business Administration (SBA) is the following:
For NAICS codes based on SBA's calculation of annual receipts, the annual average receipts cannot exceed $16.5M.
For NAICS codes based on the number of employees, the average number of employees over the last 24-month period cannot exceed [ ].
(End of provision)
To: The North American Industry Classification System (NAICS) code for this procurement is:
238990 – All Other Specialty Trade Contractors.
The small business size standard as defined by the Small Business Administration (SBA) is the following:
For NAICS codes based on SBA's calculation of annual receipts, the annual average receipts cannot exceed $19.0M.
For NAICS codes based on the number of employees, the average number of employees over the last 24-month period cannot exceed [ ].
(End of provision)
SECOND: Statement of Work Revision 1 (dated 12/06/2023) is hereby incorporated.
THIRD: Schedule B Revision 1 is hereby updated and incorporated.
FOURTH: Questions and Answers are hereby incorporated.
1. Advise if the area where the Cone Penetration testing will be done is in an area with concrete or asphalt and will that need to be repaired/replaced?
a. The cone penetration testing will not be done in an area with concrete or asphalt.
2. Under the options cased borehole drilling, should we include any money for concrete or asphalt remove and replace or would that be under change management if it is needed? Per the SOW it might be needed.
a. Concrete or asphalt remove and replace will not be required.
3. There is a mention of physical security as well, should this be included or will it be under change mgmt. if the government decides it is necessary?
a. Proposing physical security (security guards) is at the discretion of the offeror.
FIFTH: No other changes to this amendment.
File details come from the government source that posted it. Updated .