Attachment 01-Statement of Work Asbestos Abatement.pdf
PDF 190 KB Posted
- Attached to
- Asbestos Abatement and Remediation at Air Route Surveillance Radar (ARSR) sites throughout the United States
- Solicitation number
- 6973GH-19-R-00250
About this file
Attachment 01-Statement of Work Asbestos Abatement (pdf)
View the file
Other files
Show 40 more
Latest 50 of 95 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08/20/2019 Attachment 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION (FAA)
STATEMENT OF WORK
Air Route Surveillance Radar (ARSR) Facility
Asbestos Abatement, and Remediation
Asbestos Abatement for ARSR Sites
A. Background
1. The Federal Aviation Administration (FAA) office of National Air Space (NAS) Defense
Programs (NDP) is soliciting quotes to furnish all labor, equipment, and materials necessary to develop site specific plans, resource requirements, restoration of affected surfaces, and schedules for asbestos abatement projects at the following 39 ARSR sites:
Angel Peak, Nevada Ashton, Idaho Battle Mountain, Nevada Grand Junction, Colorado Gallup, New Mexico Fallon, Nevada Hanna City, Illinois Hutchinson, Kansas Lusk, Wyoming Omaha, Nebraska Seattle, Washington Texarkana, Arkansas Rogers, Texas Marietta, Georgia Byhalia, Mississippi Newport, Mississippi Binns Hall, Virginia Bedford, Virginia Maiden, North Carolina Lincolnton, Georgia Garden City, Kansas North Platte, Nebraska Seligman, Arizona Lynch, Kentucky Joelton, Tennessee Oskaloosa, Kansas Kirksville, Missouri Brecksville, Ohio London, Ohio Trinidad, Colorado Mesa Rica, New Mexico Rock Springs, Wyoming Arlington, Iowa Horicon, Wisconsin Cascade, Idaho Kenai, Alaska Gettysburg, South Dakota Clearfield, Pennsylvania West Mesa, New Mexico
2. The FAA will provide:
a. List of 39 Site locations with coordinates (SOW Attachment 1).
b. Asbestos survey, Floor plan, and Aerial photo for each site (SOW Attachments 2, 3 & 4).
3. The FAA will contract the services of an independent, third party Monitoring Abatement Contractor for the monitoring of the abatement under this requirement at these facilities.
4. Period of Performance: the Contractor shall began work one week after the notice to proceed has been issued. All work shall be completed no later than 3 years from contract award.
5. The COR will set the schedule of sites in coordination with the vendor.
B. Project Management –
1. The Abatement Contractor shall prepare and execute a plan to perform the following services at up to three of the ARSR facilities listed in section 1 concurrently, then progress through the remaining facilities, with the ability to maintain three projects concurrently until all facilities in section 1 are complete.
2. Site Surveys shall be performed at each of the sites listed in SOW Attachment 1 to develop a Site Implementation Plan (SIP). The Prime Contractor shall develop a schedule and list the resource’s necessary to accomplish the work. The SIP shall provide a detailed listing of all areas of Asbestos identified to perform the abatement and remediation of all affected areas.
3. The SIP shall include but is not limited to the design, schedule, abatement and remediation for each site listed in SOW Attachment 1.
4. The Prime Contractor shall review all previous asbestos reports and surveys for accuracy and ensure the SIP can be implemented.
5. The Prime Contractor shall hold a Post-Award meeting within 14 days of contract award.
6. The Contractor shall provide a Security Plan to ensure all facility assets are protected during all phases of the abatement and remediation at each site.
7. The Prime Contractor shall be responsible for implementation of the SOW to ensure all of the requirements identified in this document are completed.
8. The Prime Contractor shall provide a detailed Risk Management Plan.
9. The Prime Contractor shall follow all on-site rules as identified by the Contracting Officers
Representative (COR).
10. The Prime Contractor shall provide a Confined Space Work Plan as necessary.
11. The Prime Contractor shall submit invoices for payment within five business days upon completion of work at each site
12. The Contractor shall comply with all OSHA Requirements.
13. The Contractor shall provide all submittals 14 days prior to the start of work.
14. The Contractor shall comply with all Federal, State, and Local laws.
15. The Contractor shall provide and post warning signs as specified in 29 CFR 1910.1001, 29
CFR 1926.1101, and ANSI Z535.2, prior to project completion. The location and number of warning signs for each site shall be determined by the COR.
16. Discovery during the abatement and remediation phase. Once previously unknown suspect material are found, all work shall stop until clearance to proceed is received from the COR.
C. Plans, Programs and Documentation: The Prime Contractor shall provide as part of the SIP referenced in paragraph B.1, the following program plans that must be approved by the COR prior to commencing work:
1. Hazard Communication Program. A written hazard communication (HAZCOM) program shall be established and implemented in accordance with 29 CFR 1910.1200. Copies of Safety Data Sheets (SDS) for hazardous chemicals brought on-site by the Abatement Contractor shall be attached to the written HAZCOM Program. The HAZCOM Program shall be approved by the COR.
2. Respiratory Protection Program. The Contractor shall establish in writing, and implement a Respiratory Protection Program in accordance with 29 CFR 1926.1101, 29 CFR 1910.134, ANSI Z88.2, and, CGA G-7 and CGA G-7.1. NO. 12 if pressurized respirators are used. This shall include evidence of most recent respirator fit-tests in accordance with 29 CFR 1926.1101.
3. Safety, Health, and Accident Prevention Plan. The Contractor shall prepare a Safety, Health and Accident Prevention Plan (SHAPP) for all work performed under this contract. At a minimum, the plan shall address the following:
a. Site-specific hazards expected to be encountered during each phase of the work [confined space, electrical hazards, hazardous chemicals present or brought on-site by the Contractor, noise, heat and cold stress, power tools, fire and explosion hazards, slips, trips & falls, etc].
b. Procedures that shall be used to prevent injury/exposure of workers due to the hazards including preparation of Activity Hazard Analyses for each major phase of the work.
c. A designated on-site point of contact that shall be responsible for enforcing the plan.
4. Asbestos Abatement Plan. The Asbestos Abatement Plan is a detailed plan of the response actions to be taken and the control procedures to be used in the abatement of asbestos containing materials (ACM). The plan shall take into consideration all the individual ACM abatement work tasks. The plan shall be prepared by, signed, and dated by the Abatement Contractor. The plan shall include, but not be limited to, the following items:
a. The type of material(s) to be removed and the approximate quantity.
b. Interface of trades involved in the construction and sequencing of asbestos related work.
c. Type of wetting agent to be used.
d. Abatement Contractor’s personal air monitoring strategies.
e. A detailed description of the method to be employed to control the spread of ACM wastes and airborne fiber concentrations.
f. The specific procedures to be used for all asbestos regulated work areas and critical equipment.
g. The specific procedures to be used to establish negative air pressure in regulated containment areas.
h. Detail of the curtained doorway (Z-flap) construction
i. Viewing ports shall be provided to facilitate monitoring of the work being performed in the containment areas.
j. A description of the abatement methods and work practices to be used.
k. A list of the materials to be used and personal protective equipment to be worn by employees.
l. Heating, Ventilating and Air Conditioning (HVAC) Systems: Shut down, lock out, and isolate HVAC systems supplying exhausting, and passing through asbestos control areas.
Seal HVAC inlets and outlet within asbestos control area with 6 mil plastic sheet and tape. Tape seal seams in HVAC components passing through asbestos control area.
m. FAA Equipment: Shut down, lock out, and isolate FAA electronic systems as identified by the COR and facility representatives. Cover electronic equipment ventilation inlets and outlets within asbestos control area with 6 mil plastic sheet and tape. Tape HEPA filter material to any inlets or outlets when electronic equipment cannot be shut down due to FAA requirements. Seal seams in electrical ductwork or cable tray components passing through asbestos control area.
n. Change Room and Shower Facilities: Provide clean change rooms and shower facilities within physical boundary around asbestos control area according to 29 CFR Part 1926.1101.
o. Mechanical Ventilation System:
p. Provide ventilation system to control personnel exposure to asbestos according to 29
CFR Part 1926.1101.
q. Design, construct, install, and maintain HEPA filtered fixed local exhaust ventilation system according to 29 CFR 1926.1101, and ANSI Z9.2 when required.
r. Exhaust ventilation air to exterior wherever possible.
s. When exhaust ventilation air must be recirculated into work area, provide HEPA filter with reliable back up filter and controls to monitor asbestos concentration in return air and to bypass recirculation system automatically when system fails.
t. Personal hygiene and decontamination procedures.
u. Labeling procedures, including descriptions of warning signs and labels to be used.
v. Detailed disposal plan to include a description of the method to be used to transport waste material, the name, address, phone number, contact, EPA licenses, and certificates of insurance for the transporter.
w. Location and details of the EPA [state]-approved landfill (point of contact (POC) ,name, address, phone number, and EPA [state] license or permit).
5. Emergency Contingency Plan The Contractor shall prepare an emergency contingency plan that identifies the abatement hazards appropriate to each project, and shall also address:
a. Negative air pressure system use and failures.
b. Any major breech of containment barriers.
c. Actions to be taken after the detection of unexpected ACM.
d. Spilling of asbestos debris from bags or containers.
e. Phone numbers for the project manager, fire, police, and medical personnel.
6. Hazardous Waste Management Plan:
The Contractor shall prepare a hazardous waste management plan that complies with applicable federal, state, and local hazardous waste regulations, which include:
a. Identification of potential hazardous wastes associated with the project.
b. Estimated quantities of waste to be generated and disposed of.
c. Names and qualifications of each Contractor that will be transporting, storing, treating, and disposing of the waste, respective facility location, phone number, name and a 24-hour point of contact. The Contractor shall attach two copies of EPA, state, and local hazardous waste permit applications, permits, and EPA identification numbers.
d. Names and qualifications (experience and training) of personnel who will be working on site with hazardous waste.
e. List of waste handling equipment to be used in performing work to include cleaning, volume reduction, and transport.
f. Spill prevention, containment, clean-up, and contingency measures to be implemented upon any hazardous waste release.
g. Work plan and schedule for waste containment, removal, and disposal, to Include procedures for daily waste cleanup.
7. Waste Disposal Plan:
The Contractor shall prepare a waste disposal plan which includes the following:
a. Written confirmation that debris collected shall be treated and disposed of IAW 40 CFR Parts 261, 262, 264, 268.
b. Written confirmation that transportation of debris shall be accomplished IAW 40 CFR Part 263 and 49 CFR Parts 172, 173, 178.
c. Waste subcontractor's name, address telephone number, landfill location, copies of license, and signed agreements.
d. Landfill name, address, and telephone number. A copy of the landfill's state and locally issued license and a signed agreement that the landfill will accept the waste.
e. Delivery tickets or other certified documentation, prepared, signed, and dated by an agent of the landfill organization, certifying that a particular amount of asbestos containing material was delivered to the landfill site. This documentation is required to be provided to the COR within three days after delivery.
8. Contractor Quality Control (CQC) Plan:
The Contractor shall furnish for Government review a contractor quality control plan ten (10) days after the receipt of the project notice to proceed. The plan shall implement and address all aspects of the abatement work. The plan shall identify personnel, procedures, controls, instructions, tests, records, and forms to be used. The government will consider an interim plan during the first 60 days of operation. Abatement may begin only after acceptance of the interim or final plan. The plan shall include, as a minimum:
a. A description of the quality control organization showing lines of authority.
b. The names, qualifications (resume format) duties, responsibilities, and authorities of each person assigned in the CQC function.
c. A copy of an official letter identifying the CQC System Manager and delegation of authority to stop work when performance is not in compliance with the contract.
d. Procedures for scheduling, reviewing, certifying, and managing submittals including those of subcontractors.
e. Test functions to include control, verification, frequency, applicable specification name and reference paragraph, responsible person, and acceptance criteria.
f. Oversight methods established to monitor control preparatory, initial, and post functions such as transportation and disposal.
g. Procedures for tracking deficiencies from identification through corrective action.
h. Reports required and proposed formats.
i. Identification of related work or support which may not be a part of this project that requires separate attention.
D. Execution of individual project/subcontractor expectations:
1. Asbestos requirements.
a. Be a licensed and certified asbestos company in each State that the ARSR facilities are located.
b. Ensure that the work be performed by accredited Asbestos Workers in accordance with
Federal and State regulations governing Asbestos Abatement and disposal activities, including State permits, and prior notification requirements to perform asbestos abatement (If necessary).
c. The Contractor shall be responsible to make the proper notifications, and shall pay any all required state fees.
d. Be responsible for ensuring that their employees and all subcontractors comply with the contents of this specification and applicable regulatory requirements for the duration of the work.
e. Be limited to those areas necessary for completion of asbestos abatement work, and allowed by the FAA.
f. Cooperate with other contractors that may be present at the facility and prevent work by others from jeopardizing the asbestos work. Provide access to a third party Air Monitoring Contractor, hired and arranged for by the FAA for the phase contrast microscopy (PCM) clearance testing that will be required. This cooperation shall include allowing access to the work areas to conduct visual inspections and air monitoring, collection of samples, providing requested data related to personnel, equipment, and scheduling, and facilitating the FAA’s monitoring of the work.
g. Participate in a pre-construction meeting for each site to discuss coordination of activities, project impact, and scheduling.
h. Properly dispose of all generated Asbestos Containing Materials (ACM) waste. Specific operational procedures shall be outlined in the required Asbestos Abatement Plan.
i. The Contractor shall provide disposable protective clothing/coveralls for personnel authorized access to containment areas each day. Protective clothing supplied by the Contractor shall be identical to the clothing the Contractor provides for their own employees.
j. Contractor to furnish locks to be utilized IAW FAA Lockout/Tag-Out requirements.
E. Restoration
1. Restoration of affected surfaces
a. The Contractor shall ensure all flooring, mastic, cove base, ceiling tiles, etc. shall be replaced with an equal or higher quality material, shall match the existing materials in that location, and shall not contain asbestos.
b. The Contractor shall repaint any surfaces affected during the abatement using products free of lead and are compatible with the surface materials to be painted.
2. Replacement of Doors, Windows, etc.
a. The Contractor shall ensure doors, windows, and other type components when replaced, shall be of an equal or a higher quality item free from lead paint and/or asbestos.
3. Inspection
a. The restoration of all surfaces and materials covered by this section shall not be considered complete until inspected and approved by the COR.
b. The Contractor shall ensure all workmanship performed in this section will be compliant with the latest version of the International Existing Building Code (IEBC).
F. General Abatement requirements:
1. Activity Hazard Analysis
a. The Contractor shall prepare an Activity Hazard Analysis (AHA) prior to the beginning of each abatement project phase.
b. The Contractor shall identify an on-site team lead to provide oversight, monitor, and coordinate the activities of their employees and their own subcontractors as they execute each phase of the project.
c. The Contractor shall protect all equipment not removed from the abatement area and shall not be required to remove any asbestos under the fixed equipment racks or cabinets.
d. Contractor workers shall not open any equipment cabinets or disturb any equipment racks during the abatement activities.
2. Contractor’s Personal Protective Equipment (PPE).
a. The Contractor shall implement and enforce the OSHA PPE and Respiratory Protection
Programs.
3. Auxiliary Generator The contractor shall provide a suitable source of electrical power with the capacity to power a minimum of 50% of the negative air machines which are used during the abatement process should there be an electrical utility failure.
4. Construction Equipment The contractor shall provide all construction support equipment items to control and secure the abatement site and any remote storage areas, including, sanitary facilities, barriers, barricades, scaffolding, fences, traffic/parking signs/signals, and flag persons when required. The contractor is responsible for the erection and safe application of all equipment.
5. Post Abatement Cleanup The Contractor shall thoroughly remove all residual mastic using an appropriate detergent.
6. Daily Log The contractor shall maintain a daily log of events for review by the COR.
G. Project execution :
1. Air Monitoring The Prime Contractor shall provide Personal Air monitoring services for the abatement contractors employees when required.
H. Asbestos Regulatory Agency Reference:
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only. The current version of referenced material at the time of the bid shall be used. Where conflicts exist between documents, the most stringent requirements shall apply.
1. American National Standards Institute (ANSI).
a. ANSI Z9.2 (1979; R 1991), Fundamentals Governing the Design and Operation of Local
Exhaust Systems
b. ANSI Z87.1 (1989; Errata; Z87.1a), Occupational and Educational Eye and Face Protection
2. ANSI Z88.2 (1992), Respiratory Protection
3. American Society for Testing and Materials (ASTM).
a. ASTM C 732 (1995), Aging Effects of Artificial Weathering on Latex Sealants
b. ASTM D 522 (1993a), Mandrel Bend Test of Attached Organic Coatings
c. ASTM D 1331 (1989), Surface and Interfacial Tension of Solutions of Surface-Active Agents
d. ASTM D 2794 (1993), Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
e. ASTM D 4397 (1996), Polyethylene Sheeting for Construction, Industrial, and Agricultural Applications
f. ASTM E 84 (1996a), Surface Burning Characteristics of Building Materials
g. ASTM E 96 (1995), Water Vapor Transmission of Materials
h. ASTM E 119 (1998), Fire Tests of Building Construction and Materials
i. ASTM E 736 (1992), Cohesion/Adhesion of Sprayed Fire-Resistive Materials Applied to Structural Members
j. ASTM E 1368 (1997), Visual Inspection of Asbestos Abatement Projects
k. ASTM D 2986 (1995a), Evaluation of Air Assay Media by the Monodisperse DOP (Dioctyl Phthalate) Smoke Test
4. United States Occupational Safety and Health Administration (OSHA)
a. 29 CFR 1910, Occupational Safety and Health Standards
b. 29 CFR 1926, Safety and Health Regulations for Construction
c. 42 CFR 84, Respiratory Protective Devices
5. Compressed Gas Association (CGA).
a. CGA G-7 (1990), Compressed Air for Human Respiration
b. CGA G-7.1 (1997), Commodity Specification for Air
6. United States Environmental Protection Agency (USEPA).
a. EPA 340/1-90-018 (1990), Asbestos/NESHAP Regulated Asbestos-Containing Materials
Guidance
b. EPA 340/1-90-019 (1990), Asbestos/NESHAP Adequately Wet Guidance
c. EPA 560/5-85-024 (1985), Guidance for Controlling Asbestos-Containing Materials in Buildings
d. EPA 600/4-85-049 (1985), Measuring Airborne Asbestos Following an Abatement Action
e. 40 CFR 61, National Emission Standards for Hazardous Air Pollutants
f. 40 CFR 763, Asbestos Hazard Emergency Response Act
g. 49 CFR 171, through 180 DOT Hazardous Material Regulations Pertaining to Asbestos
7. National Fire Protection Association (NFPA).
a. NFPA 70E(2009), National Electrical Code
b. NFPA 701(1996), Methods of Fire Test for Flame-Resistant Textiles and Films
c. NFPA 101(2009), Life Safety Code Handbook
8. National Institute for Occupational Safety and Health (NIOSH).
a. NIOSH Pub No. 94-113 (1994), NIOSH Manual of Analytical Methods, 4th edition with
First Supplement
9. Underwriters Laboratories (UL).
a. UL 586 (1990), High-Efficiency Particulate Air Filter Units
10. Federal Aviation Administration (FAA).
a. 3910.5, Asbestos Control
b. 1050.20, Airway Facilities Asbestos Control
c. Regional Asbestos Control Program Supplement
d. Article 55 of the Agreement between the Professional Aviation Safety Specialists (AFL- CIO) and U.S. Department of Transportation, Federal Aviation Administration.
e. FAA OSH Order 3900.19B
I. Asbestos Definitions:
1. Asbestos Containing Material. Any material containing more than one percent Asbestos. For purposes of these specifications, ACM includes Presumed Asbestos-Containing Material (PACM) as defined by 29 CFR 1926.1101.
2. Asbestos Regulated Work Area. An area established to demarcate areas where Class I, II, and III asbestos work is conducted, and any adjoining area where debris and waste from such asbestos work accumulates; and a work area where the airborne concentration of asbestos fibers exceeds, or has a possibility to exceed, the permissible exposure limit.
3. Amended water means water to which surfactant (wetting agent) has been added to increase the ability of the liquid to penetrate ACM.
4. Certified Industrial Hygienist (CIH). An Industrial Hygienist certified in the comprehensive practice of industrial hygiene by the American Board of Industrial Hygiene.
5. Class I asbestos work means activities involving the removal of thermal system insulation (TSI) and surfacing ACM and PACM.
6. Class II Asbestos Work. Activities involving the removal of ACM that is not thermal system insulation or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, siding shingles, and construction mastic.
7. Class III asbestos work means repair and maintenance operations, where "ACM", including TSI and surfacing ACM and PACM, is likely to be disturbed.
8. Competent Person means, in addition to the definition in 29 CFR 1926.32 (f), one who is capable of identifying existing asbestos hazards in the workplace and selecting the appropriate control strategy for asbestos exposure, who has the authority to take prompt corrective measures to eliminate them, as specified in 29 CFR 1926.32(f): in addition, for Class I and Class II work who is specially trained in a training course which meets the criteria of EPA's Model Accreditation Plan (40 CFR 763) for supervisor, or its equivalent and, for Class III and Class IV work, who is trained in a manner consistent with EPA requirements for training of local education agency maintenance and custodial staff as set forth at 40 CFR 763.92 (a)(2).
9. Friable ACM. Any material containing more than one-percent asbestos, and that can be crumbled or reduced to powder by hand pressure. (May include previously non-friable material which becomes broken or damaged by mechanical force.)
10. High Efficiency Particulate Air (HEPA) filter. A filter capable of trapping and retaining at least
99.97 percent of all mono-dispersed particles of 0.3 micrometers in diameter.
11. Permissible Exposure Limit (PEL). The PEL for asbestos is 0.1 fiber per cubic centimeter of air as an eight-hour time-weighted average (TWA), with an excursion limit (EL) of 1.0 fibers per cubic centimeter over a thirty minute period.
12. Time-weighted average limit (TWA). The TWA is an 8-hour time weighted average concentration of airborne asbestos fibers (longer than 5 micrometers) per cubic centimeter of air that represents the employee's 8-hour workday as determined by the method prescribed in 29 CFR
1926.1101 Appendix A, or by an equivalent method.
| FEDERAL AVIATION ADMINISTRATION (FAA) |
| Asbestos Abatement, and Remediation |
File details come from the government source that posted it.