Attachment 42-Schedule B abatement.pdf

PDF 65 KB Posted

Attached to
Asbestos Abatement and Remediation at Air Route Surveillance Radar (ARSR) sites throughout the United States
Solicitation number
6973GH-19-R-00250
Issued by

About this file

Attachment 42-Schedule B abatement (pdf)

View the file

Other files

File Type Posted
Attachment 07-2015-5517 Rev. 9 AshtonID.pdf PDF
SIR 6973GH-19-R-00250 Asbestos Abatement.pdf PDF
SOW Attachment 4 Site Surveys 3 of 3.pdf PDF
Attachment 30-2015-4707 Rev. 11 LynchKY.pdf PDF
Attachment 27-2015-4311 Rev. 9 BedfordVA.pdf PDF
Attachment 03-2015-5593 Rev. 11 AngelPeakNV.pdf PDF
Attachment 22-2015-5237 Rev. 11 RogersTX.pdf PDF
Attachment 18-2015-4387 Rev. 11 MaidenNC.pdf PDF
Attachment 02-Experience and Past Performance Information Form.pdf PDF
Attachment 11-2015-5601 Rev. 9 BattleMountainNV.pdf PDF
Attachment 35-2015-5823 Rev. 10 NewportMS.pdf PDF
Attachment 10-2015-5535 Rev. 9 SeattleWA.pdf PDF
Attachment 19-2015-5373 Rev. 11 GettysburgSD.pdf PDF
Attachment 31-2015-4313 Rev. 11 BinnsHallVA.pdf PDF
Attachment 15-2015-5513 Rev. 9 CascadeID.pdf PDF
Attachment 26-2015-5471 Rev. 8 SeligmanAZ.pdf PDF
Attachment 40-2015-5687 Rev. 9 KenaiAK.pdf PDF
Attachment 32-2015-5345 Rev. 9 GardenCityKS.pdf PDF
Attachment 24-2015-5433 Rev. 13 TrinidadCO.pdf PDF
Attachment 38-2015-5095 Rev. 11 KirksvilleMO.pdf PDF
Attachment 04-2015-5423 Rev. 11 GrandJunctionCO.pdf PDF
Attachment 36-2015-5451 Rev. 9 MesaRicaNM.pdf PDF
Attachment 39-2015-4465 Rev. 10 LincolntonGA.pdf PDF
Attachment 33-2015-4249 Rev. 11 ClearfieldPA.pdf PDF
SOW Attachment 1 Site list and Coordinates.pdf PDF
Attachment 25-2015-4471 Rev. 13 MariettaGA.pdf PDF
Attachment 08-2015-5451 Rev. 9 GallupNM.pdf PDF
16. SIR 6973GH-19-R-00250 Amendment 0001 Asbestos Abatement.pdf PDF
SIR QUESTIONS & ANSWERS.pdf PDF
Attachment 14-2015-4729 Rev. 11 LondonOH.pdf PDF
Attachment 13-2015-5413 Rev. 9 LuskWY.pdf PDF
SOW Attachment 2 Site Surveys 1 of 3.pdf PDF
Attachment 28-2015-4987 Rev. 11 ArlingtonIA.pdf PDF
Attachment 29-2015-4727 Rev. 9 BrecksvilleOH.pdf PDF
Attachment 01-Statement of Work Asbestos Abatement.pdf PDF
Attachment 21-2015-4673 Rev. 10 ByhaliaMS.pdf PDF
Attachment 37-2015-5357 Rev. 9 NorthPlatteNE.pdf PDF
Attachment 23-2015-5339 Rev. 9 OskaloosaKS.pdf PDF
Attachment 17-2015-5145 Rev. 9 TexarkanaAR.pdf PDF
Attachment 12-2015-5597 Rev. 11 FallonNV.pdf PDF
Attachment 20-2015-5443 Rev. 8 WestMesaNM.pdf PDF
Attachment 16-2015-4927 Rev. 11 HoriconWI.pdf PDF
SOW Attachment 3 Site Surveys 2 of 3.pdf PDF
Attachment 09-2015-5753 Rev. 11 HutchinsonKS.pdf PDF
Attachment 34-2015-4647 Rev. 12 JoeltonTN.pdf PDF
Attachment 06-2015-5005 Rev. 9 OmahaNE.pdf PDF
Attachment 41-2015-5409 Rev. 9 RockSpringsWY.pdf PDF
Attachment 05-2015-5027 Rev. 9 HannaCityIL.pdf PDF
Attachment 41-2015-5409 Rev. 9 RockSpringsWY.pdf PDF
SOW Attachment 3 Site Surveys 2 of 3.pdf PDF
Show 40 more

Latest 50 of 95 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 45

PART I - SECTION B

SUPPLIES/SERVICES & PRICE/COST

ITEM NO. DESCRIPTION TOTAL AMOUNT

**FIRM FIXED PRICE FOR CLINS 0001-0039**

0001 Asbestos Abatement Angel Peak, NV $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0002 Asbestos Abatement Grand Junction, CO $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0003 Asbestos Abatement Hanna City, IL $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0004 Asbestos Abatement Omaha, NE $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0005 Asbestos Abatement Ashton, ID $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0006 Asbestos Abatement Gallup, NM $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0007 Asbestos Abatement Hutchinson, KS $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0008 Asbestos Abatement Seattle, WA $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0009 Asbestos Abatement Battle Mountain, NV $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0010 Asbestos Abatement Fallon, NV $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0011 Asbestos Abatement Lusk, WY $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0012 Asbestos Abatement London, OH $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0013 Asbestos Abatement Cascade, ID $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0014 Asbestos Abatement Horicon, WI $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0015 Asbestos Abatement Texarkana, AR $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0016 Asbestos Abatement Maiden, NC $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0017 Asbestos Abatement Gettysburg, SD $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0018 Asbestos Abatement West Mesa, NM $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0019 Asbestos Abatement Byhalia, MS $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0020 Asbestos Abatement Rogers, TX $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0021 Asbestos Abatement Oskaloosa, KS $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0022 Asbestos Abatement Trinidad, CO $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0023 Asbestos Abatement Marietta, GA $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0024 Asbestos Abatement Seligman, AZ $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0025 Asbestos Abatement Bedford, VA $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0026 Asbestos Abatement Arlington, IA $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0027 Asbestos Abatement Brecksville, OH $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0028 Asbestos Abatement Lynch, KY $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0029 Asbestos Abatement Binns Hall, VA $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0030 Asbestos Abatement Garden City, KS $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0031 Asbestos Abatement Clearfield, PA $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0032 Asbestos Abatement Joelton, TN $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0033 Asbestos Abatement Newport, MS $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0034 Asbestos Abatement Mesa Rica, NM $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0035 Asbestos Abatement North Platte, NE $

Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0036 Asbestos Abatement Kirksville, MO $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0037 Asbestos Abatement Lincolnton, GA $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0038 Asbestos Abatement Kenai, AK $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey information for individual radar sites (SOW Attachment 2-4).

Include all necessary travel for this site.

0039 Asbestos Abatement Rock Springs, WY $ Asbestos Abatement for the Air Route Surveillance Radar (ARSR) Facility. Contractor to furnish all labor, equipment, supervision and materials necessary to develop site specific plans, resource requirements, and schedules for asbestos abatement projects IAW Statement of Work (Attachment 01) and site survey

0040 Over and above to be negotiated per occurrence To Be Negotiated

0041 Travel costs for Post Award Meeting at QHO Cost Reimbursable- No Fee ARSR in Omaha, NE to be held within 14 days of contract award. Reimbursable Travel Expenses in accordance with Federal Travel Regulations and AMS Clause 3.3.2-2.

CONTRACT TOTAL $

File details come from the government source that posted it.