About this file

00187 QA's (docx)

View the file

Other files for this federal contract opportunity

Other files attached to SCREENING INFORMATION REQUEST/REQUEST FOR OFFER 1. Replace 10’x16’shelter. 2. Replace a VASI with a PAPI facility., newest first.
File Type Posted
Contractor's Release Form DOT F 4220.4.doc DOC document
Payment Bond.pdf PDF
Solicitation 6973GH-19-R-00187 final.pdf PDF
MALS Project Drawings.pdf PDF
Experience Information Form.pdf PDF
Performance Bond.pdf PDF
SIR WAGE DETERMINATION RI190001 as of 6-14-2019.pdf PDF
PAPI & MALS Technical Specifications.pdf PDF
PAPI Project Drawings.pdf PDF
PAPI Project Drawings.pdf PDF
Solicitation 6973GH-19-R-00187 final.pdf PDF
Experience Information Form.pdf PDF
PAPI & MALS Technical Specifications.pdf PDF
Contractor's Release Form DOT F 4220.4.doc DOC document
Performance Bond.pdf PDF
Payment Bond.pdf PDF
MALS Project Drawings.pdf PDF
SIR WAGE DETERMINATION RI190001 as of 6-14-2019.pdf PDF
Show all 18

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers

PAPI:

1.Are the contractors responsible for replacing the transformer located at the LWAS?
a.No

MALS Shelter:

1.Is the contractor to provide the field distribution box and terminal strip?
a.Yes
2.Contractor asked for clarification on the stone work
a.Stone is already in place around the existing shelter, we require that they add additional stone anywhere earth work has been done and 6’ away from any structure or transformer
3.Who pull existing equipment out?
a.Local FAA will shut down system and contractor shall carefully remove and return equipment to the FAA. If they FAA does not want the equipment the contractor shall properly dispose of it.