Questions & Answers

PAPI:

1.Are the contractors responsible for replacing the transformer located at the LWAS?
a.No

MALS Shelter:

1.Is the contractor to provide the field distribution box and terminal strip?
a.Yes
2.Contractor asked for clarification on the stone work
a.Stone is already in place around the existing shelter, we require that they add additional stone anywhere earth work has been done and 6’ away from any structure or transformer
3.Who pull existing equipment out?
a.Local FAA will shut down system and contractor shall carefully remove and return equipment to the FAA. If they FAA does not want the equipment the contractor shall properly dispose of it.