Construction Drawings.pdf
PDF 684 KB Posted
- Solicitation number
- 6973GH-19-R-00136
About this file
Construction Drawings (pdf)
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSPORTATION
OF
DEPARTMENT
D E P A R
TM
EN
T O
F TRANSPOR
T A T
IO
N
U N
IT
E
D STATES OF
AM
E
R
IC
A
AVIA
T
I O
N
L A
R E
D E
F
TRAT
IO
N
SI
NI
M
D A
ADMINISTRATION
AVIATION
FEDERAL
DRAWING LIST
TITLE SHEET
HVAC DEMOLITION PLAN
ABBREVIATIONS, LEGEND, AND GENERAL NOTES
HVAC SCHEDULES
HVAC SECTIONS AND DETAIL
SATA-D-ASR-D001
SATA-D-ASR-M001
SATA-D-ASR-M002
SATA-D-ASR-M003
SATA-D-ASR-M004
SATA-D-ASR-M005
SATA-D-ASR-E001
SATA-D-ASR-S001 SITE DETAILS
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
DATE
APPROVED
ASR-9
PROJECT ENGINEER MGR: ENGINEERING
TX
ATO-TECHNICAL OPERATIONS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CENTRAL SERVICE AREA
TERMINAL
SERVICES
ENGINEERING
E D
M
IS
S
U E
D
F O
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
T.S.
T.S.
SAN ANTONIO, TEXAS
SAN ANTONIO INTERNATIONAL AIRPORT
HVAC REPLACEMENT PROJECT
AIRPORT SURVEILLANCE RADAR (ASR)
09-28-2018 1506052
SATA-D-ASR-G001
SAN ANTONIO
TITLE SHEET
HVAC REPLACEMENT PROJECT
ONE LINE DIAGRAM
SATA-D-ASR-G001
INTERNATIONAL AIRPORT
NOT TO SCALE
LOCATION PLAN
LOCATION
PROJECT
W U R Z B
AC
H
P
K W
Y
B L U E
C R E S T
L N
S T
A R C R E S T
R
HVAC CONTROL PANEL AND SEQUENCE OF OPERATIONS
HVAC FLOOR PLAN
c a l e o f
B r d e r
S01
FOUNDATION PLAN
SCALE 3/16"=1 -0"
EQUIPMENT PAD 6x6-W5.5XW5.5 WWF
CRUSHED STONE
OR GRAVEL
CRUSHED
STONE
FINISHED
GRADE
C L
R
2-#4 CONT.
M
IN
8"
2"8"
FINISHED
GRADE
2" COMPACTED
CRUSHED STONE BASE
CRUSHED
STONE
6x6-W5.5XW5.5 WWF
4" THICK CONC. APRON
1’-6"
CONCRETE
MECHANICAL
EQUIPMENT PAD
66’-8"
2’-8"5’-0"
16’-8" 5’-8"
S L
O P
E
T
Y P
6" SLAB ON GRADE WITH
6x6-W5.5XW5.5 WWF
T Y
P
CONCRETE APRON
GENERAL NOTES:
VARIOUS SITES THROUGHOUT THE COUNTRY. WHEN LOCAL
CODES ARE MORE STRINGENT THAN THE FOLLOWING DESIGN
CRITERIA SITE MODIFICATION IS REQUIRED.
AFFECTING THE WORK AT THE JOB SITE.
EMBEDDED OR ATTACHED ITEMS REFER TO MECHANICAL,
ELECTRICAL, AND APPROVED SHOP DRAWINGS.
1. SUBGRADE SHALL BE COMPACTED TO 95% MAX. DENSITY WHEN
TESTED IN ACCORDANCE WITH AASHTO T180.
2. CRUSHED STONE BASE SHALL BE COMPACTED TO 95% MAX.
DENSITY WHEN TESTED IN ACCORDANCE WITH AASHTO T180
3. ALLOWABLE SOIL BEARING PRESSURE=1000PSF.
4. MODULUS OF SUBGRADE REACTION, K=50 PCI.
5. SIZE AND LOCATION OF ANCHOR BOLTS SHALL BE FIELD VERIFIED
FOR CONFORMANCE TO MANUFACTURERS RECOMMENDATIONS.
FOUNDATIONS
CONCRETE
DESIGN LOADS
LIVE LOADS
SLAB
ROOF
500PSF: 1000 LBS CONCENTRATED
20 PSF LIVE LOAD
LATERAL LOAD (SBC 1985 & E1A 1976)
WIND LOAD
SEISMIC
110 MPH
6 MIL POLYETHYLENE
VAPOR BARRIER
UNDERGROUND
CONDUIT,
ISOLATED
E/G
PAD
1. CONCRETE SHALL HAVE A MINIMUM 28 DAY CYLINDER
COMPRESSIVE STRENGTH OF 3000 PSI.
2. ALL REINFORCING STEEL SHALL BE DEFORMED BILLET STEEL BARS
TO ASTM A615 GRADE 60.
3. WELDED WIRE FABRIC SHALL CONFORM TO SPECIFICATIONS FOR
WELDED STEEL WIRE FABRIC FOR CONCRETE REINFORCEMENT
(ASTM A185).
4. MINIMUM CONCRETE PROTECTION, SPLICES AND HOOKS FOR
REINFORCING STEEL SHALL CONFORM TO ACI-318.
5. LOCATION OF ALL CONSTRUCTION JOINTS OR OTHER TYPES OF
JOINTS OTHER THAN SPECIFIED SHALL BE APPROVED BY THE
RESIDENT ENGINEER BEFORE PLACING.
6. ALL REINFORCEMENT MARKED CONTINUOUS SHALL BE PROPERLY
LAPPED AT SPLICES, CORNERS AND HOOKED AT NON-CONTINUOUS
14’-8"
16’ 1
11’
CONCRETE APRON
CONCRETE MECH.
EQUIPMENT PAD
N O
M I
N A
L A
S01
SECTION
NOT TO SCALE
A
S01
HVAC REPLACEMENT PROJECT
FOUNDATION PLAN AND DETAILS
PROJECT ENGINEER MGR ENGINEERING
SATAD-ASR-S001
INTERNATIONAL AIRPORTSAN ANTONIO TX
ZONE 0
1. NEW WORK IS CLOUDED
2. THIS STRUCTURE IS DESIGNED FOR STANDARD ADAPTION TO
3. CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS
4. FOR LOCATIONS AND DIMENSIONS OF SLEEVES, OPENINGS,
B
S01
SECTION
NOT TO SCALE
09/28/18
22’-0"
22’-0"
WATER, SEWER, GAS, ELECTRICAL, EES GROUNDING, COMMUNICATION,
7. CONTRACTOR IS RESPONSIBLE FOR HAVING ALL UTILITIES:
IN THE FIELD BY RESIDENT ENGINEER.
SLAB IS APPROXIMATE: FINAL LOCATIONS SHALL BE DETERMINED
ENDS.
DETERMINED BY THE FAA COTR.
EDGE OF THE PAD. FINAL LOCATIONS OF BOLLARDS TO BE
AROUND THE NEW EQUIPMENT BAD. A MINIMUM OF 3’ FROM THE
8. BOLLARDS SHALL BE PLACED AT A MAXIMUM DISTANCE OF 6’ APART
AND TO VERIFY WITH FAA THAT ALL FAA CABLING HAS BEEN
IDENTIFIED AND LOCATED PRIOR TO ANY WORK.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:0
:2
A
T h o m a s t j o h n
DATE
APPROVED
S A
T A
D
A S
R S
W b .d g n
D001
HVAC DEMOLITION PLAN
ACU
ACU
ACU
EUH
48X18
TEMPORARY AIR CONDITIONING UNIT SCHEDULE
MARK LOCATION SERVES TYPE
ELECTRICALCAPACITY AT 95° (MBH)
T-4
ENGINE GENERATOR ROOM
NOT IN THE SCOPE OF WORK
REMARKS
26X14
ELECTRONIC EQUIPMENT ROOM
26X14
48X12
8" FLEX
3" FLEX
TRANSMITTERTRANSMITTER
17�X24�
20�X24�
17�X24�
20�X24�
72X30 RA
QUIET ROOM
WC
THE DOOR SHALL BE REINSTALLED.
RETURN AIR PLENUM. UPON COMPLETION
FOR THE TEMPORARY SUPPLY AND
STORED. THIS OPENING SHALL BE USED
EXIST DOOR SHALL BE REMOVED AND
BE DEMOLISHED
W/T-STATS TO
CONTROL BOX
EXIST ACU-1 & ACU-2
RISER
16X72 RA
53X14
TO
53X30
TRAN.
48X18 LINED S.A.
TRAN. IN RISE TO
78X18 LINED S.A.
30X18 LINED S.A.
48X18 LINED SA (BOTTOM)
52X18 LINED RA (TOP)
30X18 LINED SA (BOTTOM)
52X18 LINED RA (TOP)
(TYP. OF 3)
46X18 LINED RA
DUCTED
HORIZONTALLY
A/C UNIT
TEMPORARY
ROOM
EQUIP
ASR-9OUTSIDEAHU-T
TOTAL SENSIBLE
SCFM MIN OA CFM
V
PH
HZ
MAX. CIRCUT BREAKER
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
NOTES:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
PROJECT ENGINEER
ATO-TECHNICAL OPERATIONS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CENTRAL SERVICE AREA
TERMINAL
SERVICES
ENGINEERING
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
M
T
M
INTERNATIONAL AIRPORTSAN ANTONIO TX
150605209-28-2018
SATA-D-ASR-D001
T.S.
HVAC DEMOLITION PLAN
18X30 RG 40X12 RG
(TYP. OF 2)
24X12 RG
(TYP. OF 3)
40X12 SD
18X16 SD
DIFFUSER
SA
EXHAUST
WC
MGR ENGINEERING
GENERAL NOTES:
25 NOMINAL TONS9,000
APPROXIMATE, CONTRACTOR TO VERIFY ACTUAL DUCT DIMENSIONS.
ALL CLOUDED ITEMS ARE TO BE DEMOLISHED. DUCTWORK DIMENSIONS ARE
2. POINT BETWEEN DEMOLITION DUCTWORK AND EXISTING DUCTWORK TO REMAIN.
PADS (TYP.)
CONCRETE
HVAC REPLACEMENT PROJECT
EQUIPMENT PADS AND CONCRETE BOLLARDS.
AND CONDENSATE DRAIN PIPING. REMOVE CONCRETE
DUCTWORK SUPPORTS INCLUDING PIERS,
DUCTWORK, BACKDRAFT DAMPERS, ALL
IN ITS ENTIRETY INCLUDING ALL EXTERIOR
REMOVE EXIST ACU-1, ACU-2, AND ACU-3
72 HOURS BEFORE ANY DEMOLITION WORK CAN START.
4. TEMPORARY UNIT MUST BE PROVEN BY RUNNING FOR A MINIMUM OF
CONDITIONING UNIT. SEE ELECTRICAL DRAWINGS.
FOR THE THERMOSTAT CONTROLLING THE TEMPORARY AIR
3. CONTRACTOR SHALL PROVIDE POWER TO AHU-T AND CONTROL WIRING
MAINTAINED FOR TEMPORARY AIR CONDITIONING UNIT.
2. CONTRACTOR SHALL ENSURE PROPER FILTERS ARE INSTALLED AND
BREAKER PROPERLY SIZED.
ELECTRICAL SERVICE FROM PANEL MDPE WITH A NEW CIRCUIT
ANY WORK. REF AHU-T SCHEDULE ON THIS SHEET. PROVIDE
DUCTWORK AND CONTROLS FOR APPROVAL PRIOR TO START OF
AND SPECIFICATIONS FOR TEMPORARY AIR CONDITIONING UNIT,
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF DUCTWORK LAYOUT
125299 217
1. SEE DRAWING M001 FOR HVAC LEGEND, ABBREVIATIONS, GENERAL NOTES.
ANY DEMOLITION WORK.
FAA THAT ALL FAA CABLING HAS BEEN IDENTIFIED AND LOCATED PRIOR TO
GAS, ELECTRICAL, EES GROUNDING, COMMUNICATION, AND TO VERIFY WITH
3. CONTRACTOR IS RESPONSIBLE FOR HAVING ALL UTILITIES: WATER, SEWER,
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:0
:5
T h o m j o h n
DATE
APPROVED
S A
T A
D
A S
R
M
W .d g n
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
TX
GB 1506052
ENGINEERING SERVICES
INFRASTRUCTURE
ASR
SAN ANTONIO
PROJECT ENGINEER MGR: ENGINEERING - FORT WORTH
SATA-D-ASR-M001
t a d a s r m .d g n
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
12x20
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552AIR VENT
UNION
PLUG VALVE
TEST PORT
CONDENSATE DRAIN
DROP IN PIPING
RISE IN PIPING
PIPE FLEXIBLE CONNECTION
HOT GAS PIPING
LIQUID PIPING
DEMOLITION WORK
RETURN/EXHAUST AIR DUCT
ELECTRIC UNIT HEATER
CD
HG
L
FLEXIBLE CONNECTION
RISE OR DROP IN DUCTWORK (SUPPLY)
SUPPLY DUCT
(UP OR DOWN)
SLOPE IN DUCTWORK ELEVATION
(RETURN / EXHAUST)
RISE OR DROP IN DUCTWORK
(OUTSIDE AIR)
RISE OR DROP IN DUCTWORK
TURNING VANES IN ELBOW
EXHAUST GRILLE
RETURN AIR REGISTER, GRILLE OR
OUTSIDE AIR GRILLE
RETURN AIR GRILLE SIDEWALL
SUPPLY AIR REGISTER SIDEWALL
M
FS
AP OR AD
VD
FIRE / SMOKE DAMPER (MOTORIZED)
FIRE DAMPER (MOTORIZED)
ACCESS PANEL OR ACCESS DOOR
MANUAL VOLUME DAMPER
MOTORIZED CONTROL DAMPER (CD)
SMOKE DETECTOR
T
DIMENSION
INDICATE NET INSIDE
IS SIDE SHOWN FIGURES
DUCT SIZE, FIRST FIGURE
ROOM DESIGNATION
WET BULBDRY BULB
NONEASR-9 EQUIPMENT ROOM NONE65° 75° 75°
NOTE: THESE DESIGN TEMPERATURES AND SET POINTS ARE ADJUSTABLE.
FLOW DIRECTIONAL ARROWS
CEILING DIFFUSER WITH AIR
AND SET POINT °F
DESIGN TEMPERATURE
WINTER INDOOR
TEMPERATURE °F
DESIGN
SUMMER INDOOR
SET POINT
CONTROL
COOLING
SET POINT
HUMIDIFICATION
SET POINT
DEHUMIDIFICATION
CLIMATIC ZONE SCHEDULE - INTERIOR DESIGN CONDITION
97°F 85°F
CLIMATIC ZONE SCHEDULE - EXTERIOR DESIGN CONDITION
PER ASHRAE 99%
WINTER DESIGN TEMP
ELEVATION
30°F
PER ASHRAE 1%
SUMMER DESIGN TEMP
DESIGN OPERATING TEMP
COOLING EQUIPMENT
76°F
ACCU
AD
AFG
ACU
BOD
BTUH
CD
CFH
CFM
CONN
COTR
DIA
DN
EA
EAT
EDH
EF
EG
EH
ESP
ETR
EUH
EXIST
F
FA
FDB
FWB
HL
HP
KW
LF
MCA
MD
NPT
NC
OBD
OA
PRV
PSIG
R
RE
RF
RG
RR
RND
SCP
SF
SG
SR
STR
T
TG
T. PRMR
TS
TYP
VD
WC
WPD
AIR COOLED CONDENSER UNIT
ACCESS DOOR
ABOVE FINISHED GRADE
AIR CONDITIONING UNIT
BOTTOM OF DUCT/DIFFUSER
BTU PER HOUR
CUBIC FEET PER HOUR
CUBIC FEET PER MINUTE
CONNECTION
CONTRACTING OFFICER TECHNICAL
REPRESENTATIVE
DIAMETER
DOWN
EXHAUST AIR
ENTERING AIR TEMPERATURE
ELECTRIC DUCT HEATER
EXHAUST FAN
ELECTRIC HEATER
EXTERNAL STATIC PRESSURE
EXISTING TO REMAIN
ELECTRIC UNIT HEATER
EXISTING
FILTER / CARBON FILTER
FRESH AIR
FAHRENHEIT DEGREES, DRY BULB
FAHRENHEIT DEGREES, WET BULB
HIGH LIMIT HUMIDIFIER SENSOR
HORSEPOWER
KILOWATT
LINEAR FEET
MINIMUM CIRCUIT AMPS
MOTORIZED DAMPER
NATIONAL PIPE THREAD
NOISE CRITERIA / NORMALLY CLOSED
NORMALLY OPEN
OPPOSED BLADE DAMPER
OUTSIDE AIR
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH GAUGE
REGISTER
RESIDENT ENGINEER
RETURN FAN
RETURN GRILLE
RETURN REGISTER
ROUND
SUPPLY AIR
SMOKE CONTROL PANEL
SUPPLY FAN
SUPPLY GRILLE
SUPPLY REGISTER
STRAINER
THERMOSTAT (T-STAT)
TRANSFER GRILLE
TRAP PRIMER
TEMPERATURE SENSOR
TYPICAL
VOLUME DAMPER
WATER COLUMN
WATER PRESSURE DROP
ACU AHU
TEMPERATURE SENSOR
FLEXIBLE DUCTWORK
ABBREVIATIONS HVAC LEGEND
GRAPHIC DESCRIPTION
CLIMATIC ZONE SCHEDULES
ABBREVIATIONS, HVAC LEGEND AND
S.A.
EXHAUST GRILLE, ENGINE GENERATOR
EMERG EMERGENCY
CB CIRCUIT BREAKER
NO.
R.A. RETURN AIR
792 FT
09/28/18
INTERNATIONAL AIRPORT
CONTROL DAMPER
OUTSIDE AIR FILTER
AIR CONDITIONING UNIT SCHEDULE
EQUIPMENT
NUMBER MANUFACTURER
HOUSING
MODEL AND TYPE LOCATION
MEDIA
MODEL AND TYPE
NUMBER AND SIZE
OF FILTERS ARRANGEMENT REMARKS
F-1 AMERICAN
3P
UNIVERSAL
GLIDE/PACK
OUTDOOR
30/30
2" REPLACEABLE
(4)
24"X24"X2"
2 HIGH X
2 WIDE
EQUIPMENT
NUMBER
MANUFACTURER MODEL AND TYPE LOCATION DISCHARGE
ACU-1
ACU-2
HORIZONTAL
(SIDE
SUPPLY &
RETURN)
OUTDOOR
SLAB
MOUNTED
OR EQUAL
PACKAGE UNIT,
COOLING ONLY
CLASS I
CFMTYPETOTALSENSIBLE
CAPACITY (BTUH) INDOOR FAN DATA
EXT.S.P.
(IN H O)2
MOTOR DATA FILTER DATA
B.H.P. RPM ELECT. TYPE NUMBER SIZE (IN.)
208V
60Hz
DISPOSABLE
FIBERGLASS
FOR RETURN
AIR ONLY
8 20 X 25 X 2
UNIT COMPRESSOR
HEAD
PRESSURE
COMPLETE
PACKAGE
5-YEAR
COMPRESSOR
WARRANTY
FOR LOW
AMBIENT
OPERATION
DOWN TO
0‘F
MANUFACTURERS INDICATED ARE FOR REFERENCE ONLY IN ORDER TO ESTABLISH REQUIRED PERFORMANCE VALUES.
OTHER ACCEPTABLE MANUFACTURERS MAY BE SUBSTITUTED AS INDICATED IN THE SPECIFICATIONS.
CONTROLS
PLATE TO READ "CHANGE INTAKE FILTERS AT 0.25" WG"
AIR FILTER
S c a l e f r d e r
MECHANICAL SCHEDULES
MGR ENGINEERING
INTERNATIONAL AIRPORTSAN ANTONIO TX
PROJECT ENGINEER
4/6/18
ASR-9
HVAC REPLACEMENT PROJECT
SATA-D-ASR-M002
CENTRIFUGAL
9000 1.4 7.5 880
1. INSTALL ENGRAVED NAMEPLATE UNDER AIR FILTER GAUGE.
299,000217,000
4. EXTERNAL STATIC PRESSURE DOES NOT INCLUDE PRESSURE DROP FOR AIR FILTERS.
1. CAPACITY BASED ON 95 F.D.B. ENTERING CONDENSER AND 80 F.D.B. 67 F.W.B. ENT. EVAPORATOR O O O
3. PROVIDE EACH UNIT WITH THE 7.5 HP STANDARD MOTOR AND WITH THE HIGH STATIC DRIVE OPTION.
CARRIER
50TC 029
2. PROVIDE EACH UNIT WITH ANTI-SHORT CYCLE 0-5 MINUTE ADJUSTABLE TIMERS FOR EACH COMPRESSOR, TIME DELAY RELAYS, HEAD PRESSURE CONTROL, PHASE LOSS PROTECTION, 120V CONVENIENCE OUTLETS AND CONDENSER HAIL GUARDS.
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:1
:1
T h o m j o h n
DATE
APPROVED
S A
T A
D
A S
R
M
W .d g n
D001
HVAC PLAN
EUH
48X18
T-4
ENGINE GENERATOR ROOM
ELECTRONIC EQUIPMENT ROOM
48X12
8" FLEX
3" FLEX
72X30 RA
QUIET ROOM
WC
THE DOOR SHALL BE REINSTALLED.
RETURN AIR PLENUM. UPON COMPLETION
FOR THE TEMPORARY SUPPLY AND
STORED. THIS OPENING SHALL BE USED
EXIST DOOR SHALL BE REMOVED AND
RISER
16X72 RA
53X14
TO
53X30
TRAN.
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
NOTES:
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
PROJECT ENGINEER
ATO-TECHNICAL OPERATIONS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CENTRAL SERVICE AREA
TERMINAL
SERVICES
ENGINEERING
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
M
T
M
INTERNATIONAL AIRPORTSAN ANTONIO TX
1506052
SATA-D-ASR-M003
T.S.
HVAC PLAN
52X28 RG
(TYP. OF 4)
40X12 SD
18X16 SD
DIFFUSER
SA
EXHAUST
WC
MGR ENGINEERING
GENERAL NOTES:
ACU
09-28-18
W/T-STATS
CONTROL BOX
NEW ACU-1 & ACU-2
72 HOURS BEFORE REMOVAL OF TEMPORARY AHU FROM SITE.
4. ACU ONE AND TWO MUST BE PROVEN BY RUNNING FOR A MINIMUM OF
UNITS. SEE ELECTRICAL DRAWINGS.
WIRING FOR THE THERMOSTATS CONTROLLING THE AIR CONDITIONING
3. CONTRACTOR SHALL PROVIDE POWER TO ACU ONE AND TWO AND CONTROL
MAINTAINED FOR AIR CONDITIONING UNITS ONE AND TWO.
2. CONTRACTOR SHALL ENSURE PROPER FILTERS ARE INSTALLED AND
FROM PANEL MDPE WITH A NEW CIRCUIT BREAKER PROPERLY SIZED.
ANY WORK. REF ACU SCHEDULE. PROVIDE ELECTRICAL SERVICE
DUCTWORK AND CONTROLS FOR APPROVAL PRIOR TO START OF
AND SPECIFICATIONS FOR AIR CONDITIONING UNITS ONE AND TWO,
1. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS OF DUCTWORK LAYOUT
48X20 RA
(TYP. 3)
VD
2000 CFM 1500 CFM 1500 CFM
1000 CFM
1000 CFM
1800 CFM
200 CFM
1. SEE DRAWING M001 FOR HVAC LEGEND, ABBREVIATIONS, GENERAL NOTES.
ACU
30X16 S.A.
LINED S.A.
48X20
30X16 TO
TRAN
(TYP 2)
LINED R.A.
48X20
24X50 TO
TRAN
(TYP 2)
LINED R.A.
48X20
30X16 TO
TRAN
ACU
DRAIN
1" COND
X
48X18 72X30
BD-1
H
04’ 4’ 8’
SCALE: 1/4" = 1’-0"
CONCRETE PAD
48X20
48X20
ETR 14X26
72X16
CONCRETE PAD
(TYPICAL)
ALL JOINTS WELDED.
ANGLE DUCT SUPPORTS.
DIPPED GALVANIZED
1 1/2"X1 1/2"X3/16" HOT
(TYPICAL)
BOLTS AND WASHERS.
W/2-1/2"X3" ANCHOR
GALVANIZED PLATE
4"X4"X1/2" HOT DIPPED
ETR 18X48 LINED
BOLLARD
EQUIPMENT ROOM
ELECTRONIC
WC
18X48 SA
16X72 RA
CONNECTION
FLEXIBLE
EXH
ETR WC
BOLLARD
4. POINT OF CONNECTION BETWEEN NEW DUCTWORK AND EXISTING DUCTWORK.
3. ALL DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS ONLY.
UNITS TO CURB AND PROPERLY ANCHOR CURBS TO THE EXISTING CONCRETE PADS.
2. SUBCONTRACTOR SHALL PROPERLY SECURED PACKAGED AIR CONDITIONING
1. SEE DRAWING M001 FOR HVAC LEGEND, ABBREVIATIONS, GENERAL NOTES.
NOTES:
W/PLEXIGLASS
ACCESS DOOR
14X14 INSULATED
(TYPICAL)
ALL JOINTS WELDED.
ANGLE DUCT SUPPORTS.
DIPPED GALVANIZED
1 1/2"X1 1/2"X3/16" HOT
(TYPICAL)
BOLTS AND WASHERS.
W/2-1/2"X3" ANCHOR
GALVANIZED PLATE
4"X4"X1/2" HOT DIPPED
W/PLEXIGLASS
ACCESS DOOR
12X14 INSULATED
SCALE: 1/4" = 1’-0"M004M003
A HVAC SECTION
M004M003
B HVAC SECTION
HVAC SECTIONS AND DETAIL
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
PROJECT ENGINEER MGR: ENGINEERING
ATO-TECHNICAL OPERATIONS
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
CENTRAL SERVICE AREA
TERMINAL
SERVICES
ENGINEERING
D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
1506052 9-28-2018
SAN ANTONIO TX INTERNATIONAL AIRPORT
T.S.
T.S.
SATA-D-ASR-M004
ROOF CURB
24" HIGH
SCALE: 1/4" = 1’-0"
48X20 20X48
48X20 20X48
48X20
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:1
:0
T h o m j o h n
DATE
APPROVED
S A
T A
D
A S
R
M
W .d g n
HVAC CONTROL PANEL
SELECTOR SWITCH
DUTY UNIT
OFF/ON/AUTO
SET AT 75°F
(GREEN)
ACU-2
(RED)
FAILURE
ACU-2
T-2
OFF/ON/AUTO
SET AT 75°F
T-1
(GREEN)
ACU-1
(RED)
FAILURE
ACU-1
ON
OFF
1 2
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
TS
1506052
SAN ANTONIO
SATA-D-ASR-M005
t a d a s r m .d g n
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
FOR OFFICIAL USE ONLY
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
AIR FLOW DIAGRAM
1. 4.
2.
3.
5.
6.
7.
8.
SHALL CONTROL THE SEQUENCE OF OPERATION.
SOFTWARE TO CONTROL ACU UNITS. NEW SOFTWARE
MANUFACTURER OF NEW ACU UNITS SHALL PROVIDE9.
ACU-1 AND ACU-2 SEQUENCE OF OPERATIONS
NOT TO SCALEM004
HVAC CONTROL PANEL ARRANGEMENT
HVAC CONTROL PANEL AND
ON ALARM/FAILURE.
UNIT SHALL SWITCH TO THE STANDBY/BACKUP UNIT
INTERIOR TEMPERATURES AND UNIT FAILURES. DUTY
SUBCONTRACTOR SHALL SIMULATE HIGH AND LOW
OF THE FILTER SWITCH.
CONTINUE TO OPERATE REGARDLESS OF THE STATUS
CLOSED FOR AT LEAST 2 MINUTES. THE SYSTEM WILL
IS OPERATING AND CLOGGED FILTER SWITCH HAS BEEN
FILTER OUTPUT IS ENERGIZED WHEN THE SUPPLY FAN
DECREASES TO APPROXIMATELY 0.4" WC. THE CLOGGED
THE PRESSURE DIFFERENTIAL ACROSS THE FILTERS
THE CONTACTS WILL AUTOMATICALLY OPEN WHEN
DIFFERENTIAL ACROSS THE FILTERS IS AT 0.5" WC.
SENT TO THE REMOTE PANEL IF THE PRESSURE
FILTERS. A DIAGNOSTIC SERVICE SIGNAL WILL BE
PRESSURE DIFFERENTIAL ACROSS THE RETURN AIR
MOUNTED CLOGGED FILTER SWITCH MONITORS THE
THE OPTIONAL CLOGGED FILTER SWITCH. THE UNIT
DIRTY FILTER ALARM: UNITS WILL BE SUPPLIED WITH
REQUIRED.
UNITS WILL SHUTDOWN AND MANUAL RESET WILL BE
DETECT SMOKE/HIGH TEMPERATURE ABOVE 135°F BOTH
SENSOR IN THE RETURN AIR DUCTWORK. IF THE SENSOR
SUPPLIED WITH OPTIONAL SMOKE DETECTOR/FIRESTAT
SMOKE DETECTION/FIRESTAT SHUTDOWN: UNITS WILL BE
SAME AS UNDER NORMAL CONDITIONS.
POWER. THE CONTROL OF THESE UNITS SHALL BE THE
EMERGENCY: BOTH ACU-1 AND ACU-2 ARE ON EMERGENCY
COOLING.
SHALL NOT OPERATE WHEN EITHER ACU-1 OR ACU-2 IS
BELOW SET POINT OF 65°F (ADJUSTABLE). UNIT HEATERS
HEATERS WILL ACTIVATE WHEN ROOM TEMPERATURES ARE
EXISTING UNIT HEATER LOCATED IN THE FACILITY. THE UNIT
HEATING: HEATING SHALL BE ACCOMPLISHED THROUGH THE
DAMPER WILL RETURN TO ITS FULLY OPEN/OPERATING POSITION.
MECHANICAL COOLING STAGE(S) WILL CYCLE OFF AND THE ECONOMIZER
EQUIPMENT ROOM TEMPERATURE REACHES THE SET POINT THE
STAGED TO SATISFY THE REQUIRED COOLING. AFTER THE ELECTRONIC
ELECTRONIC EQUIPMENT ROOM, THEN MECHANICAL COOLING WILL BE
IF THE ECONOMIZER CANNOT SATISFY THE COOLING REQUIREMENT
ECONOMIZER DAMPER WILL MODULATE TO THE FULLY OPEN POSITION.
SETTINGS AND THE THERMOSTAT IS CALLING FOR COOLING, THE
AMBIENT AIR TEMPERATURE IS BELOW THE ENTHALPY CONTROLLER
COMPRESSORS TO START MECHANICAL COOLING. IF THE OUTDOOR
TO THE MINIMUM POST ION AND THE DUTY UNIT WILL STAGE THE
IS CALLING FOR COOLING, THE ECONOMIZER DAMPER WILL ACTUATE
ABOVE THE ENTHALPY CONTROLLER SETTINGS AND THE THERMOSTAT
THE WINTER SEASON, IF THE OUTDOOR AMBIENT AIR TEMPERATURE IS
THE COMPRESSORS TO SATISFY THE SET POINT TEMPERATURE. DURING
TEMPERATURE EXCEEDING THE SET POINT, THE DUTY UNIT WILL STAGE
DUTY UNIT IS OPERATIONAL, AND THE SPACE THERMOSTAT SENSES THE
COOLING/TEMPERATURE CONTROL: DURING THE SUMMER SEASONS THE
THE SYSTEM HAS ESTABLISHED NORMAL OPERATING SETTINGS.
THE SERVICE SWITCH MUST BE PUT BACK IN THE "ON" POSITION AFTER
WILL NOT OPERATE). TO RE-ENABLE THE PANEL SWITCH-OVER CIRCUITS.
THE PANEL FAILED CIRCUITS (MEANING THE PANEL SWITCH-OVER FUNCTION
NOTE: THE SERVICE SWITCH WHEN IN THE "OFF" POSITION WILL DISABLE
STANDBY/BACKUP UNIT IS IN OPERATIONAL MODE.
THE FAILED DUTY UNIT WILL REQUIRED TO BE MANUALLY RESET WHILE
OR STOPPING OF UNITS SHALL BE SET AT 2 MINUTES (ADJUSTABLE).
OF 72° F (ADJUSTABLE). THE CYCLING TIME BETWEEN ANY STARTING
COMPRESSORS TO MAINTAIN THE INDOOR TEMPERATURE SET POINT
THIS EVENT. THE DUTY UNIT SHALL PROVIDE THE STAGING OF ITS
AN ALARM LIGHT AT THE CONTROL PANEL SHALL BE TRIGGERED IN
DEACTIVATE THE DUTY UNIT AND ACTIVATE THE STANDBY/BACKUP UNIT.
FAN MOTOR CURRENT TRANSDUCERS, THE CONTROL SYSTEM SHALL
FAILURE DUE TO DIFFERENTIAL PRESSURE SENSORS OR FIELD CALIBRATED
CALLED TO ACTIVATE AND THE DUTY UNIT EXPERIENCES FAN/AIRFLOW
THE UNIT’S FAN AIR SUPPLY. IF FOR ANY REASON THE DUTY UNIT IS
BACKDRAFT DAMPERS (NORMALLY CLOSED) SHALL OPEN BASED ON
ACTIVATE THROUGH IT’S DIGITAL THERMOSTAT, THE COUNTER BALANCE
NORMAL DUTY CYCLE: WHENEVER THE DUTY UNIT IS CALLED TO
AUTO POSITION.
SWITCH (HAND ACU-1/AUTO/HAND ACU-2) SHOULD BE PLACED IN THE
AUTOMATICALLY SWITCH TO THE STANDBY/BACKUP. THE BY-PASS
TYPE OF FAILURE TO THE DUTY UNIT THE SYSTEM SHALL
(ADJUSTABLE) TO ALLOW EQUAL RUN TIME. IN THE EVENT OF ANY
CHANGE OVER FROM DUTY TO STANDBY/BACKUP EVERY 7 DAYS
CONTROL SYSTEM WITH TWO (2) DIGITAL THERMOSTATS WITH MANUAL
SYSTEM SHALL BE A ELECTRO-MECHANICAL SOLID STATE RELAY LOGIC
ONE (1) UNIT SHALL OPERATE AT ANY GIVEN TIME. THE CONTROL
AND THE SECOND UNIT WILL SERVE AS THE STANDBY/BACKUP. ONLY
TEMPERATURE CONTROL. ONE (1) UNIT WILL SERVE AS THE DUTY UNIT
BE ACTIVE 24 HOURS, 7 DAYS A WEEK WITHOUT ANY SETBACK/SETUP
ONLY TO THE ASR ELECTRONIC EQUIPMENT ROOM. THIS SYSTEM SHALL
CONSTANT VOLUME AND FULLY REDUNDANT, PROVIDING COOLING AIR
GENERAL: THESE SINGLE PACKAGE AIR CONDITIONING UNITS SHALL BE
INTERNATIONAL AIRPORT
09/28/18
KEY NOTES
WITH FAA STD FAA-STD-019F.
FAA-C-1217G. ALL EQUIPMENT GROUNDING SHALL COMPLY
6. ALL ELECTRICAL WORK SHALL COMPLY WITH FAA STD
AHU’S AND ASR EQUIPMENT ROOM WHEREVER FEASIBLE.
5. REUSE EXISTING UNDERGROUND CONDUIT BETWEEN EXISTING
AND RETURN DUCTWORK TO EES.
DEPTH OF 24" BELOW GRADE. BOND EACH AHU AND SUPPLY
GROUND RODS AS REQUIRED, EES SHALL BE 4/0 AWG AT A
AROUND NEW AHU’s EQUIPMENT PAD. PROVIDE 3/4" X 10’
4. INSTALL NEW EARTH ELECTRODE SYSTEM PER FAA-STD-019F
MINIMUM OF TWO WEEKS NOTICE.
COORDINATE ALL SHUTDOWNS WITH FAA COTR WITH A
3. TEMPORARY AHU CAN BE FED FROM NEW JUNCTION BOX.
CONDUIT AND CABLE AS REQUIRED FOR EACH NEW AHU.
SIZED JUNCTION BOX, NEW FUSED DISCONNECT AND NEW
2. CONTRACTOR SHALL PROVIDE A NEW BREAKER, PROPERLY
FOR THE ENTIRE SATA ASR FACILITY.
FLASH STUDY AND A SHORT CIRCUIT COORDINATION STUDY
1. CONTRACTOR SHALL BE RESPONSIBLE TO PERFORM AN ARC
TEMPORARY UPS TO BE INSTALLED BY CONTRACTOR
NEW EQUIPMENT TO BE INSTALLED BY CONTRACTOR
80 KVA
MAINT. BYPASS
UPS EQUIPMENT BUILDING
[P1][P1]
[P1]
E D
M
IS
S
U
R
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
WCG
WCG 1303970
C
N S
T R
U C
T
IO
N
INSTALLATION PHASE 4 OF 6
ONE LINE DIAGRAM
UPS REPLACEMENT
INTERNATIONAL AIRPORTSAN ANTONIO
SATA-D-ASR-E003
t a d a s r e .d g n
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
FRS
175A
200A 30A 30A 30A 100A
PRIMARY SERVICE DISCONNECT
225KVA, 3 PHASE, 4 WIRE
480/277V SECONDARY
UTILITY TRANSFORMER
400A, 600V NON-FUSED DISCONNECT
SUPPRESSOR
SURGE
400A MLO 480V 3PH 3W GND BUSMDP
MDPE 600A MLO 208/120V 3PH 4W GND BUS
G
MDPC
NON
225A
NON
400A
NEMA - 3R
400A
E/G LOAD BANK DISCONNECT
MDPE-C
PANEL
ACU #1
M M
TVSS EUH #2 EUH #3 SPARE
300A
208Y/120V
112.5 KVA
CRITICAL XFMR
208Y/120V
112.5 KVA
ESSENTIAL XFMR
400A, 240V
MDPC DISC.
400A, 240V
MDPE DISC.
E/G LOAD BANK
175 KW
E/G PANEL
ATS/BYPASS
400A, 600V
MAIN SERVICE DISC.
350A
EG EQUIPMENT ROOM
RADAR EQUIPMENT ROOM
125A
UPS INPUT
UPS BYPASS
UPS OUTPUT
TEMPORARY UPS125A 125A 125A
BYPASS
K5
FUSE
INPUT
K1
FUSE
UPS
EATON
300A
(GFE)
MONITORING SYSTEM
NEW UPS REMOTE
CABINET
BATTERY
80 KVA
[C1]
125A
125A
125A
80 KVA
UPS
MDPE-B
PANEL
MDPE-A
PANEL
100A 200A
NOTE 3
[P1]
[P1]
100A
TVSS
[P2]
INCOMING SERVICE
100A
NEMA - 3R
200A
DISCONNECT
UPS LOAD BANK
MDPC-B
PANEL
MDPC-A
PANEL
BOX
STORAGE
CABLE
LOAD BANK
PORTABLE
NOTE 6
NOTE 4
DEPARTMENT OF TRANSPORTATION
REV DESCRIPTION JCN
DATE
REDLINE
APVD
SUBMITTED BY APPROVED BY
JCN
DRAWN
CHECKED
REV
ISSUED BY
H
G
F
E
D
C
B
A
H
G
F
E
D
C
B
A
8 1234567
8 1234567
DATE
DRAWING NO
DESIGNED
REVIEWED BY
:1
:4
T h o m j o h n
DATE
APPROVED
S A
T A
D
A S
R
E
W c .d g n ACU #2
125A 125A
[P1]
AHU INSTALLATION FEEDER AND CONTROL WIRING SCHEDULE
CONDUIT
AHU 1
AHU 2
TEMP AHU
HVAC CONTROLS
1 - 2"C
1 - 2"C
1 - 2"C
2 - 3/4"C
(3)-#1/0 AWG & (1)-#6 AWG GND
PANEL WIRE
(3)-#1/0 AWG & (1)-#6 AWG GND
(3)-#1/0 AWG & (1)-#6 AWG GND
(3)-#10 AWG & (1)-#10 AWG GND
DESIGNATION
MDPE
MDPE
MDPE
| SATA-D-ASR-G001 |
| SATA-D-ASR-S001 |
| SATA-D-ASR-D001 |
| SATA-D-ASR-M001 |
| SATA-D-ASR-M002 |
| SATA-D-ASR-M003a |
| SATA-D-ASR-M004 |
| SATA-D-ASR-M005a |
| SATA-D-ASR-E001 |
File details come from the government source that posted it.