Moble Calibration SIR 6973GH-18-R-00204 SIR Questions - Gov't Response.pdf
PDF 123 KB Posted
- Solicitation number
- 6973GH-18-R-00204
About this file
Moble Calibration SIR 6973GH-18-R-00204 SIR Questions - Gov't Response (pdf)
View the file
Other files
Show 40 more
Latest 50 of 71 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIR 6973GH-18-R-00204 VENDOR QUESTIONS / GOVERNMENT RESPONSE
Question # 1 Reference:
Attachment 1 PWS, paragraph 6.2.1, International Standards Organization (ISO) 9001 Certification (page 6).
Background:
PWS 6.2.1 requires contractor facilities be certified to ISO 9001:2008 for the repair and calibration of electronic test equipment. SIR Section L, L.1, 3.2.4 Factor Three: Quality Control/Quality Assurance & Section M, 2.4 Factor Three (3) – Quality Control/Quality Assurance (and Table) indicate compliance with the ISO 9001 standard.
Note: Clarification of the ISO 9001 Certification v. Compliance requirement was requested during the market survey. Government response on Apr 5, 2018 stated; compliant will be acceptable and Section 6.2.1 of the SOW will be changed to read “The Contractor facilities used in the performance of this contract shall be ISO 9001-2008 compliant, or have ISO 9001-2008 certification for repair and calibration of electronic test equipment.”
Question:
Will the government accept contractor facilities that are compliant to the ISO 9001 standard?
RESPONSE: The Contractor facilities used in the performance of this contract shall be ISO 9001-2008 compliant, or have ISO 9001-2008 certification for repair and calibration of electronic test equipment.
Question # 2 Reference:
SIR Section L, L.1, 3.2.4 Factor Three: Quality Control/Quality Assurance & Section M, 2.4 Factor Three (3) – Quality Control/Quality Assurance (and Table).
Background:
ANSI/ASQC/ISO 9001-8000 Quality Management Standards
Question:
Please clarify that ANSI/ASQC/ISO 9001-8000 Quality Management Standards is the appropriate reference. Should it be ISO 9001:2008?
RESPONSE: Background References will be amended to show: ANSI/ASQC/ISO 9001:2008 Quality Management Standards.
Question # 3 Reference:
RFP Section L, L.1, 3.2.2 Factor One: Understanding the Requirements (page 51) & Attachment 1 PWS, paragraphs
4.13 & 6.4.2.6 & 6.4.3.8
Background:
Referenced paragraphs contradict as to the time services are to begin after contract award. L.3.2.2 indicates thirty
(30) days and PWS 4.13 & 6.4.2.6 & 6.4.3.8 indicate seven (7) days.
Question:
Please clarify if services are to begin NLT seven (7) or thirty (30) days after contract award.
RESPONSE: Services are to begin NLT (30) days after contract award.
Question # 4 Reference:
Attachment 1 PWS, paragraph 6.4.3.1 (page 12), Attachment 4 PWS-Appendix C CONUS Locations, and Attachment 5 PWS-Appendix D OCONUS Locations
Background:
Referenced paragraph requires “detailed mobile on-site schedules (CDRL A009, Mobile On-Site Calibration Schedules) for at least one annual visit at each current site location identified in Appendix C and D with bid package.”
Question:
Are all of the sites in Attachment 4 PWS-Appendix C CONUS Locations and Attachment 5 PWS-Appendix D OCONUS Locations currently being serviced as part of the incumbent contract?
RESPONSE: Of the (49) CONUS and (2) OCONUS locations listed in Appendix C & D, only 40 sites are on the current CONUS schedule. Location proximity makes it possible to service multiple locations at one common site. Only one OCONUS location (Honolulu) is serviced. A projected site schedule will be provided.
Question # 5 Reference:
Attachment 1 PWS, paragraph 6.4.4 & 6.4.5 (page 13), Attachment 4 PWS-Appendix C CONUS Locations, and Attachment 5 PWS-Appendix D OCONUS Locations
Background:
Requirement is that the Contractor shall schedule and provide an onsite MCL at each CONUS location identified in Appendix C and TFCUs at each OCONUS location in Appendix D, in accordance with established site break dates, site calibration due dates.
Question:
Please provide the calibration due dates for all equipment at each CONUS and OCONUS location in PWS Appendix C and D.
RESPONSE: Calibration due dates as well as the projected schedule will be provided.