QA Responses_Final.doc

DOC document 180 KB Posted

Attached to
Program Management and Executive Administrative Support
Solicitation number
693KA9-20-R-00013
Issued by

About this file

This solicitation requests offers for program management and executive administrative support services. Vendors will provide six positions including a program manager, two administrative analysts IV, and three administrative analysts III. The period of performance is two years with one base year and one option year. The Federal Aviation Administration seeks to make one award from this request for proposal to support acquisition and property management offices. Submissions are due by October 8, 2020. Evaluation will use a tiered approach considering service-disabled veteran-owned small businesses first, then 8(a) firms, small businesses, and full and open competition. The North American Industry Classification code is 541611 and the small business size standard is $16.5 million. Questions must be submitted in writing by the stated deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment S-1

693KA9-20-R-00013

QUESTIONS AND COMMENTS FORM

OFFEROR’S NAME: NA

GOV’T REVIEWER/DATE:

QUESTION NUMBER
SIR

SECTION

PAGE NO.
OFFEROR’S QUESTIONS
OFFERORS’

PROPOSED CHANGE

GOV’T RESPONSE
GOVERNMENT’S COMMENTS TO PROPOSED CHANGES/COMMENTS
YES
NO
1
L.14.3
61

Tab A requires completion of SF-33.

There is no SF-33 provided in SIR/RFP Government to provide Standard Form 33

(SF-33)

X

SF-33 was posted on 9/23/2020

2
ATT.

S-3

PPQ

Most POCs for Past Performance reference contracts are reluctant to complete the Questionnaires if they have already issued CPARs for the contracts. Can offerors submit CPARs in lieu of Questionnaires?
For Past Performance Reference Contracts in which Contractor Performance Assessment Report (CPAR) is issued by the customer (Government), Offerors can submit the CPARs in lieu of the Questionnaires.
X

See amendment to SIR/RFP: CPARs may be submitted in lieu of attachment S-3 as long as it addresses the following minimum elements: cost control, schedule, quality and customer satisfaction.

3
Tab D

(2)

Can Offerors submit CPARs in lieu of Past Performance Report prepared by Dun & Bradstreet.
For Past Performance Reference Contracts in which Contractor Performance Assessment Report (CPAR) is issued by the customer (Government), Offerors can submit the CPARs in lieu of the Dun & Bradstreet Report
X

See amendment to Tab D (2).

Can you provide incumbent contract info if applicable?

X

DTFAWA-15-C-00044 Bellamy Management Services LLC, (202) 863-2270 or bms@bms-llc.com

Does the Program Manager need to be onsite 100% or can this be a remote position?
Given COVID restrictions, we respectfully request that telecommuting be allowable.

No, it is not a requirement for the PM to be onsite 100% of the time. However, the PM must be available to the FAA Program Office to meet face-to-face after facility opening, as required.

6
Beta.sam announcement
Can you clarify the tiered evaluation process for determining award? How will you determine SDVOSB( Tier 1) award from an 8(a) award (tier 2)? If the FAA evaluates SDVOSB firms first and determines a viable contractor, will the applications of the other tier 2-5 firms NOT be evaluated?
Firms that are not Tier 1 run the BIG risk of expending time to develop and submit a proposal that will NOT even be considered for award. This is a big risk for companies expending valuable resources without an opportunity to earn business. Setasides are usually established in the market research phase to determine market competition adequacy. We ask that all tiers be evaluated against each other so that all companies have a fair opportunity to compete for the FAA business.
X

Please see Section M.2 Evaluation Process for the explanation of the tiered evaluation.

As this is a T&M contract, what is the level of effort for each of the 3 labor positions.

The level of effort is determined by the task to meet an acceptance according to the deliverable.

Are you satisfied with incumbent performance?

Not relevant

Can you please confirm, how many years incumbent candidate working with this requirement?

5 years

Is this contract covered by the EO 13706?

X

Can you please confirm, whether the fringe ($4.22 / $4.54) is applicable to this requirement or not?

NA

Is this position covered by the SCA? If so, what occupation code is utilized for this requirement per applicable DOL wage determination?

X

What labor category on the Wage Determination will this be categorized as?

NA

14
3.10.4-5
19
How many hours are required per year (1920 / 2000 / 2080)?

The maximum number of hours for the Administrative Support positions is 1920. The maximum number of hours for the Program Manager is 960.

Does this fall under GSA schedule 70 or any other GSA schedule?

X

16
N/A
N/A
The posted SIR is titled: “693KA9-20-R-00013+draft+rev+082720.” Is the posted SIR the final document?

X

17
B
N/A
B.4 PRICING SCHEDULES does not provide a quantity of hours required, nor is that information provided elsewhere in the SIR or posted attachments. Nor are there quantities of work statistics provided that could allow the bidder to determine the number of hours/people needed. What are the number of hours or full time equivalents by CLIN which are required?

Pricing should be based on 1920 hours for each of five (5) the Administrative Support positions and 960 hours for the one (1) Program Manager.

18
B
N/A
B.4 PRICING SCHEDULES appears to require bidders to provide a bid for CLINs 0005 and 1005 ODCs. No information is provided to allow bidders to develop that estimate.
Please provide a “plug” number to be used by all bidders for CLINs 0005 and 1005 (and instructions as to whether that number includes vendor burdens) or affirmatively state no estimate/bid is required for those CLINs or provide guidance as to what costs should be estimated (specific trips (to/from location, number of days/nights), specific materials and quantities to be purchased) to develop a bid for those CLINs.

No travel is required under this contract at this time. Meetings will be virtual until further notice. A fixed price NTE in the amount of $10K is provided in the amendment.

19
C

Please confirm the Administrative Program Manager may perform the tasks described in paragraph 3.1 Task 1 – Program Management Support from either the contractor site or the government site?

The Program Manager may perform this task at a government site if space is available with the approval of the CO.

20
C

Please confirm if the FAA doesn’t require a government site Administrative Program Manager that a solution proposing a contractor site PM will not be evaluated less favorably than a solution proposing a government site PM.

N/A

21
C
9

3.1.4 Transition-In Plan and Execution states the awardee will “conduct a Transition-In period during the first 30 business days after the Task Order award date.” Please confirm the predecessor contractor will be responsible for day-to-day tasking during the initial 30 day Transition-In Period referenced in 3.1.4.

X

22
C

Are these services currently being performed at the FAA location or are services being performed via telework due to COVID-19 restrictions? If the latter, is there an anticipated date for return to government site work?

All support personnel will continue to telework remotely during COVID-19

23
F
F.3 PLACE OF DELIVERY states: “The contractor must deliver all items F.O.B. destination to the place specified in Section Part I-C the contract.” Part I Section C does not list a place of performance. What is the place of performance for this contract?
Please provide a place of performance in either (or both) Sections C or F.

Place of Performance is located at FAA National Headquarters 3rd Floor, Suite 306 West

800 Independence Ave, SW

24
H
23
H.2 AMS CLAUSE 3.8.2-17 KEY PERSONNEL AND FACILITIES (MAY 1997) does not list Key Personnel. Attachment J-1 appears to identify the Administrative Program Manager as the only Key Personnel. Section L states “The government will evaluate the key personnel training and experience against the government’s requirements listed in the SOW and clause H.2.” Please confirm the Administrative Program Manager is the only Key Personnel position on the contract.
Please identified Key Personnel position titles to H.2 (d).
X

Program Manager

25
I
40
I.9 3.14-2 CONTRACTOR PERSONNEL SUITABILITY REQUIREMENTS (JUL 2016) does not identify the designated risk levels for the contract positions on this contract. What are the clearance/security requirements for the contract positions?
Please identify the designated risk levels for all positions on the contract and any other clearance requirements for the contract positions (for example, do the positions require a “Secret” clearance in addition to being issued an FAA identification card?).
X

The positions under this contract are “Low Risk”

26
K
46
K.2 3.2.2.3-23 PLACE OF PERFORMANCE (JUL 2004) requires bidders to identify “one or more plants or facilities located at a different address from your address as stated in this offer” at which work under the contract will be performed. Vendor anticipates work will be performed at FAA facilities.
Please provide the address for all FAA locations at which work is anticipated to be performed on this contract.
X

See response to question #23

27
L
54
L.1 3.2.2.3-20 ELECTRONIC OFFERS (JUL 2004) states: “(a) The offeror (you) must submit responses to this SIR electronically via the internet. All responses must be encrypted and password protected. Hard copy proposal submissions will not be accepted.” and “(e) Send your offer electronically to see Section L.13.” L.13.1General (pg 57) states: “(a) The Offeror must submit proposals to the FAA's Contract Division via internet to Curtis.fields@faa.gov NOT LATER THAN 4:00 PM, E.S.T. on Thursday October 8, 2020. All responses must be encrypted and password protected.” and “(b) The offeror must submit responses to this SIR in electronic format.” L.14.2 Proposal Organization/Format (pg 58) states: “(a) The proposal must consist of two separate three-ring, loose leaf binders. One for the technical proposal and one for the price proposal. Each binder must be individually titled: VOLUME I - TECHNICAL PROPOSAL and; VOLUME II - PRICE PROPOSAL. (b)To aid in evaluation, all pages of each section must be appropriately numbered and identified with the date and the solicitation number to the extent practicable. Each copy of the proposal must be labeled on the front identifying Offeror’s name, SIR number, and the proposal copy (e.g., Copy 1 of 2 and Copy 2 of 2). (c) Copy number l of the proposal package must contain the signed original of all documents requiring signature by the Offeror. Use of reproductions of signed originals is authorized in all other copies of the proposal.” Instructions at L.14.2 appear to indicate a hard copy submittal. Please clarify if the proposal is to be submitted electronically or via hard copy. If via hard copy please provide the shipping address and instructions for the proposal delivery.

See amendment to L.14.2

28
L
59
L.14.3.1.2 Preparation Instructions, Tab D – Past Performance states: “(1) A list of all existing and prior contracts and subcontracts, greater than one million dollars, completed during the past five years.” Please confirm the $1M value is for the entire period of performance of the contracts cited.

X

29
L
60
L.14.3.1.2 Preparation Instructions, Tab D Past Performance states: “(2) The offeror must submit a copy of the most recent past performance report prepared by Dun & Bradstreet.” As of Friday, December 6th 2019, the D&B Open Ratings Past Performance Service stopped accepting new orders for performance evaluations. Therefore, vendors are unable to order and submit a D&B past performance report.
Delete the requirement for the past performance report prepared by Dun & Bradstreet.

See response to question #2 and #3.

30
L
61
Please confirm this statement in L.14.3.2.1 General (c) It is essential that the Offeror's estimation procedures be fully disclosed and that you have adequate financial resources to perform the contract and the ability to obtain resources. Each Offeror's proposal must be based on its current approved accounting system.” means only vendors with accounting systems approved by DCAA are eligible to submit proposals in response to this SIR. If that is not the intent, please identify what entity must approve a vendor’s accounting system for that vendor to be eligible to submit a proposal in accordance with the L.14.3.2.1 (c) requirement.
X
L.14.3.2.1 (c) makes no mention of DCAA. Please see L.14.3.2.1 (d).
31
L
61
L.14.3.2.2Preparation Instructions states: “The Offeror must complete the price proposal as described below. Unit prices when multiplied by unit quantities must equal the total prices. The Offeror must also include any quantity discount in the pricing tables. It should be noted that if the Offeror chooses not to offer discounted prices, it will not render the proposal nonresponsive.” Please identify against what standard quantity discounts should be calculated. How will the government verify rates have been discounted when there are no “ceiling” rates against which to compare the proposed rates?

See amendment to L.14.3.2.2

32
M
65
M.3.4 TECHNICAL EVALUATION FACTORS AND ORDER OF IMPORTANCE states both “The technical evaluation factors are specified in descending order below.” and “All four technical factors are of equal importance.” Please clarify if the factors are equally rated or listed in order of importance.

The four technical factors are listed in descending order, not descending order of importance. The four technical factors are of equal importance as stated.

33
M
66
M.3.4.2 FACTOR 2: PROPOSED STAFFING AND EXPERIENCE states: “This Factor will be evaluated based on the extent to which it demonstrates a likelihood of successful performance in regards to the offeror submitting written responses to the degree to which the Offeror’s capability to maintain staffing levels consistent with the SOW’s level of effort.” Please identify the “level of effort” against which vendor’s proposals will be evaluated.

See response to question number 68

34
M
66
M.3.4.3 FACTOR 3: KEY PERSONNEL states: “This Factor will be evaluated based on the extent to which it demonstrates a likelihood of successful performance in regards to the submittal of a letter of commitment for Key Personnel (Primary Point of Contact/Program Manager) to meet Task 1 experience requirements listed in the Statement of Work, Section 3.1, on efforts for same or similar size scope.” Please identify the “size” of effort against which the PM candidate’s experience will be measured.

See response to question number 14

35
Att J-1
J-2
The Administrative Support Analyst III position requirements state: “Minimum Education: A two-year college degree in business or related field, or equivalent plus ten (10) years of progressive professional experience. Substitution: A High School diploma with ten (10) years of professional administrative experience is required.” Please confirm if a High School diploma is substituted for the two year degree that 20 years of experience are required in addition to the High School diploma.

See amendment to attachment J-1.

36
Att J-1
J-3
Please confirm this statement in the Administrative Support Analyst III position requirements (“Provides day-to-day support to building services for maintenance, operations, and the Mobility Center; and support project management for construction and space renovations.”) means the contractor staff member support will be restricted to administrative support for the building services functions listed.

Per Task 2, the Admin Support will provide day-to-day organizational and program operations for the Office of Acquisition and Business Services (ACQ-1), Aviation Property Management (APM-1), HQ’s Building Services Division (APM-100) and Project Management Division (APM-300) offices.

37
Att S-3
2
Please clarify the difference between “Service Support” and “Service” in Box 11 of the chart on page 2 of the form.

For purposes of this solicitation checking either box will suffice.

38
N/A
N/A
Please extend the due date for vendor proposals to no less than 21 calendar days after publication of the answers to all timely vendor questions or publication of the final SIR, whichever is later.
39
C
11
Task Order 2 states “travel and attend meetings” and a firm fixed price is listed for Travel is listed on Part I Section B. Can the Government say where and how often historically travel is needed?
For evaluation purposes can the government set a fixed price for all Offerors to use?

No travel will be required under the contract at this time.

40
C
17

5. Travel is not anticipated for the Task Order. On page 11 it states Travel and attendance of meetings is required. FFP for travel is requested in pricing. Can the Government Clarify?

See response to question #22 and #39

No Clearance level is listed. Can the Government clarify if a Secret, TS, or no clearance is needed?

See response to question #25

14
Can the Government provide historical work loads for task listed in the table on page 14?

X

43
B

Will the Government provide the Quantity of hours needed historically for each listed Labor Category?

X
No, since this is a T&M Contract, the offeror’s must submit their proposal based on 1920 hours for each Admin Support position and 960 hours for the Program Manager.
44
L
60

(3) “The questionnaire is due in accordance with section L.15. Section L ends after L.14.3.2.2 Preparation Instructions. Can the Government clarify where, when and how the Past Performance Questionnaire is due?

See amendment to L.14.3.2.2

If the offeror does not have an FAA Contract Vehicle, is the offeror still eligible to submit a response to this RFP

X

If the offeror is a small business that has not had a prime Govt Contract but has subcontracted to large business, will the FAA accept the past performance of non prime contracts?

X

47
Tab D
60
Is the FAA only accepting past performance valued at 1 million or more? “(1)A list of all existing and prior contracts and subcontracts, greater than one million dollars

X

48
L.14.3.2.1General
61
If the offeror is a small business and has yet to receive an audit of their accounting system from DCAA, is the offeror eligible to submit a response to this RFP?

X

See Section L.14.3.2.1 (d)

If the offeror has had a prime contract at the State and Commercial level, will that past performance be acceptable?

X

When will the FAA release the answers to all questions?

X

If the offeror is a Veteran Owned Small Business and not a Service Disabled, will they receive the same evaluation criteria?

X

52
1
1

The document is labeled draft. Is this the final document?

X

53
B.4

B.4. States “the contractors may add rows for additional labor categories.” It is unclear how doing so will allow the evaluation of proposals based on the evaluation criteria if you are not comparing apples to apples.

Delete that statement.

See amendment to Section B.4

54
C
13
The Government states “The Government’s Initial Review of each deliverable is performed in accordance with the “Initial Review” terms listed in the Acceptance Criteria section below.”
Please define what the final review terms are and how long after the initial review will the final review occur.

The initial review key provides what the output should be to meet the final deliverable.

55
3.1.3
The Government states “The Contractor must meet quarterly with the PMO and COR for a Program Management Review (PMR) at a location as requested by the COR.” In what region of the country will these meetings occur?
Recommend changing to “The Contractor must meet quarterly with the PMO and COR for a Program Management Review (PMR) at a location as requested by the COR within the NCR.
X
No. Meetings will be held virtually at this time.
56
M.3.4.4
66

The Government states “offeror’s lack of past performance on similar types of contracts may result in an offeror receiving a lower rating.” Since all other federal agencies rate contractors with no similar past performance as neutral. Why is FAA not willing to give new organizations a fair opportunity?

This solicitation will give all respondents a fair opportunity to compete. Past performance is an evaluated factor that is equally important to the other factors so its importance cannot be diminished. A neutral rating is designed to be neither hinder or advance new entrants in the competition area, to allow for their participation but not discounting the information that past performance provides (either positive or negative) by those establish in an area of competition. The FAA will impartially and objectively evaluate any potential offerors based on the evaluation criteria, so we encourage you to pay particular attention to the details required for the proposal.

57
Section L.14.3.1.2Tab D (1)
We respectfully request that you lower the dollar threshold for the list of existing and prior contract and subcontracts. We also request that all major subcontractors be allowed to contribute to this list as well.
(1) The offeror and any major subcontractors should supply a list of all existing and prior contracts and subcontracts, greater than one million dollars, completed during the past five years for the same or similar kind of work. Include the following information for each contract and subcontract:

Name of contracting activity

Contract number

Contract type

Total contract value

Contract work/description

Contracting Officer and telephone

Program manager and telephone

List of major subcontractors

X

58
SECTION M

M.3.4.4

If the SDVOSB teams with a sub, will the past performance of the sub be acceptable, and will it carry the same weight as if it were from the prime if the prime does not have that specific experience?

X

59
SECTION M

M.3.4.4

In the case that the SDVOSB Prime doesn’t have past performance, will the key personnel’s past experience be accepted?

X

60
1.1
4
How many positions are currently supporting this operation?

Six (6)

61
1.1
4
How many people are the current incumbents supporting?

Six (6)

62
SECTION K

K.2

46
What is the remote technology capability platforms required to access system?

Pulse Secure VPN

63
SECTION K

K.2

46
What communication/collaboration tools are currently being utilized (i.e. WebEx, Microsoft Teams, Zoom, etc)?

Both MS Teams and Zoom

64
L.14.3.1.2 – Tab D
60
As we are reviewing the past performance requirements/PPQ’s, no guidance was given on type of past performance required. Can our past performance and PPQ’s be for personal performance as a contractor employee since this will be our first contract?
The government will accept personal work as past performance and will accept PPQ’s based upon personal performance.

X

65
F.1
20
Will the base period be provided prior to submission?
X
Base period will be determined prior to award
66
H.11
27
Will the Government be providing Government issued computers for all personnel on the SIR?

X

67
B.5
Sec B
Will the government be providing the ceiling price prior to submission?

X

68
B.4
1

It appears as though the government is requesting 3 FTEs for this project, Program Manager Admin IV, and Admin III, is this correct?

There are six (6) positions under this contract.

One (1) Program Manager

Two (2) Admin IV

Three (3) Admin III

69
L.13

Would the government consider decreasing the page limit for the technical proposal from 50 pages to 25?

X

70
3.3.1-11
35
Does the Government anticipate additional funding for this contract beyond FY2021?

X

When does the Government anticipate making an award?

Hopefully by years end or early CY 21

In light of COVID-19 and the CARES Act. What happens in the instance where an employee potentially thinks that they have COVID-19, displays signs of the illness or have been in contact with someone who has. We know that the employee must potentially be tested and then quarantine for 14 days or at least until such time that the test comes back negative. I have found in some cases that the contracting officer still wants a "Body" on the contract while the potentially ill employee is tested and cleared (at least 14 days but in the case where the person is positive, longer). In cases where the second person is needed/ required you (the small business) are essentially paying for two staffers (one sick leave and the other regular pay). Not to mention, the cost of vetting, background checks and so on. How does the small business re-coup the cost or will the agency allow billing for both bodies during the time period that the first employee is out?

There are specific procedures in place that will be provided to the awardee. Standard contract procedures allow for adjustments. Recoup is not guaranteed. Determinations will be made on case by case basis if replacement is required.

73
L.14.3.1.2
60

Will a vendor with no past performance serving the FAA be disqualified or materially reduce the scoring where they are unlikely to win?

X
The proposals will be rated not scored.
74
L.14.3.1.2
60

Will a vendor with no federal government past performance but with demonstrated direct equivalent and relevant private sector past performance be disqualified or materially reduce the scoring where they are unlikely to win?

X

75
L.14.3.1.2
60

Does private sector experience advising and working in the commercial and private sector aviation industry (not the FAA) improve the scoring of a vendor’s response?

X

76
L.14.3.1.2
60

Does private sector experience advising and working in highly regulated industry such as financial services, health care, and life science improve the scoring of a vendor’s response?

X

77
L.14.3.1.2
60

Attachment S-3 in Part III – SECTION J appears specific to government past performance. Are vendors able to submit private sector clients as references?

X

78
M.2
In the evaluation process the current tiers do not address WOSB concerns. Will the government open a tier to consider WOSB prior to considering general Small Business Concerns?
Third tier – Women Owned Small Business (WOSB)

Fourth tier – Small Business Concerns

Fifth tier - Full and Open Competition

X