FENS SIR - Section I - Amendment 9.docx

DOCX document 80 KB Posted

Attached to
Federal Aviation Administration (FAA) Enterprise Network Services (FENS), Screening Information Request (SIR) Amendment 10
Solicitation number
693KA8-20-R-00022
Issued by

About this file

This document is an amendment to a screening information request (SIR) for the Federal Aviation Administration's (FAA) Enterprise Network Services. The amendment corrects a typographical error in one of the evaluation criteria related to supporting current and future data throughput demands. Offerors may submit a revised proposal in response, but must explain how the revision directly relates to the correction. Offerors not revising their proposals must notify the FENS contracting officer by December 16, 2021. The SIR is for enterprise network services and seeks to meet requirements for connections and supporting usage demands. The FAA is the issuing agency.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

693KA8-20-R-00022, Amendment 69

PART II – CONTRACT CLAUSES

SECTION I – CONTRACT CLAUSES

I.1 FAA Acquisition Management System (AMS) Clauses and Provisions Incorporated by Reference (July 2019) This screening information request (SIR) or contract, as applicable, incorporates by reference the provisions or clauses listed below with the same force and effect as if they were given in full text. Upon request, the Contracting Officer (CO) will make the full text available, or offerors and contractors may obtain the full text via the Internet at https://fast.faa.gov/contractclauses.cfm.

Clause
Clause Title
3.1.7-1
Exclusion from Future Agency Contracts (July 2018)
3.1.7-2
Organizational Conflicts of Interest (July 2018)
3.1.7-4
Organizational Conflicts of Interest – Mitigation Plan Required (October 2019)
3.1.7-5
Disclosure of Conflicts of Interest (July 2018)
3.1.8-1
Cancellation, Rescission and Recovery of Funds for Illegal or Improper Activity (October 2014)
3.1.8-2
Price or Fee Adjustment for Illegal or Improper Activity (October 2019)
3.2.2.3-8
Audit and Records (July 2010)
3.2.2.3-29
Integrity of Unit Prices (July 2004)
3.2.2.3-30
Termination of Defined Benefit Pension Plans (July 2004)
3.2.2.3-67
Special Precautions for Work at Operating Airports (July 2004)
3.2.2.7-6
Protecting the Government’s Interest when Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (April 2011)
3.2.2.7-8
Disclosure of Team Arrangements (April 2008)
3.2.4-36
Award Fee (October 2019)
3.2.5-1
Officials Not to Benefit (April 2021)
3.2.5-3
Gratuities or Gifts (October 2019)
3.2.5-4
Contingent Fees (October 1996)
3.2.5-6
Restrictions on Subcontractor Sales to the FAA (October 2019)
3.2.5-8
Whistleblower Protection for Contractor Employees (April 1996)
3.2.5-13
Contractor Code of Business Ethics and Conduct (April 2010)
3.2.5-14
Display of Hotline Poster(s) (April 2008)
3.3.1-1
Payments (July 2018)
3.3.1-4
Payment under Communication Service Contracts with Common Carriers (July 2018)
3.3.1-5
Payments under Time-and-Materials and Labor-Hour Contracts (July 2018October 2021)
3.3.1-6
Discounts for Prompt Payment (July 2018)
3.3.1-11
Availability of Funds for the Next Fiscal Year (April 1996)
3.3.1-14
Limitation of Funds (July 2018)
3.3.1-15
Assignment of Claims (July 2018)
3.3.1-17
Prompt Payment (January 2021)
3.3.1-20
Providing Accelerated Payment to Small Business Subcontractors (October 2012)
3.3.1-34
Payment by Electronic Funds Transfer- System for Award Management (July 2018)
3.3.2-1
FAA Cost Principles (October 2019)
3.3.2-2
Reimbursement for Travel and Subsistence (April 2010)
3.4.1-10
Insurance- Work on a Government Installation (October 2020)
3.4.1-12
Insurance (October 2019)
3.4.2-6
Taxes – Contracts Performed in U.S. Possessions or Puerto Rico (October 1996)
3.4.2-8
Federal, State, and Local Taxes – Fixed Price Contract (July 2019)
3.5-1
Authorization and Consent (January 2019)
3.5-2
Notice and Assistance Regarding Patent and Copyright Infringement (January 2009)
3.5-3
Patent Indemnity (April 2017)
3.5-10
Patent Rights – Ownership by the Contractor (January 2009)
3.5-13
Rights in Data – General (October 2014)
3.5-13
Rights in Data – General, Alternate II (January 2009)
3.6.1-3
Utilization of Small, Small Disadvantaged, Women-Owned, Service-Disabled Veteran Owned, and Small Business Concerns (January 2021)
3.6.1-4
Small, Small Disadvantaged, Women-Owned, and Service-Disabled Veteran Owned, and HUBZone Small Business Subcontracting Plan (July 2021)
3.6.1-6
Liquidated Damages – Subcontracting Plan (January 2010January 2021)
3.6.1-9
Mentor Protégé Program (January 2021)
3.6.1-11
Mentor-Protégé Requirements and Evaluation (January 2021)
3.6.1-15
Post Award Small Business Program Re-representation (January 2021)
3.6.2-2
Convict Labor (April 1996)
3.6.2-9
Equal Opportunity (July 2020)
3.6.2-10
Equal Opportunity Pre-award Clearance of Subcontracts (January 2020)
3.6.2-12
Equal Opportunity for Veterans (July 2020)
3.6.2-13
Affirmative Action for Workers With Disabilities (July 2020)
3.6.2-16
Notice to the Government of Labor Disputes (October 2018)
3.6.2-35
Prevention of Sexual Harassment (October 2018)
3.6.2-39
Trafficking in Persons (April 2019)
3.6.2-44
Notification of Employee Rights Under the National Labor Relations Act (January 2019)
3.6.3-16
Drug Free Workplace (March 2009)
3.6.3-17
Efficiency in Energy-Consuming Products (January 2020)
3.6.3-23
Delivery of Electronic and Paper Documents (January 2020)
3.6.4-10
Restrictions on Certain Foreign Purchases (January 2010)
3.6.4-21
Export Control (July 2014)
3.6.4-23
Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (January 2021)
3.6.5-1
Utilization of Indian Organizations and Indian Owned Economic Enterprises (April 2021)
3.8.2-9
Site Visit (April 1996)
3.8.2-10
Protection of Government Buildings, Equipment, and Vegetation (July 2019)
3.8.2-11
Continuity of Services (October 2018)
3.9.1-1
Contract Disputes (January 2020)
3.9.1-2
Protest After Award (August 1997)
3.10.1-7
Bankruptcy (April 1996)
3.10.1-12
Changes – Fixed Price (April 1996)
3.10.1-12
Alternate I Changes – Fixed Price (April 1996)
3.10.1-13
Changes – Cost Reimbursement (April 1996)
3.10.1-13
Alternate I Changes – Cost Reimbursement (April 1996)
3.10.1-14
Changes – Time and Materials or Labor Hours (April 1996)
3.10.1-25
Novation and Change-Of-Name Agreements (October 2007)
3.10.1-26
Contractor Performance Assessment Reporting System (April 2021)
3.10.2-3
Subcontracts (Time-and-Materials and Labor-Hour Contracts) (April 1996)
3.10.2-5
Competition in Subcontracting (January 1998)
3.10.2-6
Subcontracts for Commercial Items and Commercial Components (April 1996)
3.10.3-2
Government Property – Basic Clause (April 2019)
3.10.3-2
Alternate I Government Property – Basic Clause (October 2018)
3.10.4-19
Government Industry Data Exchange Program (GIDEP) (January 2018)
3.10.4-26
Technical Data Quality Requirement for NAS Procurements (January 2004)
3.10.5-1
Product Improvement/ Technology Enhancement (April 1996)
3.10.6-1
Termination for Convenience of the Government (Fixed Price) (October 1996)
3.10.6-3
Termination (Cost-Reimbursement) (January 2020)
3.10.6-7
Excusable Delays (October 1996)
3.13-5
Seat Belt Use by Contractor Employees (October 2001)
3.13-11
Plain Language (July 2006)
3.13-13
Contractor Policy to Ban Text Messaging While Driving (January 2011)
3.13-14
Reporting Executive Compensation and First-Tier Subcontract Awards (January 2018)
3.14-2
Contractor Personnel Suitability Requirements (April 2021)
3.14-3
Foreign Nationals as Contractor Employees (January 2019)
3.14-4
Access to FAA Facilities, Systems, Government Property, and Sensitive Information (JulyOctober 2021)
3.14-5
Sensitive Unclassified Information (SUI) (July 2013January 2022)
3.14-6
Privacy or Security Safeguards (November 2016)

I.2 AMS 1.13-1 Notice of Earned Value Management System (July 2016) The offeror’s (you/your) response to this screening information request (SIR) must include proof of a certified EVMS or provide a plan (the plan) to implement a certified system that complies with the EVMS criteria (the criteria) stated in subparagraph (b) of clause 1.13-2, "EVMS." You must submit the following as part of your proposal for Contracting Officer (CO) approval:

(a) Documentation demonstrating that your EVMS has been Electronic Industries Alliance Standard 748(EIA-748) certified and EVM surveillance documentation demonstrating that you have maintained an EIA-748 compliant EVMS at the time this SIR is issued; or

(b) The plan that explains how your EVMS will be certified for each guideline of the EIA-748 Standard.

(c) Names of subcontractors. If you have not yet identified subcontractors, you must identify any part of the work you intend to award to subcontractors. The CO must approve the subcontractors before you sign contracts with them.

(End of provision)

I.3 AMS 1.13-2 Earned Value Management System (July 2016)

(a) The Earned Value Management System (EVMS) is a management tool that provides for integrating technical, cost and schedule information about contract performance. This information enables the FAA (we) and contractor program managers to manage contracts more effectively. The American National Standards Institute/Electronic Industries Alliance ANSI/EIA -748, Earned Value Management Systems, specifies the EVMS criteria that are incorporated by reference into this clause.

(b) The Contractor (you/your) must use an EVMS complying with the current version of EIA-748 that the FAA Contracting Officer (CO) or the contracting officer from another federal agency certified before contract award. If you do not have a certified EVMS in place at the time of award, you must provide the CO with your plan to create an EVMS that complies with EIA-748 before award and implement the system within 90 days after award.

(c) Approved subcontractor EVM plans:

(1) The CO must approve subcontractor EVMS plans before they begin work. The CO has approved the following subcontractor EVMS systems.

[CO to insert name of approved subcontractor and EVMS plan here] [CO to insert name of approved subcontractor and EVMS plan here]

(2) You must require subcontractors listed in the contract and subject to EVMS certification to comply with this clause, paragraphs (a) and (b).

(d) You must submit an Integrated Program Management Report (IPMR) prepared under [Contracting Officer to insert reference to location of the applicable DID DI-MGMT-81861 that specifies the contract's reporting requirements. The CO may request customized earned value management reports but at a minimum contractors must submit DID Formats 1, 3, 5, 6 and 7].

(e) You must obtain approval for EVMS system revisions consistent with the EVM system change process approved with the EVM certification or similar agreement, i.e., EVM Advance Agreement, with the controlling certification approval or acceptance party.

(f) You must participate in FAA EVM Surveillance and provide access to all pertinent records and data requested by the CO so the we can verify that your EVMS complies with the criteria specified in subparagraph (b) at the time of award and throughout contract performance consistent with the FAA EVMS Surveillance Guide.

(End of clause) I.4 AMS 1.13-5 Integrated Master Schedule (October 2019)

(a) Offerors must submit an Integrated Master Schedule (IMS) report prepared under Integrated Program Management Report (IPMR) DID DI-MGMT-81861 Format 6.

(b) Offerors must manage the execution of the [CO to insert program name] program using the IMS as a day-to-day execution tool and periodically assess program progress in meeting program requirements. Offerors must report on program progress consistent with the IMS at each program management review, at selected technical reviews and at other times at the Government's request.

(c) Offerors must revise the IMS, where necessary, to reflect current contract milestones and deliverables. The IMS will include all activities of the prime contractor, subcontractors, and dependencies on the Government. All contractor schedule information delivered to the Government or presented at program reviews must originate from the IMS. You must perform appropriate analyses of the IMS tasks and report potential or existing problem areas and recommend corrective actions to eliminate or reduce schedule impact to the program.

(End of clause) I.5 AMS 1.13-6 Contractor Integrated Baseline Review (July 2016)

(a) The Contractor (you) must participate in a Government-conducted Integrated Baseline Review (IBR) with acceptable action plans approved by the Contracting Officer within 120 days after contract award [CO to insert date or event] and after executing major contract modifications.

(b) The IBR will be conducted consistent with the FAA Integrated Baseline Review (IBR) Guide.

(End of Clause)

I.6 AMS 1.13-7 Earned Value Management System - Withholding of Payment (October 2019)

(a) Definition "Significant Deficiency" means a shortcoming that affects the ability of the FAA to rely on information provided by the Earned Value Management System (EVMS) that is needed for management purposes.

(b) General The Contractor must establish and maintain an acceptable EVMS in accordance with the terms and conditions of this contract.

(c) Significant Deficiencies.

(1) The contractor must respond, in writing, within 30 days to an initial determination that there are one or more significant deficiencies in the Contractor's EVMS.

(2) The Contracting Officer will evaluate the Contractor's response and notify the Contractor, in writing, of the final determination whether the Contractor's EVMS contains significant deficiencies. If the Contracting Officer determines that the Contractor's EVMS contains significant deficiencies, the final determination will include a notice to withhold payments.

(d) Withholding Payments

(1) If the Contracting Officer issues the final determination with a notice to withhold payments for significant deficiencies in the Contractor's EVMS as required under this contract, the Contracting Officer will withhold five percent of amounts due from a progress payments and performance-based payments, and direct the Contractor, in writing, to withhold five percent from its billings on interim cost vouchers on cost, labor-hour, and time-and-materials contractors until the Contracting Officer has determined that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination. The Contractor must, within 45 days of receipt of the notice, either correct the deficiencies or submit an acceptable corrective action plan showing the milestones and actions to eliminate the deficiencies.

(2) If the Contractor submits an acceptable corrective action plan within 45 days of receipt of a notice of the Contracting Officer's intent to withhold payments, and the Contracting Officer, in consultation with the auditor or functional specialist, determines that the Contractor is effectively implementing such plan, the Contracting Officer will reduce withholding directly related to the significant deficiencies covered under the corrective action plan, to two percent from progress payments and performance-based payments, and direct the Contractor, in writing, to reduce the percentage withheld on interim cost vouchers to two percent until the Contracting Officer determines the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination. However, if at any time, the Contracting Officer determines that the Contractor has failed to follow the accepted corrective action plan, the Contracting Officer will increase withholding from progress payments and performance-based payments, and direct the Contractor, in writing, to increase the percentage withheld on interim cost vouchers to the percentage initially withheld, until the Contracting Officer determines that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination.

(3) Payment withhold percentage limits (i)The total percentage of payments withheld on amounts due under each progress payment, performance-based payment, or interim cost voucher, must not exceed five percent for one or more significant deficiencies in the Contractor's EVMS.

(ii) If this contract contains pre-existing withholds due to significant deficiencies in the Contractor's EVMS, and the application of any subsequent payment withholds will cause withholding under this clause to exceed the payment withhold percentage limits in paragraph (d) (3) (i) of this clause, the Contracting Officer will reduce the payment withhold percentage in the final determination to an amount that will not exceed the payment withhold percentage limits.

(4) For the purpose of this clause, payment means any of the following payments authorized under this contract:

(i) Interim payments under-

(A) Cost-reimbursement contracts;

(B) Incentive-type contracts;

(C) Time-and-materials contracts;

(D) Labor-hour contracts

(ii) Progress payments.

(iii) Performance-based payments.

(5) Payment withholding will not apply on fixed-price line items where performance is complete and the items were accepted by the FAA.

(6) The withholding of any amount or subsequent payment to the Contractor will not be construed as a waiver of any rights or remedies that the FAA has under this contract.

(7) Notwithstanding the provisions of any clause in the contract providing for interim, partial, or other payment withholding on any basis, the Contracting Officer may withhold payment in accordance with the provisions of this clause.

(8) The payment withholding authorized in this clause is not subject to the interest-penalty provisions of the Prompt Payment Act.

(e) Correction of deficiencies

(1) The Contractor must notify the Contracting Officer, in writing, when the Contractor has corrected the deficiencies of the EVMS.

(2) Once the Contractor has notified the Contracting Officer that all deficiencies have been corrected, the Contracting Officer will take one of the following actions:

(i) If the Contracting Officer determines that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination, the Contracting Officer will, as appropriate, discontinue the withholding of progress payments and performance-based payments, and direct the Contractor, in writing, to discontinue the payment withholding from billings on interim cost vouchers under this contract associated with the Contracting Officer's final determination, and authorize the Contractor to bill for any monies previously withheld that are not also being withheld due to other significant deficiencies. Any payment withholding under this contract due to other significant deficiencies will remain in effect until the Contracting Officer determines that those significant deficiencies are corrected.

(ii) If the Contracting Officer determines that the Contractor still has significant deficiencies, the Contracting Officer will continue the withholding of progress payments and performance-based payments, and the contractor must continue withholding amounts from its billings on interim cost vouchers in accordance with paragraph (d) of this clause, and not bill for any monies previously withheld.

(iii) If, within 90 days of receipt of the Contractor notification that the Contractor has corrected the significant deficiencies, the Contracting Officer has not made a determination whether the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination, or has not made a determination whether there is a reasonable expectation that the corrective actions have been implemented, the Contracting Officer will reduce withholding directly related to the significant deficiencies covered under the corrective action plan by at least 50 percent of the amount being withheld from progress payments and performance-based payments, and direct the Contractor, in writing, to reduce the percentage withheld on interim cost vouchers by at least 50 percent, until the Contracting Officer makes a determination whether the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination, or has made a determination whether there is a reasonable expectation that corrective actions have been implemented.

(iv) At any time after the Contracting officer reduces or discontinues the withholding of progress payments and performance-based payments, or directs the Contractor to reduce or discontinue the payment withholding from billings on interim cost vouchers under this contract, if the Contracting Officer determines that the Contractor has failed to correct the significant deficiencies identified in the Contractor's notification, the Contracting Officer will reinstate or increase withholding from progress payments and performance-based payments, and direct the Contractor, in writing, to reinstate or increase the percentage withheld on interim cost vouchers to the percentage initially withheld, until the Contracting Officer determines that the Contractor has corrected all significant deficiencies as directed by the Contracting Officer's final determination.

(End of clause) I.7 AMS 3.2.1.5-4 Continuity of Services - Mission Critical Contracts (January 2008)

(a) The contractor recognizes that the supplies and/or services under this contract are critical to FAA and must be continued without interruption during times of National Emergency or Incidents of National Significance. Supplies and/or services to be continued without interruption are:

[Description to be entered by Contracting Officer]

(b) National Emergencies or Incidents of National Significance include:

(1) Outbreak of pandemic influenza or infectious disease;

(2) Terrorist attack; and

(3) Natural disaster.

(c) Because the supplies and/or services under this SIR or contract are deemed critical by FAA, the contractor must make every reasonable effort to deliver these supplies and/or services per the contract requirements during times of National Emergency or Incidents of National Significance; however, the presence of this clause does not affect or diminish the Contractor's rights under Default or Termination clauses incorporated into this SIR or contract.

(d) Reserved.

(e) Reserved.

(f) The Continuity of Contract Performance Plan must be updated as needed.

(End of Clause) I.8 AMS 3.2.2.3-39 Requirements for Certified Cost or Pricing Data or Data Other Than Certified Cost or Pricing DataInformation -Modifications (July 2010January 2022)

(a) Request for exception from certified cost or pricing data requirements.

(1) In lieu of submitting certified cost or pricing data for modifications under this contract, on the date of the agreement on price or the date of the award, whichever is later, the Contractor may submit a written request for exception by submitting the information described in paragraphs (a)(1)(i) and (ii) of this clause. The Contracting Officer may require additional supporting information, but only to the extent necessary to determine whether an exception should be granted, and whether the price is fair and reasonable.

(i) Identification of the law or regulation establishing the price offered. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of the controlling document, unless it was previously submitted to the contracting office.

(ii) Information on modifications of contracts or subcontracts for commercial items.

(A) If—

(1) The original contract or subcontract was granted an exception from certified cost or pricing data requirements because the price agreed upon was based on adequate price competition or prices set by law or regulation, or was a contract or subcontract for the acquisition of a commercial item; and

(2) The modification (to the contract or subcontract) is not exempted based on one of these exceptions, then the Contractor may provide information to establish that the modification would not change the contract or subcontract from a contract or subcontract for the acquisition of a commercial item to a contract or subcontract for the acquisition of an item other than a commercial item.

(B) For a commercial item exception, the Contractor must provide, at a minimum, information on prices at which the same item or similar items have previously been sold that is adequate for evaluating the reasonableness of the price of the modification. Dependent upon the commercial items being catalog items, market-priced items, or items included on an active Federal Supply Service Multiple Award Schedule contract, the Contractor must include the corresponding information pursuant to that of which is described in paragraphs (a)(1)(B)(1); (a)(1)(B)(2) or (a)(1)(B)(3) of this clause:

(1) For catalog items, a copy of or identification of the catalog and its date, or the appropriate pages for the offered items, or a statement that the catalog is on file in the buying office to which the proposal is being submitted. Provide a copy or describe current discount policies and price lists (published or unpublished), e.g., wholesale, original equipment manufacturer, or reseller. Also explain the basis of each offered price and its relationship to the established catalog price, including how the proposed price relates to the price of recent sales in quantities similar to the proposed quantities.

(2) For market-priced items, the source and date or period of the market quotation or other basis for market price, the base amount, and applicable discounts. In addition, describe the nature of the market.

(3) For items included on an active Federal Supply Service Multiple Award Schedule contract, proof that an exception has been granted for the schedule item.

(2) The Contractor grants the Contracting Officer or an authorized representative the right to examine, at any time before award, books, records, documents, or other directly pertinent records to verify any request for an exception under this clause, and the reasonableness of price. For items priced using catalog or market prices, or law or regulation, access does not extend to cost or profit information or other data relevant solely to the Contractor’s determination of the prices to be offered in the catalog or marketplace.

(b) Requirements for certified cost or pricing data.

If the offeror is not granted an exception from the requirement to submit certified cost or pricing data, the following applies:

(1) The offeror must prepare and submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments in accordance with the information contained at AMS Guidance T3.2.3.G.1 “Instructions for Submitting Certified Cost/Price Proposals for Supplies, Services, or Construction,” which is incorporated by reference with the same force and effect as though it were inserted here in full text. The instructions in AMS T3.2.3.G.1 are incorporated as a mandatory format to be used in this contract.

(2) As soon as practicable after agreement on price, but before contract award (except for unpriced actions such as letter contracts), the offeror must submit a Certificate of Current Cost or Pricing Data that conforms to the instructions contained in the Appendix G1 to AMS Guidance T3.2.3, ‘Cost and Price Methodology."

(a) When there are price adjustments in the contract, the Contractor (you, your) must submit the following:

(1) A certificate of current cost or pricing data (CCCPD) described in paragraph (e), or

(2) For non-certified current cost or pricing data (CPD), a request for an exception to CCCPD. You must request this exception from the CO in writing with the following types of information or data that would establish the reasonableness of the prices you offer:

(i) Information on an exception you received on earlier or repetitive acquisitions;

(ii) Catalog price information including:

(A) A dated catalog with the prices;

(B) The applicable catalog pages; or

(C) A statement that the catalog is on file in the contracts office that will issue this contract modification;

(iii) Information on the current discount policies and price lists (published or unpublished), for example wholesale, original equipment manufacturer, and reseller;

(iv) Evidence of substantial sales to the general public for catalog items that exceed [Contracting Officer (CO) to insert extended value - not unit price]. Your evidence may consist of verifiable records such as a sales order, contract, shipment, invoice, actual recorded sales; or sales by your affiliates, other manufacturers or vendors when your price proposal is based on sales of essentially the same commercial item. You must also explain the relationship of the offered price to the (1) established catalog price, or (2) the price of recent and substantial sales of similar quantities of the items that were sold to the general public at prices that differ from catalog or list prices;

(v) The basis for the market price including:

(A) The source, date or period of the market quotation;

(B) Any other basis for the market price, the base amount, and applicable discounts;

(C) The nature of the market for the supply or service you are offering (should be the same as or similar to the market price supply or service); or

(D) Data supporting substantial sales to the general public.

(vi) Laws or regulations that establish your offered prices. If the price is controlled under law by periodic rulings, reviews, or similar actions of a governmental body, attach a copy of a controlling document that you did not previously submit to the contracting office;

(vii) Information on modifications of contracts or subcontracts for commercial items that relate to the offered price, as follows:

(A) If you received an exception based on adequate price competition, catalog or market prices of commercial items, or prices set by law or regulation under the original contract or subcontract, and this modification is not covered by these exceptions, you must provide information to establish that the modification would not change the contract or subcontract from one for a commercial item to one for a non-commercial item;

(B) For commercial items, you may provide information on selling prices of the same item or similar items in the commercial market; and

(viii) Any other information the CO requests to support your request for an exception or to conclude that your price is fair and reasonable.

(b) You give the CO the right to examine books, records, documents, or other directly pertinent records to verify your request for an exception under this clause or the reasonableness of price at any time before award.

(c) The CO will not require you to provide access to cost or price information or other data that apply to prices offered in the catalog or marketplace.

(d) Submitting information to qualify for an exception does not mean that this is the only exception that may apply.

(e) You must submit under paragraph (a):

CERTIFICATE OF CURRENT COST OR PRICING DATA

I certify that, to the best of my knowledge and belief, the cost or pricing data we submit, either actually or by specific identification in writing, to the Contracting Officer or to the Contracting Officer's representative to support [*] are accurate, complete, and current as of [**]. This certification includes the cost or pricing data supporting any advance agreements and forward pricing rate agreements between us and the Government that are part of the proposal.

[Contractor insert the following information.]

Firm _________________________________________

Signature ____________________________________

Name ________________________________________

Title ________________________________________

Date of execution [***___________________________]

*Contractor identify the proposal, request for price adjustment, or other submission involved, giving the appropriate identifying number (for example, SIR No.)

** Contractor insert the day, month, and year when price negotiations were concluded and price agreement was reached or, if applicable, an earlier date agreed upon between the parties that is as close as practicable to the date of a price agreement.

*** Contractor insert the day, month, and year of signing, which should be as close as practicable to the date when the price negotiations were concluded and the parties agreed on the contract price.

(End of certificate) (End of clause) I.9 AMS 3.2.4-5 Allowable Cost and Payment (October 2019)

(a) Invoicing. The Government will make payments to the Contractor when requested as work progresses, but (except for small business concerns) not more often than once every 2 weeks, in amounts determined to be allowable by the Contracting Officer in accordance with the Federal Aviation Administration's (FAA) "Contract Cost Principles" in effect on the date of this contract and the terms of this contract (upon request, the Contracting Officer will provide a copy of the FAA Contract Cost Principles). The Contractor may submit to an authorized representative of the Contracting Officer, in such form and reasonable detail as the representative may require, an invoice or voucher supported by a statement of the claimed allowable cost for performing this contract. Any payments for costs under this contract, particularly for costs of Indirect Rates under paragraph (d), must be subject to the provisions of the "Limitation of Costs" clause, or the "Limitation of Funds" clause, if applicable. The Contractor must be responsible to manage and control the allowable cost of performance of the contract, such that payments for any allowable costs, including Indirect Rates under paragraph (d), must not exceed the estimated cost set forth in the schedule, or the funded amount, less an allowance for fee, if the contract is incrementally funded.

(b) Reimbursing costs.

(1) For the purpose of reimbursing allowable costs (except as provided in subparagraph (2) below, with respect to pension, deferred profit sharing, and employee stock ownership plan contributions), the term costs includes only:

(i) Those costs the Contractor has incurred and recorded at the time of the request for reimbursement;

(ii) When the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid for-

(A) Materials issued from the Contractor's inventory and placed in the production process for use on the contract;

(B) Direct labor;

(C) Direct travel;

(D) Other direct in-house costs; and

(E) Properly allocable and allowable indirect costs, as shown in the records maintained by the Contractor for purposes of obtaining reimbursement under FAA contracts; and

(iii) The amount of payments that have been paid to the Contractor's subcontractors under similar cost standards.

(2) Contractor contributions to any pension or other post-retirement benefit, profit-sharing or employee stock ownership plan funds that are paid quarterly or more often may be included in indirect costs for payment purposes: Provided, that the Contractor pays the contribution to the fund within 30 days after the close of the period covered. Payments made 31 days or more after the close of a period must not be included until the Contractor actually makes the payment. Accrued costs for such contributions that are paid less often than quarterly must be excluded from indirect costs for payment purposes until the Contractor actually makes the payment.

(3) Notwithstanding the audit and adjustment of invoices or vouchers under paragraph (g) below, allowable indirect costs under this contract must be obtained by applying indirect cost rates established in accordance with paragraph (d) below.

(4) Any statements in specifications or other documents incorporated in this contract by reference designating performance of services or furnishing of materials at the Contractor's expense or at no cost to the Government will be disregarded for purposes of cost-reimbursement under this clause.

(c) Small business concerns. A small business concern may be paid more often than every 2 weeks and may invoice and be paid for recorded costs for items or services purchased directly for the contract, even though the concern has not yet paid for those items or services.

(d) Final indirect cost rates.

(1) Final annual indirect cost rates and the appropriate bases must be established for the period covered by the indirect cost rate proposal.

(2) The Contractor must, within 180 days after the expiration of each of its fiscal years, or by a later date approved by the Contracting Officer, submit to the cognizant Contracting Officer and to the cognizant audit activity proposed certified final indirect cost rates for that period and supporting cost data specifying the contract and/or subcontract to which the rates apply. The proposed rates must be based on the Contractor's actual cost experience for that period. The appropriate Government representative and Contractor will establish the final indirect cost rates as promptly as practical after receipt of the Contractor's proposal.

(i) An adequate indirect cost rate proposal must include the following data unless otherwise specified by the cognizant Contracting Officer:

(A) Summary of all claimed indirect expense rates, including pool, base, and calculated indirect rate.

(B) General and Administrative expenses (final indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Chart of Accounts).

(C) Overhead expenses (final indirect cost pool). Schedule claimed expenses by element of cost as identified in accounting records (Chart of Accounts) for each final indirect cost pool.

(D) Occupancy expenses (intermediate indirect cost pool). Schedule of claimed expenses by element of cost as identified in accounting records (Charts of Accounts) and expense reallocation to final indirect cost pools.

(E) Claimed allocation bases, by element of cost, used to distribute indirect costs.

(F) Facilities capital cost of money factors computation.

(G) Reconciliation of books of account (i.e., General Ledger) and claimed direct costs by major cost elements.

(H) Schedule of direct costs by contract and subcontract and indirect expense applied at claimed rates, as well as a subsidiary schedule of Government participation percentages in each of the allocation base amounts.

(I) Schedule of cumulative direct and indirect costs claimed and billed by contract and subcontract.

(J) Subcontract information. Listing of subcontracts awarded to companies for which the contractor is the prime or upper-tier contractor (include prime and subcontract numbers; subcontract value and award type; amount claimed during the fiscal year; and the subcontractor name, address, and point of contract information).

(K) Summary of each time-and-materials and labor-hour contract information, including labor categories, labor rates, hours, and amounts; direct materials; other direct costs; and, indirect expense applied at claimed rates.

(L) Reconciliation of total payroll per IRS form 941 to total labor costs distribution.

(M) Listing of decisions/agreements/approvals and description of accounting/organizational changes.

(N) Certificate of final indirect cost.

(O) Contract closing information for contracts physically completed in this fiscal year (include contract number, period of performance, contract ceiling amounts, contract fee computations, level of effort, and indicate if the contract is ready to close).

(3) The Contractor and the appropriate Government representative will execute a written understanding setting forth the final indirect cost rates. The understanding will specify (i) the agreed-upon final annual indirect cost rates, (ii) the bases to which the rates apply, (iii) the periods for which the rates apply, (iv) any specific indirect cost items treated as direct costs in the settlement, and (v) the affected contract and/or subcontract, identifying any with advance agreements or special terms and the applicable rates. The understanding will not change any monetary ceiling, contract obligation, or specific cost allowance or disallowance provided for in this contract. The understanding is incorporated into this contract upon execution.

(4) After final annual direct cost rates are established for specific period, the contractor must update the billings on all contracts to reflect the final settled rates and update the schedule of cumulative direct and indirect costs claimed and billed as required by paragraph d(2)(i)(l) of this clause.

(5) Failure by the parties to agree on a final annual indirect cost rate may be the basis of a claim under the "Contract Disputes" clause.

(e) Billing rates. Until final annual indirect cost rates are established for any period, the Government will reimburse the Contractor at billing rates established by the Contracting Officer or by an authorized representative (the cognizant auditor), subject to adjustment when the final rates are established. These billing rates-

(1) Must be the anticipated final rates; and

(2) May be prospectively or retroactively revised by mutual agreement, at either party's request, to prevent substantial overpayment or underpayment.

(f) Quick-close-out procedures. When the Contractor and Contracting Officer agree, the quick-close-out procedures may be used.

(1) Procedures. Settlement of indirect cost rates must apply to this contract, in advance of the determination of final indirect cost rates, if:

(i) The contract is physically complete;

(ii) The amount of unsettled indirect cost to be allocated to this contract is not more than $5,000,000 and the cumulative unsettled indirect costs to be allocated to one or more contracts in a single fiscal year do not exceed 15 percent of the estimated, total unsettled indirect costs allocable to cost-type contracts for that fiscal year; and

(iii) Agreement can be reached on a reasonable estimate of allocable dollars.

(2) The settlement must be final for this contract and no adjustment will be made to other contracts for over- or under-recoveries of costs allocated or allocable to this contract.

(3) The settlement will not be considered a binding precedent when establishing the final indirect costs for other contracts.

(4) These procedures may also be used for the settlement of direct and indirect costs for individual task and delivery orders.

(g) Audit. At any time or times before final payment, the Contracting Officer may have the Contractor's invoices or vouchers and statements of cost audited. Any payment may be (1) reduced by amounts found by the Contracting Officer not to constitute allowable costs or (2) adjusted for prior overpayments or underpayments.

(h) Final payment.

(1) The Contractor must submit a completion invoice or voucher, designated as such, promptly upon completion of the work, but no later than 120 days (or longer, as the Contracting Officer may approve in writing) after settlement of final annual indirect rates for all years. Upon approval of that invoice or voucher, and upon the Contractor's compliance with all terms of this contract, the Government will promptly pay any balance of allowable costs and that part of the fee (if any) not previously paid.

(2) The Contractor must pay to the Government any refunds, rebates, credits, or other amounts (including interest, if any) accruing to or received by the Contractor or any assignee under this contract, to the extent that those amounts are properly allocable to costs for which the Contractor has been reimbursed by the Government. Reasonable expenses incurred by the Contractor for securing refunds, rebates, credits, or other amounts will be allowable costs if approved by the Contracting Officer. Before final payment under this contract, the Contractor and each assignee whose assignment is in effect at the time of final payment must execute and deliver-

(i) An assignment to the Government, in form and substance satisfactory to the Contracting Officer, of refunds, rebates, credits, or other amounts (including interest, if any) properly allocable to costs for which the Contractor has been reimbursed by the Government under this contract; and

(ii) A release discharging the Government, its officers, agents, and employees from all liabilities, obligations, and claims arising out of or under this contract, except-

(A) Specified claims stated in exact amounts, or in estimated amounts when the exact amounts are not known;

(B) Claims (including reasonable incidental expenses) based upon liabilities of the Contractor to third parties arising out of the performance of this contract; provided, that the claims are not known to the Contractor on the date of the execution of the release, and that the Contractor gives notice of the claims in writing to the Contracting Officer within 6 years following the release date or notice of final payment date, whichever is earlier; and

(C) Claims for reimbursement of costs, including reasonable incidental expenses, incurred by the Contractor under the patent clauses of this contract, excluding, however, any expenses arising from the Contractor's indemnification of the Government against patent liability.

(End of clause) I.10 AMS 3.2.4-16 Ordering (October 2019)

(a) Any supplies and services to be furnished under this contract must be ordered by issuance of delivery orders or task orders by the individuals or activities designated in the contract. Such orders may be issued from ________ through ________ [CO to insert dates].

(b) All delivery orders or task orders are subject to the terms and conditions of this contract. In the event of conflict between a delivery order or task order and this contract, the contract must control.

(c) If mailed, a delivery order or task order is considered "issued" when the Government deposits the order in the mail. Orders issued by facsimile, email or other electronic commerce methods are considered "issued" when the Government sends the order. Orders may be issued orally only if authorized in the contract.

(End of clause) I.11 AMS 3.2.4-17 Order Limitations (October 2019)

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than ______ [insert dollar figure or quantity], the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of ______ [insert dollar figure or quantity];

(2) Any order for a combination of items in excess of ______ [insert dollar figure or quantity]; or

(3) A series of orders from the same ordering office within _____ days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.

(c) If this is a requirements contract, the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.

(d) Notwithstanding paragraphs (b) and (c) above, the Contractor must honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within _____ days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(End of clause) I.12 AMS 3.2.4-20 Indefinite Quantity (October 2019)

(a) This is an indefinite-quantity contract for the supplies or services specified, and effective for the period stated, in the Schedule. The quantities of supplies and services specified in the Schedule are estimates only and are not purchased by this contract.

(b) Delivery or performance must be made only as authorized by orders issued in accordance with the "Ordering" clause. The Contractor must furnish to the Government, when and if ordered, the supplies or services specified in the Schedule up to and including the quantity designated in the Schedule as the maximum. The Government will order at least the quantity of supplies or services designated in the Schedule as the minimum.

(c) Except for any limitations on quantities in the "Order Limitations" clause or in the Schedule, there is no limit on the number of orders that may be issued. The Government may issue orders requiring delivery to multiple destinations or performance at multiple locations.

(d) Any order issued during the effective period of this contract and not completed within that period must be completed by the Contractor within the time specified in the order. The contract must govern the Contractor's and Government's rights and obligations with respect to that order to the same extent as if the order were completed during the contract's effective period; provided, that the Contractor must not be required to make any deliveries under this contract after ______ [insert date].

(End of clause) I.13 AMS 3.2.4-34 Option to Extend Services (October 2019) The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder must not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the period specified in the Schedule.

(End of clause) I.14 AMS 3.2.4-35 Option to Extend the Term of the Contract (July 2021)

(a) The Government may extend the term of this contract by written notice (contract modification) to the Contractor prior to the expiration of the current period of performance provided, that the Government will give the Contractor a preliminary written notice of its intent to extend at least_______________ days [60 days unless a different number of days is inserted] before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract must be considered to include this option provision.

(c) The total duration of this contract, including the exercise of any options under this clause, must not exceed ___ (months) ____ (years).

(End of clause) I.15 AMS 3.3.1-33 System for Award Management (July 2018October 2021)

(a) Definitions. As used in this clause "Data Universal Numbering System (DUNS) number" means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

"Data Universal Numbering System +4 (DUNS+4) number" means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .