Exhibit_J.1_-_PRICE_PROPOSAL_WORKSHEET.XLS
XLS spreadsheet 38 KB Posted
- Attached to
- Research & Technical Support for Infrastructure Laboratories Federal contract opportunity
- Solicitation number
- 693JJ318R000015
About this file
This document contains a price proposal template and information on a federal contract opportunity for research and technical support services for infrastructure laboratories. The price proposal template includes various labor categories and experience levels for personnel such as research engineers, technicians, and subject matter experts, to be priced over a five year contract period. The related federal contract opportunity is a small business set-aside to provide staffing and technical support across four laboratories focused on structures, non-destructive evaluation, hydraulics, and geotechnics. The work will support research programs and projects of the Federal Highway Administration to address critical highway infrastructure needs. The pre-proposal conference is scheduled for February 13, 2019 and the final solicitation will be available on or around February 15, 2019, with proposals to be evaluated on technical capabilities, past performance, and price using best value determination. The period of performance is anticipated to be 60 months.
Exhibit J.1 - PRICE PROPOSAL WORKSHEET
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Revised_Request_for_Proposals_-_693JJ318R000015.pdf | ||
| 693JJ318R000015_-_Question_and_Answers.pdf | ||
| Infrastructure_R&D_Overview_-_Pre-Proposal_Conference_Presentation.pdf | ||
| Request_for_Proposals_-_693JJ318R000015.pdf | ||
| Exhibit_J.1_-_PRICE_PROPOSAL_WORKSHEET.XLS | XLS spreadsheet | |
| Exhibit_J.3_FHWA_Pre-Proposal_Conference.pdf | ||
| Exhibit_J.2_-_STANDARD_FORM_LLL,_DISCLOSURE_OF_LOBBYING_ACTIVITIES.PDF | ||
| Draft_693JJ318R000015_-_Request_for_Proposals_Draft.pdf | ||
| Exhibit_J.3_FHWA_Pre-Proposal_Conference.pdf | ||
| Exhibit_J.2_-_STANDARD_FORM_LLL,_DISCLOSURE_OF_LOBBYING_ACTIVITIES.PDF | ||
| Exhibit_J.1_-_PRICE_PROPOSAL_WORKSHEET.XLS | XLS spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule 1
| Labor Category | Year 1 | Year 1 | Year 2 | Year 2 | Year 3 | Year 3 | Year 4 | Year 4 | Year 5 | Year 5 |
| Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | Direct Labor | |
| On-Site | Off-Site | On-Site | Off-Site | On-Site | Off-Site | On-Site | Off-Site | On-Site | On-Site | |
| Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | Rate/Hr | |
| Onsite Program Manager (PM) | N/A | N/A | N/A | N/A | N/A | |||||
| Laboratory Manager | N/A | N/A | N/A | N/A | N/A | |||||
| Metals Research Engineer (MRE) Level 1 | ||||||||||
| Metals Research Engineer (MRE) Level 2 | ||||||||||
| Metals Research Engineer (MRE) Level 3 | ||||||||||
| Metals Research Engineer (MRE) Level 4 | ||||||||||
| Metals Research Engineer (MRE) Level 5 | ||||||||||
| Concrete Research Engineer (CRE) level 1 | ||||||||||
| Concrete Research Engineer (CRE) level 2 | ||||||||||
| Concrete Research Engineer (CRE) level 3 | ||||||||||
| Concrete Research Engineer (CRE) level 4 | ||||||||||
| Concrete Research Engineer (CRE) level 5 | ||||||||||
| Mechatronic Research Engineer (MTRE) Level 1 | ||||||||||
| Mechatronic Research Engineer (MTRE) Level 2 | ||||||||||
| Support Analyst (SA) Level 1 | ||||||||||
| Support Analyst (SA) Level 2 | ||||||||||
| Support Analyst (SA) Level 3 | ||||||||||
| Expert Technician (ET) Level 1 | ||||||||||
| Expert Technician (ET) Level 2 | ||||||||||
| Expert Technician (ET) Level 3 | ||||||||||
| Expert Technician (ET) Level 4 | ||||||||||
| Structures Research Technician (STR-RT) Level 1 | ||||||||||
| Structures Research Technician (STR-RT) Level 2 | ||||||||||
| Structures Subject Matter Expert (STR-SME) Level 1 | ||||||||||
| Structures Subject Matter Expert (STR-SME) Level 2 | ||||||||||
| Structures Subject Matter Expert (STR-SME) Level 3 | ||||||||||
| Structures Subject Matter Expert (STR-SME) Level 4 | ||||||||||
| Structures Subject Matter Expert (STR-SME) Level 5 | ||||||||||
| Document Processor (DP) | ||||||||||
| Administrative Assistant (AA) | ||||||||||
| Data Analyst (DA) | ||||||||||
| NDE Research Engineer (NDE-RE) Level 1 | ||||||||||
| NDE Research Engineer (NDE-RE) Level 2 | ||||||||||
| NDE Research Engineer (NDE-RE) Level 3 | ||||||||||
| NDE Research Engineer (NDE-RE) Level 4 | ||||||||||
| NDE Research Engineer (NDE-RE) Level 5 | ||||||||||
| NDE Research Technician (NDE-RT) | ||||||||||
| NDE Subject Matter Expert (NDE-SME) Level 1 | ||||||||||
| NDE Subject Matter Expert (NDE-SME) Level 2 | ||||||||||
| NDE Subject Matter Expert (NDE-SME) Level 3 | ||||||||||
| NDE Subject Matter Expert (NDE-SME) Level 4 | ||||||||||
| NDE Subject Matter Expert (NDE-SME) Level 5 | ||||||||||
| NDE Research Specialist (NDE-RS) | ||||||||||
| Geotechnical Research Engineer (GT-RE) Level 1 | ||||||||||
| Geotechnical Research Engineer (GT-RE) Level 2 | ||||||||||
| Geotechnical Research Engineer (GT-RE) Level 3 | ||||||||||
| Geotechnical Research Engineer (GT-RE) Level 4 | ||||||||||
| Geotechnical Research Engineer (GT-RE) Level 5 | ||||||||||
| Geotechnical Research Technician (GT-RT) Level 1 | ||||||||||
| Geotechnical Research Technician (GT-RT) Level 2 | ||||||||||
| Geotechnical Research Technician (GT-RT) Level 3 | ||||||||||
| Geotechnical Subject Matter Expert (GT-SME) Level 1 | ||||||||||
| Geotechnical Subject Matter Expert (GT-SME) Level 2 | ||||||||||
| Geotechnical Subject Matter Expert (GT-SME) Level 3 | ||||||||||
| Geotechnical Subject Matter Expert (GT-SME) Level 4 | ||||||||||
| Geotechnical Subject Matter Expert (GT-SME) Level 5 | ||||||||||
| General Labor (GL) Level 1 | ||||||||||
| General Labor (GL) Level 2 | ||||||||||
| General Labor (GL) Level 3 | ||||||||||
| Hydraulics Research Specialist (HYD-RS) | ||||||||||
| Hydraulics Research Engineer (HYD-RE) Level 1 | ||||||||||
| Hydraulics Research Engineer (HYD-RE) Level 2 | ||||||||||
| Hydraulics Research Engineer (HYD-RE) Level 3 | ||||||||||
| Hydraulics Research Engineer (HYD-RE) Level 4 | ||||||||||
| Hydraulics Research Engineer (HYD-RE) Level 5 | ||||||||||
| Hydraulics Research Technician (RT) Level 1 | ||||||||||
| Hydraulics Research Technician (RT) Level 2 | ||||||||||
| Hydraulics Research Technician (RT) Level 3 | ||||||||||
| Hydraulics Subject Matter Expert (SME) Level 1 | ||||||||||
| Hydraulics Subject Matter Expert (SME) Level 2 | ||||||||||
| Hydraulics Subject Matter Expert (SME) Level 3 | ||||||||||
| Hydraulics Subject Matter Expert (SME) Level 4 | ||||||||||
| Hydraulics Subject Matter Expert (SME) Level 5 | ||||||||||
| Machinist (M) Level 1 | ||||||||||
| Machinist (M) Level 2 | ||||||||||
| ODC/Travel | $1,228,500.00 | $1,228,500.00 | $1,228,500.00 | $1,228,500.00 | $1,228,500.00 | |||||
| The Contractor shall modify the Price Proposal Template as needed to provided the required information. | ||||||||||
| ODCs shall be reimbursed at cost. |
&CExhibit J.1 COST/PRICE PROPOSAL WORKSHEET &L&"Times New Roman,Regular"&A
File details come from the government source that posted it. Updated .