Lay Berthing Services for Long-Term Safe Lay Berth for Watson LMSR Vessels
Solicitation number
693JF726R000009
Issued by

About this file

Summary

This is a Request for Proposals (RFP) for exclusive long-term lay berthing services for up to two Watson Class LMSR RRF vessels on the U.S. West Coast. The Maritime Administration (MARAD) seeks a 5-year Indefinite Delivery/Indefinite Quantity (IDIQ) contract, fixed-price with cost-reimbursement components, to be awarded to the Lowest Price Technically Acceptable (LPTA) offeror. Proposals are due by 1:00 PM ET on a specified date (form SF-1449), with anticipated contract start of April 15, 2026. The contract includes a base 5-year period plus four optional 1-year extensions, potentially extending through April 14, 2031. Liquidated damages of $14,454 per calendar day of delay plus $44,984 per incident apply for non-performance. The solicitation number is 693JF726R000009, issued by MARAD's Office of Acquisition (MAR-380) in Washington DC, with points of contact Ken Egbuna (Contracting Officer), Felicia Eberling, and Henry Puppe.

The contractor must provide exclusive berthing with comprehensive facility requirements including heavy weather mooring per UFC 4-159-03 standards (130 mph sustained wind), water depth minimum of 4 feet greater than vessel draft, resilient fendering, pier apron support for 425 PSF loads and HS-20-44 trucks, security fencing and surveillance systems, 24/7 security guard coverage with access control, parking for 20 vehicles per vessel, accommodation ladder platforms, electrical service (6 x 400-ampere circuits), potable water (200,000 GPD minimum), sewage collection, telephone/data infrastructure, and garbage/recycling services. The contractor must secure all required permits and comply with USCG Captain of the Port requirements, maintain oil spill response plans, and provide proof of legal facility ownership/lease. Reimbursable costs include electrical power consumption, water/sewage usage, connect/disconnect services, and specialized waste removal. The contractor must submit a draft heavy weather mooring plan within 14 days of award and a final approved plan 14 days before contract start, along with multi-beam echo soundings, engineering certifications, facility drawings, security plans, and insurance evidence ($5 million minimum coverage for general liability, wharfingers liability, and pollution exposure). Award is contingent on technical acceptability of the proposed mooring plan, facility infrastructure, water depth certification, port services availability, and proof of insurance and facility rights.

View the file

Other files

File Type Posted
RFP 693JF726R000009 QA.docx DOCX document
Q and A MARAD Layberthing Requirements for LMSR Class Vessels.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUMIS CHECKED

CODE 18a. PAYMENT WILL BE MADE BY

CODE

FACILITYCODE

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

OFFEROR

693JF7

See Schedule

MARAD-00091-MAR-610 CODE 16. ADMINISTERED BYCODE

X

X

488390

SIZE STANDARD:

% FOR:SET ASIDE:UNRESTRICTED OR693JF7

REQUEST FOR

PROPOSAL

(RFP)

INVITATION

FOR BID (IFB)

10. THIS ACQUISITION ISCODE

REQUEST FOR

QUOTE (RFQ)

14. METHOD OF SOLICITATION

13b. RATING

NORTH AMERICAN INDUSTRY

CLASSIFICATION STANDARD

(NAICS):

SMALL BUSINESS

1700 ET202-493-8977HENRY PUPPE

(No collect calls)

INFORMATION CALL:

FOR SOLICITATION 8. OFFER DUE DATE/LOCAL TIMEb. TELEPHONE NUMBERa. NAME

4. ORDER NUMBER3. AWARD/ 6. SOLICITATION

693JF726R000009

5. SOLICITATION NUMBER

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS 1. REQUISITION NUMBER PAGE OF

1 62 OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

TELEPHONE NO.

17a. CONTRACTOR/

See Schedule

15. DELIVER TO

WASHINGTON DC 20590-0001

MAIL STOP W-28-201

1200 NEW JERSEY AVENUE SE

OFFICE OF ACQUISITION MAR-380

9. ISSUED BY

7.

2. CONTRACT NO.

EFFECTIVE DATE

$47

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW

ISSUE DATE

DELIVERY FOR FREE ON BOARD

(FOB) DESTINATION UNLESS

BLOCK IS MARKED

11.

SEE SCHEDULEX

12. DISCOUNT TERMS THIS CONTRACT IS A RATED

ORDER UNDER THE DEFENSE

PRIORITIES AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

13a.

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

8(A)

US DOT MARITIME ADMINISTRATION

WOMEN-OWNED SMALL

BUSINESS (WOSB)

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

ADMINISTERED BY:

US DOT MARITIME ADMINISTRATION

OFFICE OF ACQUISITION MAR-380

1200 NEW JERSEY AVENUE SE

MAIL STOP W-28-201

WASHINGTON DC 20590-0001 USA

DELIVER TO:

US DOTMARITIME ADMINISTRATION

OFFICE OF SHIP OPERATIONS

1200 NEW JERSEY AVENUE SE

Continued ...

(Use Reverse and/or Attach Additional Sheets as Necessary)

HEREIN, IS ACCEPTED AS TO ITEMS:

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER

ARE

ARE

31c. DATE SIGNED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or print)

Ken Egbuna

ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL

SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

26. TOTAL AWARD AMOUNT (For Government Use Only)

OFFER

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

ARE NOT ATTACHED.

ARE NOT ATTACHED.

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

30b. NAME AND TITLE OF SIGNER (Type or print)

30a. SIGNATURE OF OFFEROR/CONTRACTOR

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

25. ACCOUNTING AND APPROPRIATION DATA

29. AWARD OF CONTRACT: REFERENCE

3/51

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32c. DATE 32b. SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

40. PAID BY39. S/R VOUCHER NUMBER38. S/R ACCOUNT NUMBER

37. CHECK NUMBER

FINALPARTIAL

36. PAYMENT

FINALPARTIAL

35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER33. SHIP NUMBER

COMPLETE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

42d. TOTAL CONTAINERS42c. DATE REC'D (YY/MM/DD)

42b. RECEIVED AT (Location)

42a. RECEIVED BY (Print)

41c. DATE41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

STANDARD FORM 1449 (REV. 11/2021) BACK

24.

AMOUNT

23.

UNIT PRICE

22.

UNIT

21.

QUANTITY

20.

SCHEDULE OF SUPPLIES/SERVICES

19.

ITEM NO.

00001

00002

00003

00004

00005

00006

MAR-610

WASHINGTON DC 20590-0001 USA

Period of Performance: 04/15/2026 to 04/14/2027

Base Year 5-yr WATKINS West Coast

Period of Performance: 04/15/2026 to 04/14/2027

Berthage - Per Diem

Period of Performance: 04/15/2026 to 04/14/2027

Security

Period of Performance: 04/15/2026 to 04/14/2027

Connect Cycle

Period of Performance: 04/15/2026 to 04/14/2027

Disconnect Cycle

Period of Performance: 04/15/2026 to 04/14/2027

Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Continued ...

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

62 2 of 3/52

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

Period of Performance: 04/15/2026 to 04/14/2027

00007 Water and Sewage Services

Period of Performance: 04/15/2026 to 04/14/2027

00008 Opt 1 Year 5-yr WATKINS West Coast

Period of Performance: 04/15/2027 to 04/14/2028

00009 Berthage - Per Diem

Period of Performance: 04/15/2027 to 04/14/2028

00010 Security

Period of Performance: 04/15/2027 to 04/14/2028

00011 Connect Cycle

Period of Performance: 04/15/2027 to 04/14/2028

00012 Disconnect Cycle

Period of Performance: 04/15/2027 to 04/14/2028

00013 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2027 to 04/14/2028

00014 Water and Sewage Services

Period of Performance: 04/15/2027 to 04/14/2028

00015 Opt 2 Year 5-yr WATKINS West Coast

Period of Performance: 04/15/2028 to 04/14/2029

00016 Berthage - Per Diem

Period of Performance: 04/15/2028 to 04/14/2029

00017 Security

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/53

4 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

Period of Performance: 04/15/2028 to 04/14/2029

00018 Connect Cycle

Period of Performance: 04/15/2028 to 04/14/2029

00019 Disconnect Cycle

Period of Performance: 04/15/2028 to 04/14/2029

00020 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2028 to 04/14/2029

00021 Water and Sewage Services

Period of Performance: 04/15/2028 to 04/14/2029

00022 Opt 3 Year 5-yr WATKINS West Coast

Period of Performance: 04/15/2029 to 04/14/2030

00023 Berthage - Per Diem

Period of Performance: 04/15/2029 to 04/14/2030

00024 Security

Period of Performance: 04/15/2029 to 04/14/2030

00025 Connect Cycle

Period of Performance: 04/15/2029 to 04/14/2030

00026 Disconnect Cycle

Period of Performance: 04/15/2029 to 04/14/2030

00027 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2029 to 04/14/2030

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/54

5 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

00028 Water and Sewage Services

Period of Performance: 04/15/2029 to 04/14/2030

00029 Opt 4 Year 5-yr WATKINS West Coast

Period of Performance: 04/15/2030 to 04/14/2031

00030 Berthage - Per Diem

Period of Performance: 04/15/2030 to 04/14/2031

00031 Security

Period of Performance: 04/15/2030 to 04/14/2031

00032 Connect Cycle

Period of Performance: 04/15/2030 to 04/14/2031

00033 Disconnect Cycle

Period of Performance: 04/15/2030 to 04/14/2031

00034 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2030 to 04/14/2031

00035 Water and Sewage Services

Period of Performance: 04/15/2030 to 04/14/2031

00071 Cumulative 5-year total for WATKINS West Coast

00072 Base Year 5-yr RED CLOUD West Coast

Period of Performance: 04/15/2026 to 04/14/2027

00073 Berthage - Per Diem

Period of Performance: 04/15/2026 to 04/14/2027

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/55

6 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

00074 Security

Period of Performance: 04/15/2026 to 04/14/2027

00075 Connect Cycle

Period of Performance: 04/15/2026 to 04/14/2027

00076 Disconnect Cycle

Period of Performance: 04/15/2026 to 04/14/2027

00077 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2026 to 04/14/2027

00078 Water and Sewage Services

Period of Performance: 04/15/2026 to 04/14/2027

00079 Opt 1 Year 5-yr RED CLOUD West Coast

Period of Performance: 04/15/2027 to 04/14/2028

00080 Berthage - Per Diem

Period of Performance: 04/15/2027 to 04/14/2028

00081 Security

Period of Performance: 04/15/2027 to 04/14/2028

00082 Connect Cycle

Period of Performance: 04/15/2027 to 04/14/2028

00083 Disconnect Cycle

Period of Performance: 04/15/2027 to 04/14/2028

00084 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/56

7 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

Period of Performance: 04/15/2027 to 04/14/2028

00085 Water and Sewage Services

Period of Performance: 04/15/2027 to 04/14/2028

00086 Opt 2 Year 5-yr RED CLOUD West Coast

Period of Performance: 04/15/2028 to 04/14/2029

00087 Berthage - Per Diem

Period of Performance: 04/15/2028 to 04/14/2029

00088 Security

Period of Performance: 04/15/2028 to 04/14/2029

00089 Connect Cycle

Period of Performance: 04/15/2028 to 04/14/2029

00090 Disconnect Cycle

Period of Performance: 04/15/2028 to 04/14/2029

00091 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2028 to 04/14/2029

00092 Water and Sewage Services

Period of Performance: 04/15/2028 to 04/14/2029

00093 Opt 3 Year 5-yr RED CLOUD West Coast

Period of Performance: 04/15/2029 to 04/14/2030

00094 Berthage - Per Diem

Period of Performance: 04/15/2029 to 04/14/2030

00095 Security

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/57

8 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

Period of Performance: 04/15/2029 to 04/14/2030

00096 Connect Cycle

Period of Performance: 04/15/2029 to 04/14/2030

00097 Disconnect Cycle

Period of Performance: 04/15/2029 to 04/14/2030

00098 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Period of Performance: 04/15/2029 to 04/14/2030

00099 Water and Sewage Services

Period of Performance: 04/15/2029 to 04/14/2030

00100 Opt 4 Year 5-yr RED CLOUD West Coast

Period of Performance: 04/15/2030 to 04/14/2031

00101 Berthage - Per Diem

Period of Performance: 04/15/2030 to 04/14/2031

00102 Security

Period of Performance: 04/15/2030 to 04/14/2031

00103 Connect Cycle

Period of Performance: 04/15/2030 to 04/14/2031

00104 Disconnect Cycle

Period of Performance: 04/15/2030 to 04/14/2031

00105 Electrical Service - Reimbursable electrical power usage. Utility company _____exempts _____ will not exempt taxes from electric service charges (check one)

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/58

9 62

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

693JF726R000009

Period of Performance: 04/15/2030 to 04/14/2031

00106 Water and Sewage Services

Period of Performance: 04/15/2030 to 04/14/2031

00142 Cumulative 5-year total for RED CLOUD West Coast

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

3/59

SECTION B - SUPPLIES / SERVICES AND PRICE

2.1 Requirement Summary: The Contractor shall provide exclusive long‑term lay berthing for up to two Watson class LMSR RRF vessels on the U.S. West Coast.

Government may substitute vessels of similar size or smaller.

2.2 CLINs & Pricing (Fill in CLIN table in Attachment SF-1449):

See solicitation form for a complete list of CLINS.

2.3 Per‑diem Includes: All items in SOW Section C and H.4 unless explicitly noted as reimbursable in Section C‑14.

2.4 The resulting contract will be a 5- year IDIQ, fixed-price/ cost-reimbursement, award.

2.5 Per-diem rates shall include all costs associated with meeting section C except those listed as reimbursables in section C-14.

2.6 Offerors shall provide pricing for all FFP CLINS to be eligible for award for either the 5-year periods.

2.7 All proposals shall be for a 5-year period.

2.8 The government reserves the right to substitute vessels for a similar size or smaller at any point in the solicitation, and thereafter.

2.9 MARAD reserves the right to procure berthing for either one, or two vessels under this solicitation.

SECTION C – Statement of Work

C-1 INTRODUCTION AND BACKGROUND

The Maritime Administration (MARAD) requires services for the exclusive long-term safe layberthing for up to two (2) WATSON CLASS LMSR RRF vessels, TRAVIS E WATKINS and MITCHELL RED CLOUD on the U.S. West Coast. Although the layberths are intended for the vessels identified in this solicitation, the Government may substitute vessels of a similar size or smaller.

C-2 DEFINITIONS

Alternative Mooring Arrangement: A mooring plan that uses a combination of fixed berthing structures and anchors to moor vessels to meet the heavy weather mooring standard.

Apron: An area adjacent to and extending the length of the berth used for

3/510 vehicle passage, material staging, parking of vehicles engaged in maintenance, repair, delivery of parts, etc.

Berth: Any designated place where a vessel is secured including the dock and slip, usually indicated by a code or name.

Contract Award Date: Designated in accordance with the contract provision "Period of Performance" found in Section F.

Contract Start Date: The date the berth must meet the contract's requirement. It is 120 days after the Contract Award Date unless the parties agree to an earlier date.

Dock: The structure located within the layberth facility having the mooring hardware for vessels, synonymous with pier and wharf.

Dock Face: The exposed outward structural components of the pier or wharf that bears the vertical load of the structure and transfers the lateral load from the fenders to the structure.

Full-service port complex: A port area with maritime services available, including but not limited to ship repair facilities, availability of around the clock pilotage, bunker supply and delivery services, and ship assist tugs as specified in section C-6(A).

Heavy Weather Mooring Plan: An analysis consisting of drawings and mooring calculations that combines vessel characteristics, existing or additional mooring points, effects of wind direction, wind speed, tides and currents proving that the vessel(s) can be safely moored permanently at the proposed layberth up to the maximum weather and wind conditions specified for the layberth geographical area.

Layberth: A berth used by a vessel for an extended period of time. This term includes the pier and water areas immediately surrounding the ship(s). It includes the fenders, and mooring points (buoys, bitts, bollards, etc.).

Layberth Facility: The layberth, plus the pier apron, the parking area, the guard shack, the perimeter barrier, and the security camera

Non-resilient fenders: Structures with an outer layer of High Impact Ultra High Molecular Weight (UHMW) instead of elastic material (rubber or plastics) placed along the pier face to cushion the vessel and prevent hull-plating damage.

Ramp: The primary vehicular access way onto a RO/RO vessel that is characterized by the location of entry (stern ramp/side-port ramp).

Ship Manager/General Agent: The MARAD contractor for a designated group of MARAD vessels that is responsible for ship operation, maintenance, and activation readiness.

Vertical live loads: These are items moving or being caused to move over the dock.

Water level: The height of water above or below the datum reference point as predicted by local tide tables and affected by seasonal flooding or drought.

Working Area: The area of a dock adjacent to vessel to be used for deliveries, staging gear, and vehicle access.

C-3 STATUS OF VESSELS

(A) RRF vessels will normally be maintained in an idle status and will remain at the layberth site in all weather conditions, except to participate in a military exercise/operation, to conduct some repairs, or comply with periodic regulatory requirements. Ship activations and dock trials are expected to be conducted at the layberth.

(B) RRF vessels may have a reduced operating status (ROS) crew onboard. ROS is an operating status, which involves most systems not directly required to support the onboard crew being in an idle condition. An ROS crew of approximately 10 personnel will be assigned to each ship and will live aboard.

(C) The vessel(s) are expected to remain at the layberth in all weather conditions up to the maximum rating of the heavy weather mooring plan required by this contract.

(D) Engineering plants will be idle except for periodic preventive maintenance, dock trials, and other required readiness tests.

(E) The shipboard fire-fighting system may be inoperable.

(F) All deck and cargo handling equipment will be operational and periodically in use, including side port platforms.

(G) The cathodic protection systems will be energized.

(H) Mooring equipment will be de-energized. The constant tension feature of mooring winches will not be in use. Mooring lines and wires will be provided by the Government or the Government's Ship Manager/General Agent for each vessel.

(A) The vessels may or may not be able to get underway.

(B) The vessels may be used for cargo handling training and for other training purposes.

(C) Interior house and engineering spaces may be dehumidified with ship's equipment.

3/512

(D) Ships shall be boomed or have booms available for deployment at all times. In circumstances where prevailing currents, tides, or vessel traffic preclude having booms continuously in place, the containment booms should be kept in readily deployable locations such as onboard or adjacent to the vessel.

C-4 BERTH REQUIREMENTS AND THE CONTRACTOR’S OBLIGATIONS

(A) The Contractor’s Obligations. The layberth Contractor shall bear all costs associated with obtaining and maintaining an acceptable safe layberth except as specifically identified. Some items are identified for emphasis only. An acceptable safe layberth shall meet the following minimum criteria and technical features.

(B) Plan of Action and Milestones. If the facility proposed by the Contractor requires site improvements, the Contractor shall provide a plan of action and milestones listing the key events in the facility improvement process from the time of award to the designated completion date of the facility. During periods of facility improvement, an updated POA&M shall be submitted monthly to the Contracting Officer’s Representative.

(C) Permits/Licenses/Leases. The Contractor is responsible for acquiring and maintaining the currency of all permits, licenses, and leases necessary to operate the layberth facility for the duration of the contract. Thirty (30) days after contract award the Contractor shall provide copies of any required permits, licenses, and leases to the Contracting Officer and the COR.

(B) NEPA requirements. The offeror shall include a detailed scope of work for any facility modifications, renovations, and/or construction related to layberthing MARAD ships. This includes both landside and in-water work. MARAD will determine the anticipated National Environmental Policy Act (NEPA) level of review for the project:

Categorical Exclusion, Environmental Assessment/Finding of No Significant Impact, or Environmental Impact Statement/Record of Decision. The successful offeror will be responsible for the completion of MARAD’s NEPA documentation, in collaboration with MARAD’s NEPA Coordinator in the Office of Environmental Compliance, prior to execution of the contract award. The offeror should demonstrate receipt (or reasonably anticipated receipt) of all environmental permits and approvals necessary for the above-mentioned work, such as Army Corps of Engineers permits and consultations under Section 106 of the National Historic Preservation Act, 54 U.S.C. 306108, and Section 7 of the Endangered Species Act, 16 U.S.C. 1531, including satisfaction of all Federal, State, and local requirements, and completion of the NEPA process.

The successful offeror, in collaboration with MARAD, will be responsible for the completion of consultations under Section 106 of the National Historic Preservation Act and Section 7 of the Endangered Species Act prior to completing NEPA. Until the NEPA review is completed, no action concerning the proposed project may be taken that would have an adverse environmental impact or limit the choice of reasonable alternatives.

3/513

(D) OSHA, USCG, and Safety. The Contractor shall provide, operate, and maintain a safe layberth in accordance with the requirements of the U.S. Coast Guard Captain of the Port (COTP) and the contract. The Contractor shall ensure that the layberth facility satisfies all Occupational Safety and Health Administration (OSHA) safety requirements. The facility, including but not limited to the layberth and associated structures, shall be well preserved and maintained at all times to ensure:

1. The proper level of safety for the vessel(s), facility, and personnel

2. The safe movement of the vessel(s), personnel, and vehicular traffic within the facility

3. Clean appearance, proper maintenance, and free from garbage and debris

4. Vessels at layberth shall be clear from the main shipping channel, at all times.

When ships are moored parallel to the main shipping channel, the outboard ship shall be at least 50 feet from the shipping channel.

C-5. LAYBERTH FACILITY REQUIREMENTS

(A) Layberth access shall be available at all times (including Contractor provided access between nested vessels) to facilitate crew boarding, training, cargo handling, ship husbanding, activations, and repair services required by the Government or its contractors. The Contractor shall ensure personnel and contractor access to and security of the layberth to meet the requirements set forth below:

1. Roadways. At all times during the term of this contract, access roads to the layberth facility, pier, and pier apron, (including bridges and tunnels if applicable) shall not present obstruction nor restrict the safe access to the dock by personnel and vehicular traffic including all local firefighting vehicles and AASHTO HS 20-44 trucks. The access roads and bridges shall have sufficient load bearing capacity and dimensions for AASHTO HS 20-44 truck traffic and the largest and heaviest local firefighting vehicles.

1.1. Road maintenance within the layberth facility shall be the responsibility of the

Contractor. All access roads, roadways, and the layberth shall be kept clear from snow, ice, debris, potholes and vegetation at all times.

1.2. The Contractor shall be responsible for, and bear all expenses associated with ensuring that there are properly paved and maintained access roads, (including bridges and tunnels if applicable) within the layberth facility.

1.3. There shall be an adequately sized turn around area to enable AASHTO standard HS 20- 44 trucks to turn around. The turn-around area shall be in close proximity to the dock apron so that such vehicles can turn around and back up to the dock or turn around before leaving via the access road.

3/514

2. Parking. The Contractor shall provide a well-maintained paved or gravel aggregate parking area adjacent to the pier. The parking area, reserved for layberth and shipboard personnel and visitors, shall be in addition to the pier staging area and have parking capacity for a minimum of twenty (20) automobiles per vessel. Parking spaces shall be clearly marked and be at least 10 feet wide and 20 feet long. The parking area shall be no closer than 100 feet to the nearest vessel and no farther than 500 feet from the nearest vessel and must meet the criteria specified below:

2.1. Does not require motorized transport between the parking area and the vessel.

2.2. Does not require authorized personnel to pass through additional security checkpoints other than the layberth facility entrance control point.

2.3. Does not require crossing major traffic routes or if part of a larger facility does not require crossing inbound/outbound truck traffic lanes.

2.4. Parking does not prevent delivery by truck to the vessel, does not reduce or inhibit truck turnaround area, and does not inhibit, block, or otherwise obstruct the 2-way passage of emergency vehicles throughout the length of the layberth.

3. Accommodation Ladder. The dock shall have a suitable landing area to receive the vessel's accommodation ladder at any water level. If at any time it is determined by the Government that the platform is improperly positioned or of insufficient size, it is the Contractor's responsibility to resolve the problem at Contractor's expense. This would include fabricating and installing a separate and distinct gangway system, if determined necessary by the Government.

4. Communications. The Contractor shall ensure that communications with the layberth facility operator and/or manager are available to the Government on a 24 hour per day, seven days per week basis. Additionally, the Contractor shall have e-mail capability.

5. Site Inspection Boat. The Contractor shall have access to a suitable boat that shall be available upon request to conduct waterborne inspections during any site survey. For estimating purposes, assume one site survey per year.

3/515

6. Oil Spill Plan. The Contractor is responsible for establishing and maintaining an oil spill response plan that is approved by the appropriate local, state, and Federal authorities for the layberth facility. The oil spill response plan shall be updated and submitted to the Contracting Officer thirty (30) days prior to layberth acceptance.

(B) The Contractor shall bear all expenses associated with utility services required for the normal operation and maintenance of the facility. Recurring expenses for the ship(s) are reimbursable. Licenses and permits are the responsibility of the Contractor.

1. Shore Power. The Contractor shall provide metered shore power services as required by Attachment 1 and 2 to the vessel(s) at their shore power receptacles. The Contractor shall provide separate shore power outlets, connections, and all other equipment, including attachment fittings rated to meet the 3-phase/60hz electrical requirements identified in Section J to supply electric power for machinery tests, dehumidification equipment and cathodic protection. Individual pier side circuit breakers shall have a load trip and shall be equipped with short circuit and overload protection on all three ungrounded phases. Six (6) individual 400 ampere rated (based on 90 degrees C conductor and 30 degree C ambient temperature based on the National Electrical Code for not more than three current-carrying conductors in raceway, cable, or earth) shore side combination circuit breaker/cable feeds shall provide shore power to each vessel. The circuit breakers shall be installed pier side in such a manner as to allow personnel quick access to the circuit breakers in case of an emergency. The circuit breaker location and access shall be clearly marked for maintenance personnel. When using single conductor cables, they must be of the same length, new and/or in good condition.

2. Electrical Power. Electrical power that is consumed shall be measured on the local electric company’s meter for the purpose of measuring power usage by the vessel(s). The Contractor shall arrange for a separate meter to be supplied for each vessel. The Government will order reimbursable electric power service from the Contractor if the Contractor obtains a commitment from the power company to exempt the layberth’s electric service from taxes. In the event the Contractor is unable to obtain tax-free electrical services, the Government, at its discretion, may contract directly for the services or order the reimbursable electric power from the Contractor, notwithstanding the tax consequence. In the event the Government chooses to procure electrical services through the Contractor, the Contractor shall subcontract for electrical services at the most competitive rates obtainable. For layberth facilities in locations where electrical power is deregulated, the Contractor shall review rates on an annual basis to procure the most economical service.

3. Metered Potable Water. The Contractor shall provide a metered potable water service connection for each vessel with a minimum requirement of 200,000 gallons per day at a minimum constant pressure of 40 psi at each ship(s) deck connection simultaneously, via a 2 ½” hose no further than 200 feet from each ship(s) potable water connection. The Contractor shall provide

3/516 a reduced-pressure type backflow prevention device on the shore side of the potable water connection and test it in accordance with local authority requirements. Water quality shall meet requirements of the Food and Drug Administration (FDA), U.S. Public Health Service, and the Department of Health and Human Services.

Potable water shall be delivered to the vessels with at least a measurable trace of halogen (chlorine or bromide). Thirty (30) days prior to layberth acceptance the Contractor shall provide two copies of a laboratory report to indicate that the water has been tested and meets City Hookup Standards.

4. Telephone Service. The Contractor shall provide basic infrastructure for three

(3) telephone lines and one high speed data line for each vessel. This shall include cables, attachment, fittings, and jacks to connect from the shore side connection point to the vessel. The ship manager shall provide telephone service, phones, and pay telephone/data usage charges. Any additional lines requested by the Ship Manager will be at their expense.

5. Sewage. The vessels use USCG-approved Marine Sanitation Devices (MSD) to discharge effluents into the surrounding water. Where discharge of MSD effluent into layberth waters is not permitted, the Contractor shall provide for direct connection for vessel effluent discharge at an average rate of 300 gallons per day per ship (total capacity of 1000 gallons per day per ship). The contractor shall furnish all hoses and fittings as required to properly connect to the vessel effluent discharge connection. All hoses, fittings and equipment utilized by the Contractor shall be in good material condition. The Contractor shall ensure that all effluent is handled and disposed of in accordance with applicable federal, state, and municipal laws and regulations.

6. Connect/Disconnect Services. On each occasion that the vessel(s) enter(s) or depart(s) the layberth, the Contractor shall be responsible for all connect/disconnect services, including, but not limited to, connecting vessel(s) to/disconnecting the vessel(s) from shore electric power, potable water, steam, telephone services, and sewage. Vessels may enter and depart 24 hours a day / 7 days a week. The Contractor is responsible for providing and rigging all hoses, piping, cables, and wiring to the vessel (s) for pier services. The Contractor shall assume that ship’s cranes are not available. If required, the Contractor shall provide any additional crane service if necessary to provide connect/disconnect services. The costs associated with connect/disconnect services will not be part of the per-diem rate and are paid according to the rates specified.

7. Utility Usage Fees. The Contractor will pay for shore power, potable water, and all costs for generation/delivery of steam (where required – to include utility usage and fuel consumed) consumed by the vessel(s). The recurring costs associated with the provision of these services shall be submitted to the Government as reimbursable expenses. The Contractor shall provide copies of all invoices from the electrical and water suppliers when submitting claims for reimbursement.

3/517

Garbage Collection. The Contractor shall provide for pier side garbage collection. An industrial size dumpster (minimum size shall be 4.0 cubic yards), shall be located within 100 feet of the gangway base of each ship. Contractor shall have the dumpster emptied on a regular basis, not less than

1. weekly. During ship activations the dumpsters may be filled faster than the regular basis and the COR may request additional removals, additional garbage collections are covered in Section C-14.

2. Recycling Collection. The Contractor shall provide for single stream recycling. The materials to be recycled are glass, metal/aluminum, paper, cardboard, plastics and construction steel (a steel bin need only be provided if it is available in the area where the facility is located). The type of recycling container to be provided is based on availability of service at the contractor's facility but shall not be less than 200 cubic feet capacity. The recycling container shall be located within 100 feet of the gangway of each ship. Local, state, and federal recycling regulations shall be observed in the provision of receptacles and collection. Contractor shall have the recycling container emptied on a regular basis, not less than weekly. During ship activations the recycling container may be filled faster than the regular basis and the COR may request additional removals, additional recycling collections are covered in Section C-14.

3. First Responders. There shall be an availability of first responders to include local firefighting, police and emergency resources for combating a vessel fire or other emergency at the layberth. All first responders shall be located within a 15-minute transit time of notification to the layberth.

4. Fire Fighting Capability. Fresh or saltwater hydrant services providing a minimum of 1,500 gallons per minute at 100 pounds per square inch (psi), shall be provided by the Contractor. Prior to layberth acceptance, the Contractor shall provide results of flow and pressure test for pier side fire hydrant, if applicable.

5. Moorings. The Contractor shall inspect all mooring fittings, including those moorings that are afloat, constructed offshore, or are otherwise not accessible by foot, as necessary but no less frequently than monthly.

6. Additional Services. Specialized removal services such as "foreign garbage," as defined by the United States Department of Agriculture (USDA), or hazardous materials removal must be available to the vessel(s) upon request. Charges for such special services are reimbursable. All items/findings subject to specialized removals, shall be disposed of and documented in logs, in accordance with all local, state, and federal laws and regulations. The Government reserves the right to conduct inspections of the Contractor’s specialized removal facilities and processes.

7. Liability Disclaimer

The Maritime Administration (MARAD) shall not be held liable for any

3/518 damage, loss, or injury to any vessel, equipment, property, or personnel arising from the acts, omissions, negligence, or willful misconduct of the Contractor or its agents, subcontractors, or employees in the performance of layberth operations and related services. The Contractor shall be solely responsible for any and all such damages and shall indemnify and hold harmless the Government from any claims, demands, or causes of action resulting therefrom.

FAR 52.246-25 – Limitation of Liability – Services.

C-6. FULL-SERVICE PORT COMPLEX

(A) The layberth facility shall be located in or near a full-service port complex that has the following services available (Where not otherwise stated below, to be located in the full-service port complex the facility for the required service shall be located no farther than 15 nautical miles from the Contractors layberth):

1. There shall be at least 3 existing ship repair companies that in their normal course of business perform ship repair services for comparable ocean-going vessels. Company facilities shall be located within 30 miles driving distance from the layberth. The businesses must be on call 24 hours a day and provide services including but not limited to the following crafts: welders, machinists, boilermakers, pipe fitters, riggers, electricians, labor, and skilled trades. In addition, companies shall have timely access to all materials and tools customary to the business of ship repair and ship repair services.

2. The port must be navigable 24 hours a day under normal conditions.

3. There shall be pilot services available 24 hours a day and seven days a week to support individual or multiple simultaneous vessel movements.

4. There shall be tugs normally involved in commercial ship-assist/harbor movements capable of arriving at the vessels within 120 minutes of request for service. The normal "home" dock for each ship-assist tug shall be no more than 15 nautical miles via navigable waterways from the layberth site. There shall be adequate ship-assist harbor tugs to safely move all the vessels under this layberth contract, while in a dead ship status, independently and simultaneously. This includes but is not limited to moving the ships to a safe anchorage, to another facility within the port complex, and maneuvering the ships within navigable turning basin and shipping channels.

5. There should be commercial water-borne bunkering services for ocean-going vessel(s) within 24 nautical miles transit via navigable waterways of the layberth. The bunker loading facility shall be normally used for the purpose of loading bunker barges for ship fueling needs from shore-based storage tanks. If commercial water-borne bunkering services within the port complex is not available, delivery of bunkers via barge to the assigned vessels at the layberth shall be allowed.

6. There shall be oily waste disposal services, and a US Coast Guard recognized Oil Spill Response Organization within 2 hours waterborne transit via navigable waterways from the layberth.

3/519

C-7. ENGINEERING DRAWINGS

(A) The Contractor shall provide detailed engineering design drawings, including but not limited to a facility drawing and a mooring plan. The engineering drawings shall be signed and certified by a professional engineer licensed in the jurisdiction of the proposed layberth facility (conceptual sketches are not acceptable). The certification will include a statement that the facility, to include all mooring structures, which results from proposed improvements accomplished in accordance with the certified plans, drawings, and calculations will meet all of the related requirements of the contract and meet all of the minimum USCG requirements with respect to marine safety and pier structural adequacy.

1. Proposed Mooring Plan/Facility Drawing and As-Built Mooring

Plan/Facility Drawings. The proposed facility drawing shall provide a scaled general layout of the proposed layberth facility accurately depicting the intended mooring location of the vessel(s) and proximity to shipping channels.

The drawing shall show other significant features of the facility such as pier, physical barriers, lighting, guard shack, roads, parking, buildings, etc.

1.1. The proposed mooring plan shall show the location of the vessel(s), all mooring fittings, and mooring line arrangement. The proposed pier, dolphins, bollards, and other shore side mooring fittings, including the number, size, arrangement and positions of mooring lines, will be safe and capable of holding the vessel(s) securely to the layberth. This capability shall apply to all tidal, current, and climatic conditions. The pier structure shall take into account the vessel(s) freeboard, drafts, and tidal conditions in the area. Drawings shall also depict resilient fendering and other significant features (potable water, shore power, telephone, fire hydrants, etc.) and include assumed positions of mooring lines as well as the rated safe working load (SWL) of all mooring fittings (bollards, fenders, dolphins, mooring buoys, etc.). All mooring fittings shall be clearly labeled on the engineering design drawings.

1.2. Prior to layberth acceptance, the Contractor shall provide a copy of the “as built” mooring plan/facility drawing, signed and certified by a licensed professional engineer, to the Contracting Officer and the COR. Copies of all calculations used in developing the heavy weather mooring plan shall also be provided. The certified mooring plan shall indicate the rated capacity for the bollards/fittings that are available for use and shall identify any bollards/fittings not intended for use. All bollards/fittings are to be clearly labeled on the mooring plan. The Contractor shall provide clear markings at the dock to indicate where each class of ship shall align with the pier.

3/520

C-8. WATER DEPTH

(A) The water depth, based on the National Oceanic and Atmospheric Administration (NOAA) chart datum for soundings at mean lower low water (MLLW) or seasonal low water, whichever is lower, shall be at least four (4) feet greater than the stated deep draft of the type of vessel to be located at the layberth (See Section J for ship characteristics). This depth shall be maintained the length and breadth of the proposed layberth, including the area needed to pull the vessel(s) away from the layberth with tugs, plus the access route from the layberth to the navigational channel, extending outward to the sea buoy, or pilot station, whichever is farther.

1. Soundings. Thirty (30) days prior to contract commencement, the Contractor shall provide recent (within 6 months) water depth soundings. The water depth at the berth shall be validated by multi-beam echo soundings based on the NOAA chart datum for soundings, as specified in Section E.6, prior to commencement of the period of performance. If vessels, including the MARAD vessels, at the berth under a contract, are currently occupying the layberth, it is the Contractor's responsibility to move those vessels away from the berth to accomplish the initial multi-beam survey. If the option year(s) is exercised, follow-on annual multi-beam surveys shall be conducted at the berth with results provided to the Contracting Officer and the COR. Surveys shall be scheduled to coincide with sea trials or during other periods when the berth is clear. If the Contractor is unable to schedule the annual multi-beam survey based on ship schedules, the Contracting Officer shall be notified in writing.

1.1. For undeveloped facilities, the design drawings must clearly indicate planned water depth after dredging. The POA&M shall include the dredging completion date and all significant events related thereto (See C- 4(B)).

2. Working Area. The waterside of the layberth shall be of sufficient width and depth to facilitate safe docking and undocking without interference to other shipping and shall be adequate to permit safe working room for tugboats, barges, lighters, and floating cranes. As a minimum, 75 feet extending outward from the vessel, or if nested, from the outboard vessel, shall be free and clear to provide safe working room. The water depth of the 75- foot clearance beyond the outboard vessel shall be as follows: The first 50 feet outboard of the vessel shall be the same depth as required in section C.5.(B) for maneuvering the ship away from the layberth or nested ship. The remaining 25-foot clearance shall be adequate to accommodate the depth of water required by service tugs for the local area, but no less than 20 feet based on the NOAA chart datum.

2.1. Coordination with local Pilots and Docking Masters shall be maintained to determine local minimum requirements for docking and undocking. If the local Pilots or Docking Masters determine that the requirements stated in C-8(A) 2 are inadequate for normal ship movements, then the Contractor shall comply with the increased minimum water depth requirements as specified by local Pilots and Docking Masters for

3/521 docking/undocking and shall bear all expenses to increase the water depth.

3. Obstructions. The layberth Contractor shall ensure the removal of all underwater obstacles that create a hazard to the vessel at the layberth and the Contractors area of responsibility prior to the vessel’s arrival on berth.

4. Dredging. If the performance of normal maintenance to the layberth, including dredging, requires temporary movement of the vessel from the subject layberth, the Contractor shall bear all expenses incurred in moving the vessel including but not limited to tugs, pilotage, and temporary layberth costs.

Any temporary layberth used shall meet all the requirements of this contract.

Should the Contractor be unable to offer an acceptable substitute layberth during such a maintenance period, the Government reserves the right to acquire and move the vessel to a temporary layberth of its choice at the Contractor's expense or to terminate the contract for default.

5. Dredging Completion Certificate. If dredging is required to meet the depth requirements of Section C-8, a Dredging Completion Certificate shall be submitted to the Contracting Officer and the COR no later than 30 days after each instance where dredging is completed.

6. Turning Area. Adequate room to turn the vessel(s) must be available. The proposed turning area shall be marked on a harbor chart. The local Docking Pilot’s Association or equivalent must approve the proposed turning area.

7. Air Draft. Clearance between the ship’s highest point and overhead obstructions, from the open seas to the layberth shall be at least two feet at mean higher high water (MHHW) or seasonal high water, whichever is higher (See Section J for ship characteristics).

C-9. MOORING ARRANGEMENT

(A) The proposed berthing facility shall be of sound structural design, construction and condition to support a heavy weather mooring plan in accordance with Mooring Service Type III standards as identified in Unified Facilities Criteria (UFC) 4-159-03 utilizing sustained wind speeds of 130 mph. Wind speed value is to be verified against the most current printing of exposure D (American Society of Civil Engineers (ASCE), Minimum Design Loads for Buildings and Other Structures; flat unobstructed area exposed to wind flowing over open water for a distance of at least 1 mile). If at any time during the contract, the researched wind speeds are higher than 130 mph the contractor shall notify the MARAD technical POC and utilize the higher speed for mooring calculations. A draft heavy weather mooring plan with drawings shall be submitted no later than 14 calendar days after Contract award date. An approved mooring plan and drawings shall be submitted no later than 14 calendar day before the Contract Start Date.

1. Heavy Weather Mooring Plan. The layberth shall have a sufficient number of properly positioned and fastened mooring line fittings (bollards, dolphins, etc.) to meet Mooring Service Type III requirements for the vessel(s) assigned

3/522 without pretensioning of lines (See Section J for ship dimensions and wind speeds by port). This requirement is modified by any other local requirements mandated by the cognizant USCG Captain of the Port (COTP) that increases the required strength and shall be the responsibility of the Contractor for the duration of the contract. Attachment 8 details required elements in the Heavy Weather Mooring Plan deliverable.

1.1. The heavy weather mooring plan and calculations shall demonstrate full compliance with all the relevant terms and conditions in this contract, showing that the vessel(s) can be safely moored permanently at the proposed layberth up to the maximum weather and wind conditions specified herein.

1.2. When preparing mooring calculations, the combination of wind direction, wind speed, tides and currents shall be analyzed to determine the worst-case scenario. Mooring calculations are to ignore the presence of nearby external structures, buildings, other ships, etc. as mitigating the effects of wind. If the layberth is within 1,000 feet of a navigation channel, a passing vessel analysis is to be prepared. The passing vessel analysis is to identify pier improvements required to mitigate the passing vessel effects.

Assumptions to be used:

(i) Passing vessel speed is reasonable for the area if not regulated or controlled.

(ii) Distance off moored vessel is the max length vessel allowed to transit the area.

(iii) Assume draft of passing vessel is max draft allowed to transit the area.

1.3. The mooring lines and layberth mooring points shall be analyzed in accordance with Mooring Service Type III standards as identified in UFC 4-159-03. In performing this analysis, a minimum factor of safety of 2.5, based on the minimum calculated breaking strength for the mooring line material in the heavy weather mooring plan is required for

3/523 all mooring lines subject to tension forces. Assume pretensioning of lines is not available. OPTIMOOR software is an acceptable methodology.

1.4. The mooring lines used in the heavy weather mooring plan shall not be the current ships complement of mooring lines, pendants, and fittings.

1.5. To the greatest extent possible, all mooring lines used in the heavy weather mooring plan shall be of the same type and size. If using High Modulus Polyethylene (HMPE) or other minimum stretch lines, a mooring pendant shall be included with each HMPE or other minimal stretch line in the heavy weather…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .