RFP Solicitation - VI DPC A34(1) C2.pdf
PDF 5 MB Posted
- Solicitation number
- 693C73-27-R-000012
About this file
This is a Request for Proposals (RFP) solicitation issued by the Department of Transportation Federal Highway Administration for Veterans Drive Contract 2 Improvements to Route 30 (Solicitation Number 693C73-27-R-000012). The project involves roadway improvements and construction work on Route 30, with the specific scope of work and technical requirements detailed within the solicitation document.
The RFP establishes the contractual framework, evaluation criteria, and submission requirements for interested contractors to bid on this federal highway improvement project. Prospective offerors must comply with all stated requirements, submit proposals by the specified deadline, and meet qualifications for federal contracting. The solicitation likely includes standard federal contracting clauses, insurance and bonding requirements, and compliance with applicable transportation regulations and standards. Contractors should review all associated documentation including any performance work statements, technical specifications, pricing schedules, and standard federal forms to understand the complete scope, delivery timeline, and award criteria for this highway construction initiative.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL
RFP No. 693C73-
This Contract Cites
STANDARD SPECIFICATIONS (FP-14)
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
VI DPC A34(1)
VETERANS DRIVE PHASE 2
IMPROVEMENTS TO RTE 30 (VETERANS DRIVE)
Contract No.
ADDRESS:
CONTRACTOR:
CONTRACT 2VI DPC A34(1) CONTRACT 2
VETERANS DRIVE PHASE 2
VI DPC A34(1)
VETERANS DRIVE PHASE 2
CONTRACVI DPC A34(1) CONTRACT 2T
VETERANS DRIVE PHASE 2
STATE Virgin Islands
DISTRICT ST. THOMAS
AGENCY Virgin Islands Department of Public Works
TYPE OF IMPROVEMENT
Widen, realign, and reconstruct the Veterans Drive, enhance pedestrian and vehicular safety, and improve drainage of the roadway prism
Project Length Totals For Parking Areas, Lane Miles is calculated as SQFT/11ft (nominal) lane
0.38 1.54
Schedule Parking Area Roadway / Parking Area / Other Stations / SQFT Linear
Feet Route Miles
Lane Miles
A Veterans Drive 222+89.23 To 239+99.45 1,710 0.32 1.30
C Veterans Drive 219+69.54 To 222+89.23 320 0.06 0.24
TABLE OF CONTENTS
Page
Notice to Offerors 1 through 3
Checklist for Offer Submission 1 through 3
*SF-1442 Solicitation, Offer, and Award 1 through 6
Statement of Work 1 Page
Proposal Schedule Instructions 1 through 8
*Proposal Schedule B-1 through B-12
*SF-24 Bid Bond C-1 through C-2
FEDERAL ACQUISITION REGULATION & TRANSPORTATION ACQUISITION
REGULATION SOLICITATION PROVISIONS & CONTRACT CLAUSES
Index to Federal and Transportation Acquisition Regulations 1 through 6
Representations and Certifications (SAMs online) D-1 through D-4
Instructions to Offerors E-1
*Socioeconomic Program Requirements F-1 through F-5
Minimum Wage Schedule
*General Contract Requirements
Construction Contract Requirements
F-6 through F-9
G-1 through G-11
H-1 through H-7
Special Contract Requirements J-1 through J-71
Section K K-1 through K-3
Permits Obtained for this Project 1 through 24
SPECIFICATIONS ON SAM.GOV
Plans (Schedule A) 1 through 455 Plans (Schedule C) 1 through 196 Drainage Report 1 through 187 Flexible Pavement Design Report 1 through 339 Flushing Study Report April 2023 1 through 70 Geotechnical Report 1 through 323 Rigid Pavement Design Report 1 through 52 Wall_Miscellaneous Calculations Final 1 through 319 NEPA Report/Memo 1 through 1128 *Offeror’s Qualifications Form 1 through 7
* Federal Contractor Veterans’ Employment Report VETS-4212 1 through 5
*BOLD FACED ITEMS ARE TO BE INCLUDED WITH THE PROPOSAL SUBMITTAL
PACKAGE
NOTICE TO OFFERORS
CONTRACT FORMAT:
Offerors should note that the format of this contract is in accordance with Federal Acquisition Regulations (FAR), promulgated by the General Services Administration (GSA), effective April 1, 1984, including all applicable revisions. Applicable FAR provisions and clauses are incorporated in this contract by reference or full text as indicated in the INDEX before the D-pages in this booklet.
FAR provisions and clauses incorporated by reference can be accessed on the Internet website at https://www.acquisition.gov/. Offerors are encouraged to review the documents thoroughly before submitting a proposal.
REQUEST FOR PROPOSAL BOOKLET AND PROPOSAL SUBMITTAL:
It is the responsibility of the Offeror to verify that this proposal is complete as listed in the Table of Contents. The Offeror is responsible for submitting all required forms and documents with the offer.
Offerors should use the Checklist for Offer Submission included in this booklet to check that their proposals are complete.
CONSTRUCTION CONTRACTS:
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 50%. Additional guidance is given in FAR Subpart 35.005 where the majority of the project work is complex and specialized such as restoration work, bridge painting, and proprietary construction techniques (i.e. proprietary Cintec arch strengthening.) There are exceptions and they will be reviewed on a case-by-case basis.
HAZARDOUS MATERIALS IDENTIFICATION AND MATERIAL SAFETY DATA:
As required by FAR Clause 52.223-3, Hazardous Materials Identification and Safety Data, the apparent low Offeror must submit prior to award a Material Safety Data Sheet (MSDSs) for all hazardous materials that the Offeror identifies in paragraph (b) of this clause in Section G of this booklet. Failure to submit MSDSs may render the Offeror ineligible for award of contract. The apparent low Offeror should submit their MSDSs within two weeks after bid opening.
ATTENTION LARGE BUSINESSES - UTILIZATION OF SMALL BUSINESS CONCERNS:
All offerors that are large businesses should note their responsibilities in the awarding of subcontracts in accordance with FAR Clause 52.219-8, Utilization of Small Business Concerns. An awardee, if a large business concern, should note its responsibility to establish and conduct a subcontracting plan in accordance with FAR Clause 52.219-9, Alternate II, Small Business Subcontracting Plan. Any offeror registered as a LARGE BUSINESS under the solicitation’s NAICS code is required to submit a subcontracting plan with their proposal in response to this solicitation. If the apparently successful offeror fails to submit a subcontracting plan within the time limit prescribed by the Contracting Officer, the offeror will be ineligible for award. PLEASE NOTE: A blank subcontracting plan is included in this solicitation package as a separate document for your use.
INTERNET BASED DATABASES - REQUIRED INPUT:
Per FAR Provision 52.204-7, offerors are required to be registered in the System for Award Management (SAM) at the time a offer is submitted and at the time of award.
Access the following web site to register: https://www.sam.gov/.
Per FAR Clause 52.204-13, contractors shall maintain an active SAM registration during contract performance through final payment under a contract. This includes reviewing at least annually its registration in SAM and validating that the information is current, accurate, and complete.
NOTICE:
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting Officers will not consider these representations when making award decisions https://www.sam.gov/
NOTICE TO OFFERORS - (CONT'D.)
or enforce requirements. Entities are not required to, nor are they able to update their entity registration to remove these representations in SAM.
According to FAR Subpart 22.1302 (b) federal contractors and sub-contractors MUST complete the required annual Vets-4212 Form in order to be eligible for a contract award. It can be completed on-line at http://www.dol.gov/vets/vets4212.htm. The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.
PAYMENT:
Offerors are advised to review the Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP), subsection 109.05, concerning direct and indirect payment included under a pay item in the bid schedule.
PROGRESS PAYMENTS:
ALL payments will be made via Electronic Funds Transfer (EFT) as such; the payment information in SAM must be accurate in order for contractors' invoices to be considered proper invoices for the purpose of prompt payment under DOT contracts. Contractors must input and maintain (update as necessary) their EFT information in the SAM database. Offerors are advised that under FAR Clause 52.232-5, Payments Under Fixed Price Construction Contracts, upon request, progress payments will include premiums paid by the Contractor to obtain performance and payment bonds as required under this contract. These payments shall not be made in addition to the contract price. As specified in the FP, “Section 151 - MOBILIZATION", payments for performance and payment bond premiums shall be included in mobilization.
WELFARE-TO-WORK INITIATIVE:
The President’s Welfare Reform Bill was initiated to assist welfare recipients and hopefully aid welfare recipients to find gainful employment. In support of this bill, Contractors are encouraged to hire welfare recipients whenever possible and to use welfare recipients in performance of duties on Government contracts.
INCREASING SEAT BELT USE IN THE UNITED STATES:
The President’s Executive Order 13043 dated April 16, 1997, was issued to increase the use of seat belts in the United States. In support of this Order, contractors and subcontractors are encouraged to adopt and enforce on-the-job seat belt policies for their employees when operating company-owned, rented, or personally owned vehicles.
OBTAINING PROPOSAL DOCUMENTS:
Request For Proposal (RFP) documents will not be mailed. All solicitation documents are available for direct download from the Contract Opportunities website: https://sam.gov/. Contractors are encouraged to register on the website (for this specific project) in order to receive automatic notifications when a document is added or updated for this specific project. All questions about this construction project must be emailed to the following address:
eflhd.contracts@dot.gov.
THE CONTRACTOR IS SOLELY RESPONSIBLE FOR MONITORING THE WEB PAGES
NOTED ABOVE FOR ALL CHANGES TO THE SOLICITATION AND ACTING ON
THOSE CHANGES.
http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212 http://www.dol.gov/vets/vets4212.htm https://sam.gov/ mailto:eflhd.contracts@dot.gov
NOTICE TO OFFERORS
PLEASE NOTE ELECTRONIC PROPOSALS WILL BE ACCEPTED VIA
EMAIL ONLY AT EFLHD.CONTRACTS@DOT.GOV. Proposals sent to any other email address besides EFLHD.Contracts@DOT.GOV will not be accepted. Proposals will not be accepted via facsimile. Proposals submitted via external, cloud-based, file storage services such as OneDrive, etc. shall not be accepted. The government will not click on links sent via email to access solicitation documents.
mailto:EFLHD.CONTRACTS@DOT.GOV mailto:EFLHD.Contracts@DOT.GOV
CHECKLIST FOR OFFER SUBMISSION
The following is a checklist of items included in the proposal/bid package that are required to be completed and returned (or filled in on-line) to the address in Block 7 of the Standard Form 1442, Solicitation, Offer, and Award (page 1). This checklist is for informational purposes only and is not required to be filled out by the Offeror. Failure to submit a complete proposal may be cause to reject your proposal.
PLEASE NOTE ELECTRONIC PROPOSALS WILL BE ACCEPTED VIA
EMAIL ONLY AT EFLHD.CONTRACTS@DOT.GOV. Proposals sent to any other email address besides EFLHD.Contracts@DOT.GOV will not be accepted. Proposals will not be accepted via facsimile. Hand-delivered proposals are not recommended.
1. Proposal Envelope (If the Offeror elects not to send the proposal electronically via email to EFLHD.Contracts@dot.gov):
a. Addressed as shown in Block 7 of SF-1442
b. In the lower left corner, indicate the following: Solicitation No., Project Name & Number, and mail to Suite E2-3-300, ATTENTION: ACQUISITIONS. If proposals are hand-delivered, bring them to the main entrance of Quantum Park, and ask for the Federal Highway Administration (EFLHD) Receptionist to be contacted and an EFLHD representative will come to collect the proposal. HAND-DELIVERED PROPOSALS ARE NOT RECOMMENDED.
2. Standard Form 1442: Solicitation, Offer and Award
a. Block 14: Name and Address of Offeror.
b. Block 15: Telephone Number of Offeror.
c. Block 16: Remittance Address if different from Block 14.
d. Block 19: All Amendments Acknowledged, with dates of Amendments.
e. Block 20: Proposal is signed and dated.
3. Proposal Schedule - (Pages B-1 through B-12)
a. Unit proposal price and proposal amount provided for each pay item in numbers.
b. Corrections initialed.
c. Price Evaluation eligibility is indicated on the Proposal Summary page.
4. Standard Form 24, Bid Bond (Pages C-1 through C-2) (Required if bid guarantee is bid bond)
a. Date executed
b. Legal name and address of Offeror.
c. Type of organization.
d. State of incorporation (if applicable).
e. Name and business address of Treasury approved surety.
f. Penal sum of bond (not less than 20% of proposal total).
g. Proposal identification.
h. Signature of Offeror
i. Seal, if corporation
j. Signature of Surety
k. Seal, if corporation
PROPOSALS RECEIVED WITHOUT A VALID BID BOND WILL BE REJECTED.
mailto:EFLHD.CONTRACTS@DOT.GOV mailto:EFLHD.Contracts@DOT.GOV mailto:EFLHD.Contracts@dot.gov
5. Power of Attorney.
a. Dated on or before execution date of bond
b. Power has original signature of surety, or is embossed with surety's seal in the certification section
PROPOSALS RECEIVED WITHOUT A VALID POWER OF ATTORNEY WILL BE REJECTED.
6. Fill-ins. The following full text Clauses and/or Provision numbers shall be checked or filled in and returned with the proposal package:
a. 52.219-4 – HubZone ONLY - See Section F, Clause 52-219-4, paragraph "b", check block if waiver is applicable.
7. Offeror's Qualifications form (provided separately as part of the proposal Documents Package). Form completed, signed and submitted with proposal
8. Subcontracting Plan - Large Businesses Only:
Submittal is mandatory per FAR 52.219-9 Alt II.
Legislated subcontracting goals: (15 USC 644 (g)(1))
• 43.02% - Small Businesses (SB)
• 5% - Small Disadvantaged Businesses (SDB)
• 3% - HUBZone
• 5% - Woman-Owned Small Business Entities (WOSB)
• 5% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)
9. System for Award Management (SAM): The contractor is currently registered in the System For Award Management (SAM) database at https://www.sam.gov/ at the time the offer is submitted. If the contractor elects to not have its active SAM registration viewable by the public, then the contractor must submit a copy with the proposal.
10. Online Representations and Certifications Application: The contractor's Representations and Certifications have been input online via the electronic database at https://www.sam.gov/.
11. VETS – 4212 Reporting: The contractor has completed the annual reporting requirement online at http://www.dol.gov/vets/vets4212.htm.
The annual filing period for Form VETS-4212 is August 1 through September 30. Reports filed before August 1 will be treated as part of the previous year's filing cycle. Federal contractors and subcontractors who are required to file a form VETS-4212 can submit their forms electronically by using either the VETS-4212 Reporting Application or batch filing process, or by using the paper form by email or U.S. mail. It is recommended that you file your form electronically at https://vets4212.dol.gov/vets4212. Please visit http://www.dol.gov/vets/vets4212.htm for more information on the reporting process.
12. INVOICING FOR PAYMENTS: The Contractor affirms that it does not operate any diversity, equity, and inclusion (DEI) initiatives that are inconsistent with the Equal Protection principles of the Constitution and the non-discrimination requirements of Federal law, as interpreted by the Supreme Court in Students for Fair Admissions v. Harvard, 600 U.S. 181 (2023).
https://www.sam.gov/ https://www.sam.gov/ http://www.dol.gov/vets/vets4212.htm https://vets4212.dol.gov/vets4212 http://www.dol.gov/vets/vets4212.htm
NOTE: THE CONTRACTOR IS FULLY RESPONSIBLE TO VERIFY THAT ALL
DATA IN THE ABOVE DATABASES IS CORRECT EACH TIME A PROPOSAL
PACKAGE IS SUBMITTED. FAILURE TO PROPERLY INPUT AND/OR
UPDATE YOUR DATA PRIOR TO OFFER SUBMISSION MAY CAUSE THE
PROPOSAL TO BE REJECTED.
C2
CONTINUATION OF SF 1442
Block 2:
This project is UN-RESTRICTED - Proposals will be accepted from ALL eligible business concerns.
This procurement falls under North American Industry Classification System (NAICS) code 237310 - Highway, Street, and Bridge Construction (see FAR Subpart 19.10).
The award of this project is subject to a 10% price evaluation preference for eligible HUBZone Small Business Concerns (must be on the SBA listing) (see FAR Clause 52.219-4).
Electronic proposals will be accepted via email sent to EFLHD.Contracts@dot.gov. Please be sure to indicate the solicitation number, project number, and ATTN: Shirley Anderson on the subject line of your email. Proposals submitted via external, cloud-based, file storage services such as OneDrive, etc. shall not be accepted. The government will not click on links sent via email to access proposal documents. Please note you must include a scanned copy of your official bid bond along with your proposal documents if you submit your proposal electronically.
Block 9:
PHYSICAL DATA AVAILABLE FOR REVIEW
1. Manual on Uniform Traffic Control Devices for Streets and Highways, most current edition, published by the Federal Highway Administration. https://mutcd.fhwa.dot.gov/.
2. Drainage Report
3. Flexible Pavement Design Report
4. Flushing Study Report April 2023
5. Geotechnical Report
6. Rigid Pavement Design Report
7. Wall_Miscellaneous Calculations Final
8. NEPA Report/Memo
9. Permits
Data and information furnished or referred to above is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
A Government representative can be available to show the project to prospective offerors. All requests for site visits see Section E of the solicitation and e-mail all questions concerning this construction project to the following e-mail address eflhd.contracts@dot.gov. Interested parties must provide the Solicitation Number and the relevant project name with all requests and questions.
∗Block 11:
All work for Schedules A and C must be completed by no later than February 14, 2029.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately https://mutcd.fhwa.dot.gov/ https://highways.dot.gov/federal-lands/design/highway-design-library mailto:eflhd.contracts@dot.gov
• If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be no later than February 14, 2029 and will start on the effective date of Schedule A’s Notice to Proceed.
• If Schedule C (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule C work will no later than February 14, 2029 and will run concurrently with Schedule A.
See Completion of Work section of the B-Pages – Bid Schedule Instructions for further information. The completion time for the contract is not to exceed the maximum time above.
Work restrictions can be found in SCR Sections 108 and 156.
Notice to Proceed will be issued within 30 days following receipt of acceptable performance and payment bonds. (Actual Notice to Proceed date will be 10 days from issuance or the date specified in the Notice.)
Block 12A:
Furnish performance and payment bonds in accordance with FAR Clause 52.228-15.
Block 13:
A bid guarantee in the amount of not less than 20 percent of the price proposal or $3 million, whichever is less, is required with this proposal. If the offeror fails to provide the required bid guarantee, such failure may require rejection of the offer. Reference FAR Provision 52.228-1, Bid Guarantee. Please note you must include a scanned copy of your official bid bond along with your proposal documents if you submit your proposal electronically.
Block 17:
Amounts should be completed as follows:
Schedule A - $ Schedule C (Option 1) - $
Other:
The estimated price is expected to fall within the price range of $80,000,000 to $90,000,000.
Responsibility of offerors shall be evaluated in accordance with the information provided on the Offeror's Qualifications Form, which can be downloaded from the Contract Opportunities website located at http://SAM.gov. FP-14 versions can be downloaded at the FHWA web site located at http://flh.fhwa.dot.gov/resources/specs/.
Electronic proposals must contain the required signatures (electronic or by hand).
Basis for Award:
EFLHD intends to award a fixed price contract without discussions with offerors (except clarifications as described in FAR 15.202(b)); therefore, the offeror's technical and price proposal should be clear and complete and contain the offeror's best terms. The Government reserves the right to conduct discussions if later deemed necessary. The Government further http://sam.gov/ http://flh.fhwa.dot.gov/resources/specs/ reserves the right to reject any or all offers if such action is in the Government's best interest.
The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15.103-1. This process permits tradeoffs between price and technical “non-cost” factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative analysis and an integrated assessment of proposals against all source selection criteria in the solicitation.
Evaluation of Award:
All evaluation factors other than cost or price, when combined, are approximately equal in their importance when compared to cost or price. The Government is concerned with striking the most advantageous balance between technical merit (“quality”) and cost to the Government (i.e., the price). The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor. The Technical Proposal of the Offeror awarded the contract will be incorporated into the contract by reference and the Contractor shall be bound by its contents. The technical proposal evaluation factors will be weighted as follows: Factor 1 = 45%. Factor 2 = 20%. Factor 3 = 20%. Factor 4 = 15%.
Please Note:
This solicitation is a Request for Proposal (RFP). Therefore, there will not be a public bid opening and proposals are not available for review.
Subcontracting Goals
Required from all other than Small business when the requirement is expected to exceed $900,000 ($2,000,000 for Construction) [FAR 19.702]. The Contracting Officer, along with review and advisory comments from the Office of Small Disadvantaged Business Utilization (OSDBU), is responsible for approving a reasonable and realistic plan [FAR 19.705-4] [TAM 1219.201(e)(6)]. The legislated subcontracting goals are as shown below. A copy of each subcontracting plan (or contractor statement that no subcontracts are to be awarded) must be provided to OSDBU prior to completion of negotiations [TAM 1219.705-5 and - 6].
Legislated subcontracting goals: (15 USC 644 (g)(1))
• 40.13% - Small Businesses (SB)
• 5% - Small Disadvantaged Businesses (SDB)
• 3% - HUBZones
• 5% - Women-Owned Small Businesses (WOSB)
• 5% - Service-Disabled Veteran-Owned Small Businesses (SDVOSB)
Mr. Jameel Siddiqi has been appointed Administrative Contracting Officer to perform the duties as specified in the Federal Acquisition Regulation, Part 42.302 (a) and (b). The Construction Operations Engineer is also Mr. Siddiqi.
STATEMENT OF WORK
Sealed bids from all business concerns will be accepted for the United State Virgin Island, St.
Project VI DPW A34(1) Contract 2, Solicitation Number 693C73-27-R-000012, located in St.
Thomas, US Virgin Islands. The project consists of widening, realignment, reconstruction of Veterans Drive. The work includes roadway widening to provide continuous 4 lane section, construction of new sea walls to accommodate the roadway widening, drainage work, new promenade with rest area on the water side, new sidewalks, and utility relocation, new landscaped median, and other miscellaneous work.
The project will be one work schedule/base contract, with the cost of the entire project expected to fall within the price range of $80,000,000 to $90,000,000.
The performance period to complete all contract work will be no later than February 14, 2029 after the issuance of the Notice to Proceed.
PROPOSAL INSTRUCTIONS
PROJECT VI DPC A34(1) Contract 2:
OFFERORS PLEASE NOTE: Before preparing the proposal, carefully read the Instructions to Offerors. While preparing the proposal, comply with the following:
ALL PROPOSALS ARE TO BE SUBMTTED ELECTRONICALLY.
Submit one (1) Technical Proposal and one (1) corresponding Price Proposal electronically via one (1) email containing two (2) pdf attachments. One pdf attachment shall be the Technical Proposal and the second pdf attachment shall be the Price Proposal. Electronic proposals will be accepted only via email sent to EFLHD.CONTRACTS@DOT.GOV. Proposals submitted to any other email address will not be accepted. Please be sure to indicate the solicitation number 693C73-27-R-000012, project number VI DPC A34(1) Contract 2, and ATTN: Shirley Anderson on the subject line of your email.
Submit all proposals on or by the due date and time specified in Block 13 of the SF-1442. Send proposals directly to the attention of the person listed in Block 9 of the SF-1442.
It is the Offeror’s sole responsibility to see that its proposal documents are received. Proposal documents received after the due date and time will be rejected without consideration or further evaluation. In addition, it is the Offeror’s responsibility to ensure all requirements of both the Technical Proposal and Price Proposal are included.
EVALUATION OF PROPOSAL DOCUMENTS:
STEP 1 – TECHNICAL PROPOSAL EVALUATION
The Technical Proposal is limited to 40 pages, 8.5” x 11” size paper, printed on one side only, pages numbered, and using Times New Roman font size 12. Gantt charts, site maps, or charts can be submitted on single sided sheets up to 11” x 17.” The Technical Proposal cover letter, outside covers, section dividers, and resumes do not count toward the 40-page limit.
Evaluation and Weighting Criteria
An Evaluation Board will evaluate each Technical Proposal using the following evaluation criteria, relative importance and Confidence ratings:
• Factor 1: Qualifications and Prior Experience. (Factor 1 importance weight = 45%)
• Factor 2: Planned Approach to Construction and Project Understanding. (Factor 2 importance weight = 20%)
• Factor 3: Project Management and Controls. (Factor 3 importance weight = 20%)
• Factor 4: Offeror’s Past Performance. (Factor 4 importance weight = 15%)
Factor 1 – Qualifications and Prior Experience.
The Government will evaluate the Offeror’s qualifications and prior experience including example projects, proposed team, capacity to accomplish the required work, and legal and financial condition as described below.
1. Proposed Team: Provide an organizational chart and submit resumes of key personnel to be involved in the project, indicating their specific experience within the past five (5) years performing technically similar road and sea wall construction work, construction project management, and construction QA/QC work for FHWA and /or a similar DOT.
At a minimum, include the Project Manager, Environmental Mitigation Manager, Construction Superintendent, Traffic Safety Supervisor, and the Construction QA/QC Manager. List any subcontractors whom proposed to provide services and indicate their experience performing similar work. Submit the organizational structure/chart in one 11” X 17” paper, identifying major participants and describing roles in the project. Individual resumes will not exceed two (2) pages.
2. Example Projects: Submit 3 recent projects completed within the past 10 years with similar scope, size, and complexity to the VI DPC 34(1) Phase 2 Widening, Safety Improvements, and Beautification for Veteran’s Drive project. Provide customer/owner point of contact, phone number, and email address for each example project. Include details regarding project budget vs. total cost and scheduled completion date vs. actual completion date. Provide a brief statement indicating your firm’s experience and technical competence in road construction in high profile and politically sensitive locations, as well as experience with traffic control in high ADT areas. In addition, provide a brief statement indicating your firm’s knowledge and experience working in historical or environmentally sensitive areas. List any relevant experience working with EFLHD or the Virgin Islands Department of Public Works.
3. Capacity: Provide a brief statement indicating the Offeror’s capability to ensure work will be completed on time and within budget. Such areas of interest include your firm’s financial resources, human resources, their geographical location, available equipment, as well as your knowledge and experience with working in historic and environmentally sensitive areas. Include any statements as to the Offeror's integrity, reasonable and cooperative conduct, and commitment to QA/QC and customer satisfaction. Provide information on your current workload and how you would accommodate this project.
4. Legal and Financial Condition: Provide a statement addressing the following questions:
a. Within the last five years, has your firm ever had a contract terminated for any reason, either as a prime or subcontractor? This also applies to a partner in a joint venture.
b. Within the last five years, has your firm ever filed a claim relative to the construction of a roadway facility or bridge for (1) a default termination, (2) the imposition of liquidated damages, (3) a termination for convenience that adversely affected your firm, or (4) any damages caused by the owner’s determination that you were not performing in a timely, safe, or contractual manner?
Factor 1: Qualifications and Past Experience
Confidence Rating
Description / Indicators
High Confidence
The Government has high confidence that the Offeror understand the requirements and will be successful in performing the contract with little or no Government intervention based on the Offeror’s key personnel qualifications and experience in the construction of roadway and sea wall projects similar in scope, size, and complexity.
Some Confidence
The Government has some confidence that the Offeror understand the requirements and will be successful in performing the contract with some Government intervention based on the Offeror’s key personnel qualifications and experience in the construction of roadway and sea wall construction similar in scope, size, and complexity.
Low Confidence The Government has low confidence that the Offeror understand the requirements and will be successful in performing the contract even with Government intervention based on the Offeror’s key personnel qualifications and experience in the construction of roadway and sea wall construction similar in scope, size, and complexity.
Factor 2 – Planned Approach to Construction and Project Understanding.
The Government will review and evaluate each Offeror’s understanding of the contract work and overall approach to managing and constructing the project. Provide a description of the Offeror’s methods and ability to complete the contract work on time and within budget including the following:
1. Approach to pavement reconstruction, drainage work, and seawall construction.
2. Approach to utility replacement, coordinating and addressing unforeseen utility conflicts with utility owners to minimize impacts to the project schedule.
3. Approach to traffic control including how the Offeror will maintain detour routes and minimize impacts to traffic through project intersections. Identify how road reconstruction work will be staged to accommodate pedestrian traffic through the project area. Approach to coordination with EFLHD, VI DPW, Police, and other affected stakeholders to ensure that all traffic and access needs are understood and met. Describe how the Offeror will work with the Government and project stakeholders to help oversee the successful implementation of the Transportation Management Plan, including how public safety and awareness efforts will be addressed.
4. Approach to providing a finished facility that will accommodate and improve traffic flow.
5. Proposed landscaping and aesthetics to blend the roadway template into the existing terrain.
6. Approach to protection of existing natural resources within the project limits.
7. Approach to environmental mitigation methods and plans.
8. Approach to identifying project risks and describe the associated mitigation strategies.
Factor 2: Planned Approach to Construction and Project Understanding
Rating
Description / Indicators
High Confidence
The Government has high confidence that the Offeror understands the requirement, proposes a sound approach to construction, and will be successful in performing the contract with little or no Government intervention.
Some Confidence
The Government has some confidence that the Offeror understands the requirement, proposes a sound approach to construction, and will be successful in performing the contract with some Government intervention.
Low Confidence The Government has low confidence that the Offeror understands the requirement, proposes a sound approach to construction or will be successful in performing the contract even with Government intervention.
Factor 3 - Project Management and Controls.
The Government will evaluate the Offeror’s approach to project management and controls based on the Offeror’s approach to the project’s QA/QC, schedule, and coordination as described below.
1. QA/QC: Provide the planned approach to overall QA/QC to deliver a quality construction project on time and within budget. Include a summary of the proposed Quality Control Plan. The Government will review and evaluate each Offeror’s Quality Control Plan to assess the soundness and reasonableness of the Offeror’s planned QA/QC approach for construction including materials sampling and testing.
2. Schedule: Identify the system to be used for managing the construction schedule and provide a project schedule including critical activities, durations, logical relationships, and construction milestones. Describe the means and methods by which the Offeror will plan and control the scheduling of work to ensure the project is constructed on time or ahead of schedule.
3. Coordination: Describe the Offeror’s approach to coordinating and monitoring the commencement, prosecution, and completion of work, and reporting to EFLHD.
Factor 3: Project Management and Controls.
Confidence Rating
Description / Indicators
High Confidence
The Government has high confidence that the Offeror understands the requirement, proposes a sound approach to project management and controls, and will be successful in performing the contract with little or no Government intervention.
Some Confidence
The Government has some confidence that the Offeror understands the requirement, proposes a sound approach to project management and controls, and will be successful in performing the contract with some Government intervention.
Low Confidence The Government has low confidence that the Offeror understands the requirement, proposes a sound approach to project management and controls, or will be successful in performing the contract even with Government intervention.
Factor 4 – Offeror’s Past Performance.
The Government will evaluate the Offeror’s past performance in the design and construction of roadway and sea wall construction based on the Offeror's performance record and reputation for satisfactorily completing projects similar in scope, size, and complexity.
1. The Offeror shall submit past performance evaluations from the owner agencies for projects included under Factor 1, indicating that quality work was completed on-schedule and within budget. Include any statements as to the Offeror's integrity, reasonable and cooperative conduct, and commitment to QA, QC, and customer satisfaction.
Provide evidence of performance with past and present customers, past and present subcontractors. In addition, provide evidence of past and present performance with Federal (Contractor Performance Assessment Reporting System - CPARS), State, and/or local government agencies. Submit a minimum of two (2) references. Include agency or firm’s name, point of contact name, email addresses and phone numbers, date work was performed, and nature of work. Should the Offeror not have any CPARS evaluations or similar past performance evaluations provided by agency or company for whom the work was performed, the Offeror must use the PAST PERFORMANCE EVALUATION QUESTIONAIRE provided. The Offeror must send the questionnaire and request the agency or company for whom the work was performed to send the evaluation to EFLHD.Contracts@dot.gov and include it in the Statement of Qualification package.
EFLHD reserves the right to retrieve any relevant past performance evaluations and/or CPARS, in the event additional information is deemed necessary to rate the Offeror.
Should the Offeror not have any CPARS evaluations or similar past performance evaluations at all, then an unknown confidence rating will be given.
Factor 4. Offeror’s Past Performance
Rating
Description / Indicators
High Confidence
The Government has high confidence that the Offeror understand the requirements and will be successful in performing the contract with little or no Government intervention based on the Offeror’s past performance in the construction of roadway and sea wall construction similar in scope, size, and complexity.
CPARS and/or past performance evaluations for the Offeror show ratings above Satisfactory or similar rating (i.e. above Meets Expectations).
Some
The Government has some confidence that the Offeror understand the requirements and will be successful in performing the contract with some Government intervention based on the Offeror’s past performance and experience in the construction of roadway and sea wall construction similar in scope, size, and complexity.
above Marginal or similar rating (i.e. above Needs Improvement).
Low
The Government has low confidence that the Offeror understand the requirements and will be successful in performing the contract even with Government intervention based on the Offeror’s past performance and experience in the construction of roadway and sea wall construction similar in scope, size, and complexity.
below Satisfactory or similar rating (i.e. below Meets Expectations).
Unknown
The Offeror does not have a record of relevant past performance or information on past performance is not available.
STEP 2 – PRICE PROPOSAL EVALUATION
COMPLETING THE PROPOSAL SCHEDULE
Complete the Proposal Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Proposal Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Proposal Total for each specific individual Schedule of Work by adding the amounts of the listed items and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, Offerors must submit prices for each pay item.
Review Subsection 109.03 of the Special Contract Requirements (SCRs) regarding scope of payment for direct and indirect payment work.
Fill in the Proposal Total(s) for each individual Schedule of Work as directed on the Price Proposal Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Price Proposal Summary Page B-12.
The Offeror’s Price Proposal is a combination of the completed Proposal Schedule (pages B-1 to B-11) and the completed Price Proposal Summary page (page B-12).
The amount in Block 17 of the SF 1442 should be completed as follows:
Schedule A - $
Schedule C - $
SCHEDULE OF WORK
The Proposal Schedule is comprised of the following:
Schedule A - Pages B-1 thru B-8
Schedule C – Pages B-9 thru B-11
COMPLETION OF WORK
The Government has estimated the performance period to complete all contract work from the effective date of the Notice to Proceed to contract completion for the various contract award scenarios. The maximum time allowed (i.e., the contact performance period) is shown in Block 11 of the SF-1442 and described below.
All work for Schedules A and C must be completed by no later than February 14, 2029.
In developing a construction schedule, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCRs).
Specific work limitations may be (but are not limited to): National legal holidays, special events, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc.); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc.); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc.). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCRs).
See Subsection 108.01 of the SCRs for additional details.
STEP 3 – BEST VALUE DETERMINATION
EFLHD intends to award a fixed price contract without discussions with offerors (except clarifications as described in FAR 15.202(b)); therefore, the offeror's technical and price proposal should be clear and complete and contain the offeror's best terms. The Government reserves the right to conduct discussions if later deemed necessary. The Government further reserves the right to reject any or all offers if such action is in the Government's best interest.
The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15.103-1. This process permits tradeoffs between price and technical “non-cost” factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative analysis and an integrated assessment of proposals against all source selection criteria in the solicitation.
All evaluation factors other than cost or price, when combined, are approximately equal in their importance when compared to cost or price. The Government is concerned with striking the most advantageous balance between technical merit (“quality”) and cost to the Government (i.e., the price). The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor. The Technical Proposal of the Offeror awarded the contract will be incorporated into the contract by reference and the Contractor shall be bound by its contents.
BID SCHEDULE
Source Selection Information – See FAR 2.101 and 3.104
Project No : VI DPC A34(1) Contract 2 Schedule : A
Project Name : Veterans Drive, Phase 2 Schedule Type : Base
Contract Quantity Pay Items
No Contract Quantity Pay Items
AMD# Line Item Number
Pay Item Number
Description Supplemental Description
Quantity Unit Unit Price Amount
A0100 15101-0000 MOBILIZATION ALL LPSM
A0110 67002-0000 PROJECT LUMP SUM (Environmental Remediation Plan) ALL CTSM $1,000.00 $1,000.00
A0120 15201-0000
CONSTRUCTION
SURVEY AND
STAKING
ALL LPSM
A0130 15401-0000 CONTRACTOR
TESTING
(Environmental Site Assessment(s)) ALL LPSM
A0140 15705-0100
SOIL EROSION
CONTROL, SILT
FENCE
950.000 LNFT
A0160 15705-2000
SOIL EROSION
CONTROL, FLOATING
TURBIDITY CURTAIN
4,800.000 LNFT
A0180 15706-1300
SOIL EROSION
CONTROL, INLET
PROTECTION TYPE C
75.000 EACH
A0200 15706-1500
SOIL EROSION
CONTROL, INLET
PROTECTION TYPE E
85.000 EACH
A0220 20103-0000 CLEARING AND
GRUBBING 31,858.000 SQYD
A0240 20301-0300 REMOVAL OF BOX
CULVERT
(CD-2) 2.000 EACH
A0260 20301-1400 REMOVAL OF INLET 16.000 EACH
A0280 20301-1500 REMOVAL OF LIGHT
POLE 10.000 EACH
A0300 20301-2800
REMOVAL OF
STRUCTURES AND
OBSTRUCTIONS
(SIGNAL CABINET)
1.000 EACH
A0320 20301-3100
REMOVAL OF UTILITY
POLE
(PEDESTRIAN
PEDESTAL
ASSEMBLY)
4.000 EACH
A0340 20301-3100 REMOVAL OF UTILITY
POLE
(SIGNAL POLES) 4.000 EACH
A0360 20302-0500 REMOVAL OF CURB,
CONCRETE 2,430.000 LNFT
A0380 20302-2100 REMOVAL OF PIPE
CULVERT 1,150.000 LNFT
A0400 20303-0300 REMOVAL OF
CONCRETE 35.000 SQYD
A0420 20303-3200
REMOVAL OF
SIDEWALK,
CONCRETE
1,775.000 SQYD
A0440 20303-3600 REMOVAL OF WALL 160.000 SQYD
A0460 20401-0000 ROADWAY
EXCAVATION 34,500.000 CUYD
A0480 20420-0000 EMBANKMENT
CONSTRUCTION 50,000.000 CUYD
B-1Bid Schedule Project: VI DPC A34(1) Contract 2, Veterans Drive, Phase 2
A0500 25701-0400
CONTRACTOR
FURNISHED
REINFORCED
CONCRETE
RETAINING WALL
DESIGN
ALL LPSM
A0520 30106-0500 SUBBASE GRADING A,
12-INCH DEPTH 16,000.000 SQYD
A0560 30902-1000
EMULSIFIED ASPHALT
TREATED
AGGREGATE BASE,
GRADING C
16,000.000 SQYD
A0600 40201-0100
ASPHALT CONCRETE
PAVEMENT,
MARSHALL MIX,
CLASS A
(GRADING B)
1,050.000 TON
A0620 40201-0300
ASPHALT CONCRETE
PAVEMENT,
MARSHALL MIX,
CLASS C
(GRADING D, TYPE 3
OR 4 PAVEMENT
ROUGHNESS) 1,800.000 TON
A0720 41301-0600
ASPHALT PAVEMENT
MILLING, 2-INCH
DEPTH
1,000.000 SQYD
A0740 50101-1000
MINOR CONCRETE
PAVEMENT,
REINFORCED, 10-
INCH DEPTH
(FIXTURE, KIOSK,
STAMPED
CONCRETE) 6,565.000 SQYD
A0760 50101-1000
MINOR CONCRETE
PAVEMENT,
REINFORCED, 10-
INCH DEPTH
(STAMPED
CONCRETE) 6,850.000 SQYD
A0780 50202-0000 SEALING JOINTS AND
CRACKS 11,600.000 LNFT
A0800 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
(BOAT RAMP)
100.000 CUYD
A0820 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
(BOLLARDS ONLY)
50.000 CUYD
A0840 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
(KINGS WHARF
RAMP) 20.000 CUYD
A0860 55201-0200
STRUCTURAL
CONCRETE, CLASS A
(AE)
(WALL COPING, DOES
NOT INCLUDE
BOLLARDS)
900.000 CUYD
A0880 55230-0000 CONCRETE COLOR
FINISH
(FIXTURE, KIOSK) 47.000 SQYD
A0900 55401-1000 REINFORCING STEEL (147 BOLLARDS
ONLY) 2,650.000 LB
A0920 55401-1000 REINFORCING STEEL (BOAT RAMP) 10,600.000 LB
A0940 55401-1000 REINFORCING STEEL (KINGS WHARF
RAMP) 3,100.000 LB
A0960 55401-1000
REINFORCING STEEL (WALL COPING, DOES
NOT INCLUDE
BOLLARDS)
63,000.000 LB
A0980 60101-0000 CONCRETE (SPEED TABLE) 75.000 CUYD
A1000 60201-0600 18-INCH PIPE
CULVERT 1,760.000 LNFT
A1020 60201-0800 24-INCH PIPE
CULVERT 750.000 LNFT
A1040 60201-0900 30-INCH PIPE
CULVERT 450.000 LNFT
A1060 60201-1000 36-INCH PIPE
CULVERT 455.000 LNFT
A1070 60201-1100 42-INCH PIPE
CULVERT 16.000 LNFT
B-2Bid Schedule
A1080 60221-1150
6 FEET SPAN, 3 FEET
RISE REINFORCED
CONCRETE BOX
CULVERT, SINGLE
BARREL
(CD-2)
50.000 LNFT
A1100 60401-0000 MANHOLE (J-7, >10 FEET) 5.000 EACH
A1120 60401-0000 MANHOLE (J-8, < 10 FEET) 3.000 EACH
A1130 60401-0000 MANHOLE (J-8, > 10 FEET) 1.000 EACH
A1140 60401-0000
MANHOLE (OIL/SUSPENDED
SOLIDS SEPARATOR)
(CONTECH CASCADE
SYSTEM CS-5)
2.000 EACH
A1160 60401-0000
MANHOLE (OIL/SUSPENDED
SOLIDS SEPARATOR)
(CONTECH CASCADE
SYSTEM CS-6)
2.000 EACH
A1180 60401-0000
MANHOLE (OIL/SUSPENDED
SOLIDS SEPARATOR)
(CONTECH CASCADE
SYSTEM CS-8)
1.000 EACH
A1200 60403-0000 INLET (CLOSED FLUME) 1.000 EACH
A1220 60403-0000 INLET (CURB, TYPE P-7, J
BOT, < 10 FEET) 13.000 EACH
A1240 60403-0000 INLET (CURB, TYPE J-7, J
BOT, < 10 FEET) 2.000 EACH
A1260 60403-0000 INLET (CURB, TYPE J-9, J
BOT, < 10 FEET) 3.000 EACH
A1280 60403-0000 INLET (CURB, TYPE J-5, J-
BOT, < 10 FEET) 10.000 EACH
A1300 60403-0000 INLET (CURB, TYPE J-6, J-
BOT, < 10 FEET) 3.000 EACH
A1320 60403-0000 INLET (CURB, TYPE P-5, < 10
FEET) 17.000 EACH
A1340 60403-0000 INLET (DT BOT, TYPE F, < 10
FEET) 3.000 EACH
A1350 60403-0000 INLET (CURB, TYPE J-6, J-
BOT, > 10 FEET) 1.000 EACH
A1360 60403-0000 INLET (DT BOT, TYPE F, J-
BOT, < 10 FEET) 4.000 EACH
A1380 60403-0000 INLET (DT BOT, TYPE G, < 10
FEET) 3.000 EACH
A1400 60403-0000 INLET (GUTTER, TYPE V, <
10 FEET) 4.000 EACH
A1420 60413-0000
TRENCH DRAIN (TRENCH DRAIN (ABT
INC., TFX12-12
INCHES)
343.000 LNFT
A1440 60901-1700 CURB, CONCRETE, 18
-INCH DEPTH
(TYPE D) 4,000.000 LNFT
A1460 60902-1000
CURB AND GUTTER,
CONCRETE, 12-INCH
DEPTH
(TYPE F)
3,700.000 LNFT
A1480 60905-1000 GUTTER, CONCRETE (VALLEY GUTTER) 450.000 LNFT
A1500 61102-4450
20-INCH WATERLINE,
POLYVINYL
CHLORIDE (PVC)
(WATER MAIN,
INCLUDING FITTINGS
& ACCESSORIES)
1,800.000 LNFT
A1520 61102-4700
24-INCH WATERLINE,
POLYVINYL
CHLORIDE (PVC)
(WATER MAIN
INCLUDING FITTINGS
& ACCESSORIES)
40.000 LNFT
A1540 61104-0200 VALVE, AIR RELEASE (COMBINATION
AIR/VACUUM VALVE) 1.000 EACH
A1560 61104-0400 VALVE, GATE (20-INCH) 4.000 EACH
A1580 61104-1100 VALVE, GATE, 24-INCH 4.000 EACH
A1600 61104-1400 VALVE, CHECK (PROCO 30-INCH,
STYLE 790) 3.000 EACH
B-3Bid Schedule
A1620 61104-1400 VALVE, CHECK (PROCO 36-INCH,
STYLE 790) 4.000 EACH
A1640 61110-1000 IRRIGATION SYSTEM ALL LPSM
A1660 61114-1500
WATER SYSTEM
ACCESSORY, TIE-IN
(24-INCH BY 20-INCH
CONNECTION TO
EXISTING MAIN)
2.000 EACH
A1670 61114-5000
WATER SYSTEM
ACCESSORY, CURB
STOP, 1-INCH
1.000 EACH
A1680 61202-4000 21-INCH SEWER LINE,
PLASTIC
(TRENCHLESS
RESTORATION) 1,100.000 LNFT
A1700 61501-0100 SIDEWALK,
CONCRETE
(4-INCH) 3,500.000 SQYD
A1720 61501-0100 SIDEWALK,
CONCRETE
(6-INCH) 4,000.000 SQYD
A1740 61505-2000 ACCESSIBILITY RAMP,
TIMBER
(PAVING, BRICK) 5,419.000 EACH
A1760 61506-2000 PAVING,
COBBLESTONE
(BY EUROCOBBLE®
WITH 1.5 MORTAR) 1,731.000 SQYD
A1780 61901-0000 FENCE (BOLLARD CHAIN) 1,850.000 LNFT
A1800 61901-1300 FENCE, CHAIN LINK (6 FEET STANDARD
HEIGHT) 865.000 LNFT
A1810 61902-0900 GATE, METAL 4.000 EACH
A1820 61904-0000
BOLLARD…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .