This document is Amendment No. 0001 to Federal Highway Administration solicitation 693C73-27-B-000002 for bridge maintenance and repair work at Acadia National Park in Maine. The amendment, effective October 26, 2026, revises contract requirements and project documentation without changing the bid opening date of Tuesday, November 10, 2026, at 2:00 p.m. EST. The solicitation covers reconstruction of asphalt concrete pavement and aggregate base course, placement of structural backfill, cleaning and debris removal from weepholes and joints, erosion repair, repointing mortar joints, waterproofing membrane placement, and miscellaneous work on three bridges: Paradise Hill Bridge (1700-010P), Maine Route 233 Bridge (1700-020P), and Frazer Creek Bridge (1700-025P).

The amendment makes three substantive changes: (1) revises Special Contract Requirements Subsection 107.01 to require compliance with the Maine Department of Transportation Region 4 Highway Opening Permit obtained by the Federal Highway Administration; (2) revises Subsection 156.06(d) to specify minimum lane widths of 9 feet for most roads except Eagle Lake Road/Maine State Route 233, which requires 11-foot minimum widths and 14 feet of vertical clearance; and (3) deletes Note #5 from Plan Sheet B01 and provides revised Plan Sheet B02 and updated Permit Tracking Form. The Maine Department of Transportation issued Highway Opening Permit R4-2627-042 (Record No. 163558) on October 20, 2026, valid from March 16, 2027, to July 31, 2027, specifying work conditions including one-way traffic maintenance, construction methods, backfill requirements, and trench restoration procedures. Interested bidders may submit written questions to eflhd.contracts@dot.gov, though questions submitted within 7 days of the bid opening may not receive timely responses.

View the file

Other files

File Type Posted
Amendment 0003 - ME NP ACAD BRG(2).pdf PDF
Amendment 0002 - ME NP ACAD BRG(2).pdf PDF
FP24_Eng.pdf PDF
ADV_Bidders Qualifications Form.docx DOCX document
IFB Solicitation - ME NP ACAD BRG(2).pdf PDF
Categorical Exclusion Form (NEPA).pdf PDF
VETS-4212 Form.pdf PDF
Plans - NP ACAD BRG(2).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

See continuation page

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

Attn: Acquisition and Contracts

ASHBURN VA 20147

EASTERN FEDERAL LANDS HIGHWAY DIVISION

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

SUITE E2-3-300

Attn: Construction

ASHBURN VA 20147

693C73

693C73

693C7327B000002

See Block 1410/26/2026

10/09/2026

1 10

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

693C7327B000002/0001

Project ME NP ACAD BRG(2):

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J

Pages) as follows:

a) Revise Special Contract Requirements

Subsection 107.01.

b) Revise Special Contract Requirements

Subsection 156.06(d).

2) Provide revised Plan Sheet B02.

3) Provide updated Permit Tracking Form, Highway Opening Permit.

The Bid Opening date of Tuesday, November 10, 2026, at 2:00 p.m. EST remains unchanged.

Interested bidders can send written questions or requests for clarification to:

eflhd.contracts@dot.gov. Questions submitted within 7 days of the bid opening due date may not be answered in time for the bidder to properly incorporate the responses into their bid.

Amendment No. 0001

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project ME NP ACAD BRG(2)

Acadia National Park

Solicitation: 693C73-27-B-000002

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) as follows:

a) Revise Special Contract Requirements Subsection 107.01.

b) Revise Special Contract Requirements Subsection 156.06(d).

2) Provide revised Plan Sheet B02.

3) Provide updated Permit Tracking Form, Highway Opening Permit.

The Bid Opening date of Tuesday, November 10, 2026, at 2:00 p.m. EST remains unchanged.

Interested bidders can send written questions or requests for clarification to:

eflhd.contracts@dot.gov. Questions submitted within 7 days of the bid opening date may not be answered in time for the bidder to properly incorporate the responses into their bid.

Changes to the Special Contract Requirement (J Pages) Sections:

1) Revise Subsection 107.01 of the Special Contract Requirements, page J-5, to:

107.01. Add the following:

Comply with the Maine Department of Transportation, Region 4, Highway Opening

Permit obtained by the Federal Highway Administration.

2) Revise Subsection 156.06(d) of the Special Contract Requirements, page J-13, to:

156.06(d). Delete the first sentence and substitute the following:

Provide minimum lane widths of 9 feet except for Eagle Lake Road/Maine State Route

233. Provide minimum lane widths of 11 feet and 14 feet of vertical clearance for Eagle

Lake Road/Maine State Route 233.

Changes to Plan Sheets:

1) Delete Note #5 from Plan Sheet B01.

L

Structure

C

NO SCALE

ROADWAY RECONSTRUCTION

MAINE ROUTE 233 BRIDGE (STRUCTURE 1700-020P)

204+75 TO 206+00

Roadway

CL

profile grade

Match existing

Match existing

Match existing

Existing concrete frame, 27-inch depth

Existing base material

Existing asphalt concrete pavement

Aggregate-topsoil, 4-inch depth, and turf establishment, see Note 2

Structure excavation, depth varies, see the Bridge Plan sheets and Note 4

Waterproofing membrane, see the Bridge

Plan sheets

Structural backfill (#57 stone), depth varies, see the Bridge Plan sheets and Note 4

8" Depth, Aggregate base, Grading C or D

Grass shoulder

Travel lane Travel lane Grass shoulder

EXISTING:

PROPOSED:

Limit of construction

Asphalt pavement removal

NOTES:

1. See the Bridge Plan sheets for additional bridge dimensions and proposed work.

2. Place aggregate-topsoil according to Section 313 and establish turf according to Section 625 on the shoulder within the bridge.

3. Place separation geotextile, woven, under the aggregate base and the aggregate-topsoil.

4. The typical section of the bridge shown is based at midspan. The depth of the structure excavation and the structural backfill will depend on the height of the arch.

5. Obtain a Highway Opening permit prior to placing lane closures or performing work below the Maine

Route 233 bridge according to Sections 107 and

156.

Structure excavation, depth varies, see the Bridge Plan sheets and Note 4

Structural backfill (#57 stone), depth varies, see the Bridge Plan sheets and Note 4

Separation geotextile, woven (Class 1, <50% elongation), see Note 3

7' Maximum

NEW ROADWAY DITCH BELOW

THE BRIDGE WEEPHOLES

1V:

2H abutment

Front face of bridge

Existing ground

1'

6" to 1'

Bridge weephole

Roadway excavation establish turf

Place topsoil and bridge wall (typical)

Stone masonry parapet/

Tack coat

Tack coat

6" Depth, Asphalt concrete pavement, Type 1, in three equal lifts

5' 5'

NO. DATE BY REVISIONS

OFFICE OF FEDERAL LANDS HIGHWAY

U.S. DEPARTMENT OF TRANSPORTATION

STRUCTURE 1700-020P

SCHEDULE B

ACADIA NATIONAL PARK

10/23/20261 DLH Deleted Note #5

AMENDMENT NO. 1 1

:1

A

M

O c to b e r

T y p ic a l

S e c ti o n

M

P R

O J E

C T

S \a c a d

\B R

G (2

H

W Y

D

E S

\C A

D D

\A m e n d m e n t_

\B

-B

M E

N P

A C

A D

B R

G (2 ty p

A M

E N

D M

E N

T

.d g n

TYPICAL SECTION

PROJECT

NUMBER

SHEET

B02

NPS No. 123/197365 PMIS No. 343503

ME NP ACAD BRG(2)

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .