Amendment 0002 - NP-BLRI 1L9 1M22.pdf
PDF 340 KB Posted
- Attached to
- REHABILITATE SECTIONS OF BLUE RIDGE PARKWAY IN VIRGINIA BLUE RIDGE PARKWAY - NP BLRI 1L9, 1M22
- Solicitation number
- 693C73-23-R-000003
About this file
This solicitation is for the design-build rehabilitation of approximately 24 miles of the Blue Ridge Parkway between mileposts 97 and 121 in Virginia. The Eastern Federal Lands Highway Division of the Federal Highway Administration, in cooperation with the National Park Service, will conduct a two-phase selection process to rehabilitate sections of asphalt concrete pavement, perform milling and resurfacing, complete asphalt pavement patching and drainage improvements, conduct scour and erosion analysis and design, perform minor bridge repairs, replace stone and asphalt curb and asphalt sidewalks, recondition ditches, and assess and recommend repairs to steel-back timber guardrail and stone masonry guardwalls. The estimated cost for the base contract and options is between $55-65 million. Phase one will include a request for qualifications due September 20, 2022 to shortlist up to three firms, with phase two involving a request for proposal.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amemdment 0001 - NP-BLRI 1L9 1M22.pdf | ||
| Draft RFP - NP-BLRI 1L9 1M22.pdf | ||
| Secure Transfer File - NP-BLRI 1L9 1M22.docx | DOCX document | |
| RFQ - NP-BLRI-1L9-1M22 - Final.docx | DOCX document | |
| Synopsis - NP-BLRI 1L9 1M22.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
NP-BLRI 1L9, 1M22
The purpose of this Amendment is to:
SEE ATTACHED
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK - ATTN: ACQUISITIONS
22001 LOUDOUN COUNTY PARKWAY, SUITE E2-3-300
ASHBURN, VA 20147
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK - ATTN: ACQUISITIONS
22001 LOUDOUN COUNTY PARKWAY, SUITE E2-3-300
ASHBURN, VA 20147
9A. AMENDMENT OF SOLICITATION NUMBER
693C73-23-R-000003
SEE BLOCK 14
1 3
09/20/2022
08/16/2022
Amendment 0002
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002 Project NP BLRI 1L9, 1M22
Rehabilitate Sections of Blue Ridge Parkway in Virginia Solicitation: 693C73-23-R-000003
The purpose of this Amendment is to:
1) Revise Appendix F of Draft RFP government furnished information.
Proposal due date remains September 29, 2022, at 2:00 pm EST.
Draft RFP changes Corrected estimated calendar days for Option 3 in Appendix F.
Bidders Questions
Question #1: RFQ Section ‘Design Work’ Part I includes a reference to utilizing ‘Blue Ridge Warranting methodology’. This methodology is not included in the RFQ documents or Draft RFP document. Please provide this methodology or an explanation of it so the DBT can properly account for project design elements and satisfy RFQ requirements.
Response: Document is provided in the SLFTS for this project. See the link for the documents.
Question #2: RFQ Section ‘Factor 2, Project Understanding and Approach’, Part 5 notes that ‘Proposals with completion dates prior to September 2025 will rank higher.’
a. Will Completion Dates provided by DBT in SOQ be required to be the same (or earlier) in the Phase Two RFP submission? There is often significant design and approach to means and methods adjustments that occur in Phase Two and determining a final project schedule is likely infeasible as part of the Step 1 process.
Response: Yes, the completion will remain the same in the Phase Two RFP submission.
b. Based on Draft RFP provided the RFP will be issued to shortlisted firms in October 2022 and NTP to selected/awarded DBT will occur at RFP + 34 weeks.
This roughly equates to NTP in May/June of 2023, the DBT would then have 27 or 28 months to complete all fieldwork/data acquisition, design, approvals, permitting, construction, and project closeout for 24 miles of roadway rehabilitation in a project location that will likely be subject to seasonal construction shutdown periods for certain activities (particularly asphalt paving).
Amendment 0002
Info Page 2 of 2
Has EFLHD reviewed this timeline for feasibility? Can EFLHD provide a proposed milestone schedule of the project?
Response: Yes, EFL has reviewed the timeline for feasibility. No, a project milestone will not be provided for this project. A schedule is part of the DBT’s proposal.
Question #3: RFQ Section ‘Factor 2, Project Understanding and Approach’, Part 4(b) presents a scenario wherein Government Options 1, 2, and 3 (Schedules B, C, and D) are awarded after award of the Base Contract. As these three options represent 14 miles of roadway rehabilitation (more than half the total project length) please provide further clarity on how long after award of the Base Contract these options could be awarded as this could greatly affect DBT’s approach to meeting the project schedule with regard to number of crews, phased construction approach, materials sourcing, staging/stockpile needs, and other considerations.
Response: Right to exercised Options 1, 2 and 3 area described in the Appendix F, 109.07 of the Government Furnished Information. The estimated calendar count for Option 3 was amended.
See the amended document.
Question #4: Please clarify the evaluation criteria for selection. The RFQ states ‘After receipt of the Phase Two Technical and Price Proposals, the CO will select the lowest priced/technical acceptable responsible offeror.’ This statement doesn’t indicate that a ‘best value’ analysis is being performed by EFLHD as part of the selection process but rather a low price with unknown emphasis being considered for the contents of the technical proposal. If this is not a best value analysis, please define what is considered a technically acceptable responsible offer.
Response: FAR 15.101 explains the Best Value Continuum and also explains the lowest price technically acceptable source selection process.
Question #5 The RFQ states that the Construction Quality Program Manager, however the abbreviation in RFQ is CQCM not CQPM. The role for this position states…
The Offeror’s authorized representative in charge of the construction work. At a minimum, the CQCM will coordinate all inspection needs per the contract, testing requirements in accordance with the FP-14, lead preparatory meeting, and daily reporting with test and inspection results to the CO and QPM. In addition to the experience described above, the CQCM must have experience performing technically the same or similar work on two (2) projects within the past ten (10) years involving the design and construction of complex multi-phased roadway projects using innovative/accelerated project design and construction methods. This individual shall be a licensed Professional Engineer.
Response: Acronym for the Construction Quality Program Manager should be CQCM.
*****Corrected Question (from Amendment 0001): Do the CPARS and performance evaluations count toward the 60-page limit?
Response: No, CPARS and performance evaluations are excluded from the 60-page limit.
| Amendment 2 Narrative.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0002 |
| Project NP BLRI 1L9, 1M22 |
| Rehabilitate Sections of Blue Ridge Parkway in Virginia |
| Solicitation: 693C73-23-R-000003 |
| Amendment 2 Narrative.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0002 |
| Project NP BLRI 1L9, 1M22 |
| Rehabilitate Sections of Blue Ridge Parkway in Virginia |
| Solicitation: 693C73-23-R-000003 |