Amemdment 0001 - NP-BLRI 1L9 1M22.pdf
PDF 244 KB Posted
- Attached to
- REHABILITATE SECTIONS OF BLUE RIDGE PARKWAY IN VIRGINIA BLUE RIDGE PARKWAY - NP BLRI 1L9, 1M22
- Solicitation number
- 693C73-23-R-000003
About this file
This amendment modifies a solicitation for design-build services to rehabilitate sections of the Blue Ridge Parkway in Virginia. The project consists of rehabilitating approximately 24 miles of roadway between mileposts 97 and 121, including asphalt resurfacing, drainage improvements, bridge repairs, guardrail replacement, and other work. The estimated cost ranges from $55-65 million. The amendment extends the proposal due date to September 29, 2022 and provides responses to questions from potential offerors. Up to three firms will be selected from qualified responses to participate in the second phase and proposal process. The Federal Highway Administration and National Park Service are conducting the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - NP-BLRI 1L9 1M22.pdf | ||
| Draft RFP - NP-BLRI 1L9 1M22.pdf | ||
| Secure Transfer File - NP-BLRI 1L9 1M22.docx | DOCX document | |
| RFQ - NP-BLRI-1L9-1M22 - Final.docx | DOCX document | |
| Synopsis - NP-BLRI 1L9 1M22.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
693C73
NP-BLRI 1L9, 1M22
The purpose of this Amendment is to:
SEE ATTACHED
693C73
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK - ATTN: ACQUISITIONS
22001 LOUDOUN COUNTY PARKWAY
ASHBURN, VA 20147
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
QUANTUM PARK - ATTN: ACQUISITIONS
22001 LOUDOUN COUNTY PARKWAY
ASHBURN, VA 20147
693C73-23-R-000003
SEE BLOCK 14
1 3
09/16/2022
08/03/2022
Amendment 0001
Info Page 1 of 2
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0001 Project NP BLRI 1L9, 1M22
Rehabilitate Sections of Blue Ridge Parkway in Virginia Solicitation: 693C73-23-R-000003
The purpose of this Amendment is to:
1) Provide summary of responses to questions/clarifications asked by potential Offerors.
2) Extend the proposal due date to September 29, 2022, at 2:00 pm EST.
Responses to Potential Offerors Questions
The following questions and issues were submitted to EFLHD at eflhd.contracts@dot.gov. The Government response or clarification is provided below:
Question: For Factor 2, Project Understanding and Approach, #2 asks to identify potential risk factors. Is the(re) a set number of risks that we are to identify? Are we held to say 2 or 3? Or is this up to the submitter?
Response: There is no set number of risks identified; it is up to the submitter to identify risk(s) as appropriate.
Question: Please confirm that item 2 of Factor 4 found on page 14 of the RFQ allows the Offeror to use the experience of a lower tier design subconsultant (identified in the SOQ) when presenting the Offeror’s past performance and experience.
Response: Correct. RFQ does allow Offerors to use experience of lower tier design subconsultants to present Offeror’s past performance experience. It is worth noting that under Factor 1 there is the obligation to keep the design team intact. Offerors shall obtain the Contracting Officer’s written consent before making any substitution for these designated in-house personnel, subcontractors, associates, or consultants.
Question: Do the CPARS and performance evaluations count toward the 60-page limit?
Response: Yes, CPARS and performance evaluations are considered part of the 60-page limit.
Question: Can one person be identified to fill more than one role?
mailto:eflhd.contracts@dot.gov
Amendment 0001
Info Page 2 of 2
Response: No. As stated under Factor 1 of the RFQ, key personnel cannot hold more than one position.
Question: For the CQCM and QPM roles: Can these two people be from the same subconsultant/independent firm?
Response: The CQCM and QPM can be from the same subconsultant/independent firms but must be different people.
| Amendment 1 Narrative.pdf |
| U.S. DEPARTMENT OF TRANSPORTATION |
| FEDERAL HIGHWAY ADMINISTRATION |
| EASTERN FEDERAL LANDS HIGHWAY DIVISION |
| Amendment No. 0001 |
| Project NP BLRI 1L9, 1M22 |
| Rehabilitate Sections of Blue Ridge Parkway in Virginia |
| Solicitation: 693C73-23-R-000003 |
File details come from the government source that posted it. Updated .