Amendment 0005 - NP-GWMP MVT(5).pdf
PDF 154 KB Posted
- Attached to
- George Washington Memorial Parkway Federal contract opportunity
- Solicitation number
- 693C73-23-B-000004
About this file
This amendment provides clarification regarding a solicitation for replacing two trail bridges on the George Washington Memorial Parkway. The solicitation seeks bids from certified Small Business Concerns to replace timber trail bridges numbers 24 and 25, reconstruct asphalt approaches, remove pavement, excavate roadways, lay asphalt concrete pavement, and complete other miscellaneous work. The total cost of the project is estimated between $2 million to $5 million. Questions were received from potential bidders and the amendment provides responses to inquiries such as considering alternative work plans that do not require 100% removal of existing piles so long as the contractor's plan demonstrates the capability to extract piles and receive approval from the Contracting Officer. Bids are due by November 29, 2022 at 2:00 PM Eastern Time as specified in the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-GWMP MVT(5).pdf | ||
| Amendment 0004 - NP-GWMP MVT(5).pdf | ||
| Amendment 0003 - NP-GWMP MVT(5).pdf | ||
| Amendment 0002 - NP-GWMP MVT(5).pdf | ||
| Amendment 0001 - NP-GWMP MVT(5).pdf | ||
| Geotechnical Report.pdf | ||
| IFB Solicitation - NP-GWMP MVT(5).pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| NPS Supplemental Specifications.pdf | ||
| Plans - NP-GWMP MVT(5).pdf | ||
| Categorical Exclusion Form (NEPA).pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212 Form.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7323B000004 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: Construction
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: Acquisitions
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1411/22/20220005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
10/05/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP GWMP MVT(5)
The purpose of this Amendment is to:
1. Provide a summary of responses to questions/clarifications asked by potential bidders.
2. The bid opening due date of November 29, 2022 at 2:00 p.m. EST will remain the same.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0005
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0005
Project NP-GWMP MVT(5)
George Washington Memorial Parkway
Solicitation: 693C73-23-B-000004
The purpose of this Amendment is to:
1. Provide a summary of responses to questions/clarifications asked by potential bidders.
2. The bid opening due date of November 29, 2022 at 2:00 p.m. EST will remain the same.
Request for Proposal Changes
The following questions and issues were submitted to EFLHD at eflhd.conracts@dot.gov. The
Government response or clarification is provided. Due to the repetitive nature of several questions and issues, the wording of the questions may have been revised and some questions have not been included. The Government’s direct response to the sender may also have been updated below for better clarity.
1. Will EFLHD consider an alternative workplan that does not include 100% removal of the existing piles? Is it acceptable to install helical piles adjacent to the existing pile within the 12.57SF LOD?
Response: Mark existing timber pile location to removal. Install helical piles at the same location as existing timber piles. Submit a removal and installation plan that demonstrates the capability to vertically extract the existing pile to the CO for review and approval at least 10 days prior to construction. If the total removal of the existing timber piles is not practical due to existing site conditions, submit an alternative removal and helical pile installation plan to the CO for approval. Helical piles may be installed adjacent to the existing piles within the allowable 12.57SF limit of disturbance if there are no other reasonable alternatives for removal and as approved by the CO.
../../../../../../../natr/1e10/Proj_Dev/Eng_Coord/3Advertisement/Amendments/Amendment%201/Final%20Documents/eflhd.conracts@dot.gov