Results of Bid Opening - NP-GUIS 15(3).pdf
PDF 97 KB Posted
- Attached to
- Gulf Islands National Seashore
- Solicitation number
- 693C73-21-B-000014
About this file
This document summarizes a bid opening for a federal construction contract. The bid opening was held on July 22, 2021 and received two bids for Gulf Islands National Seashore Project NP-GUIS 15(3) under solicitation number 693C73-21-B-000014. The project scope involves reconstructing a one lane entrance portion of Park Road, constructing paved shoulders, replacing guardrail, and other miscellaneous work. The project is split into multiple schedules that can be awarded individually or together, with the total cost estimated between $1,000,000 to $5,000,000. Central Southern Construction Corp provided the highest bid of $4,997,028.60, while Kovilic Construction Company, Inc. bid $4,127,320.60. The engineer's estimate was $4,110,000.00. The contract has a 204 day performance period if all schedules are awarded together, or 71 to 87 separate days for each schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - NP-GUIS 15(3).pdf | ||
| Amendment 0001 - NP-GUIS 15(3).pdf | ||
| 5320-001.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| 5320-002P.PDF | ||
| IFB Solicitation - NP-GUIS 15(3).pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212.pdf | ||
| GUIS 15(3) Signed CE.PDF | ||
| Plans - GUIS15(3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration
Eastern Federal Lands Highway Division
Bid Opening for
Gulf Islands National Seashore
PROJECT: NP-GUIS 15(3)
SOLICITATION NO. 693C73-21-B-000014
July 22, 2021 at 2:00 p.m. EST
Ashburn, Virginia
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-21-B-000014
Project: NP-GUIS 15(3)
July 22, 2021, 2:00 p.m. EST
BIDDER’S BID TOTALS DAYS TOTAL PRICE
Central Southern Construction
Corp.
SCHEDULE A
$1,735,836.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,616,869.60
SCHEDULE C (GOVERNMENT OPTION 2)
$563,060.00
SCHEDULE D (GOVERNMENT OPTION 3)
$1,081,263.00
SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3 =
$4,997,028.60
Kovilic Construction
Company, Inc.
SCHEDULE A
$995,291.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,699,179.60
SCHEDULE C (GOVERNMENT OPTION 2)
$533,837.00
SCHEDULE D (GOVERNMENT OPTION 3)
$899,013.00
SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3 =
$4,127,320.60
If the Government awards the contract as Schedules A + B + C + D, the performance period to complete all contract work will be 204 calendar days. If separate: Schedule A will be 71 calendar days; Schedule B will be 74 calendar days; Schedule C will be 40 calendar days; Schedule D will be 87 calendar days.
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-21-B-000014
Project: NP-GUIS 15(3)
July 22, 2021, 2:00 p.m. EST
BIDDER’S BID TOTALS DAYS TOTAL PRICE
SCHEDULE A
SCHEDULE B (GOVERNMENT OPTION 1)
SCHEDULE C (GOVERNMENT OPTION 2)
SCHEDULE D (GOVERNMENT OPTION 3)
SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3 =
ENGINEER’S ESTIMATE SCHEDULE A
$974,000.00
SCHEDULE B (GOVERNMENT OPTION 1)
$1,480,000.00
SCHEDULE C (GOVERNMENT OPTION 2)
$566,000.00
SCHEDULE D (GOVERNMENT OPTION 3)
$1,090,000.00
SCHEDULE A + OPTION 1 + OPTION 2 + OPTION 3 =
$4,110,000.00
If the Government awards the contract as Schedules A + B + C + D, the performance period to complete all contract work will be 204 calendar days. If separate: Schedule A will be 71 calendar days; Schedule B will be 74 calendar days; Schedule C will be 40 calendar days; Schedule D will be 87 calendar days.
File details come from the government source that posted it. Updated .