This solicitation is seeking sealed bids from certified Small Business Concerns for project NP-GUIS 15(3) located in Jackson County, Mississippi. The project consists of reconstructing Park Road and constructing paved shoulders at the Gulf Islands National Seashore. The work includes reconstructing the one lane entrance portion of Park Road, building paved shoulders, replacing guardrail, and other miscellaneous tasks. The project will be split into multiple schedules and contract options with a total cost expected between $1 million to $5 million. Bid documents were issued on May 6, 2021 with the bid due date and location specified on the SF1442 form in the solicitation. All bids are to be submitted through the System for Award Management database. Annual representations and certifications must also be completed online through required government systems. The selected bidder must be registered in SAM for payment processing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening - NP-GUIS 15(3).pdf | ||
| Amendment 0001 - NP-GUIS 15(3).pdf | ||
| 5320-001.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| 5320-002P.PDF | ||
| IFB Solicitation - NP-GUIS 15(3).pdf | ||
| FP14_Eng.pdf | ||
| VETS-4212.pdf | ||
| GUIS 15(3) Signed CE.PDF | ||
| Plans - GUIS15(3).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
693C7321B000014 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ASHBURN VA 20147
ATTN: CONSTRUCTION
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
ASHBURN VA 20147
ATTN: ACQUISITIONS
693C73
SUITE E2-3-300
QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
See Block 1407/07/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/06/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project NP-GUIS 15(3):
The purpose of this Amendment is to:
1) Remove the bridge rail from Pabst Road Bridge.
2) Provide revised B pages to reflect the revised quantities for Schedule D pay items
20302-0150, 55601-1300, and 61707-0000.
3) Add railroad right-of-way information to the plans.
4) Reschedule the bid opening date to July 22, 2021 at 2:00 P.M. EST.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0002
Info Page 1 of 1
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0002
NP-GUIS 15(3)
Gulf Islands National Seashore Reconstruction of the Entrance of Park Road and Construction of Paved Shoulders
Solicitation: 693C73-21-B-00014
The purpose of this Amendment is to:
1) Remove the bridge rail from Pabst Road Bridge.
2) Provide revised B pages to reflect the revised quantities for Schedule D pay items 20302-
0150, 55601-1300, and 61707-0000.
3) Add railroad right-of-way information to the plans.
4) Reschedule the bid opening date to July 22, 2021 at 2:00 P.M. EST.
Solicitation B Pages changes Revised quantities for Schedule D pay items 20302-0150, 55601-1300, and 61707-0000.
Plan Sheet changes Revised plan sheets A02, A03, C04, D05, D11, M01, M06, M12, R01, R02, R04, R05, and R06.
BID SCHEDULE INSTRUCTIONS
PROJECT: NP-GUIS 15(3)
BIDDERS PLEASE NOTE: Before preparing the bid, carefully read the Instructions to Bidders. While preparing the bid, comply with the following:
COMPLETING THE BID SCHEDULE
Complete the Bid Schedule(s) by handwriting in ink or typing. Specify a Unit Bid Price, in figures with cents to only two decimal places, for each pay item in the Unit Bid Price column for which a quantity is given. Do not enter or tender a Unit Bid Price for any pay item for which no estimated quantity appears in the Bid Schedule. Determine the products of the respective unit prices and quantities, and show them, in figures, in the Amount Bid column. If a Unit Bid Price and Amount Bid have been inserted by the Government for a pay item, do not change the Unit Bid Price and Amount Bid for the pay item. Determine the Bid Total for each specific individual Schedule of Work by adding the amounts of the listed items, and show in the block provided for that individual Schedule of Work. In case of multiplication errors, the Amount Bid for the item will be based on the Unit Bid Price.
To be eligible for award, bidders must submit prices for each pay item.
Review Subsection 109.05 of the FP (standard specifications book) regarding scope of payment for direct and indirect payment work.
Fill in the Bid Total(s) for each individual Schedule of Work as directed on the Bid Summary page. Fill in the Evaluation Total Price of Project in the space provided on the Bid Summary page.
The amount in Block 17 of the SF-1442 should be completed as follows:
Schedule A - $ .
Schedule B - $ .
Schedule C - $ .
Schedule D - $ .
SCHEDULES OF WORK
The Bid Schedule is comprised of the following separate schedules and options of work:
Schedule A (Base Contract) - Pages B-1 thru B-4 Schedule B (Government Option 1) - Pages B-5 thru B-7 Schedule C (Government Option 2) - Pages B-8 thru B-10 Schedule D (Government Option 3) - Pages B-11 thru B-12
The Government will award the project as a Base Contract (Schedule A) with the option to award Schedules B, C, and D (Government Options 1, 2, and 3); see FAR Clauses 52.217-4 and 52.217-5.
The purpose of the multiple schedules and options is to give the Government maximum flexibility in completing the project in a timely manner and at a cost-effective price, by proper utilization of programmed funds and upon receipt of any additional funds required to award the contract. If complete funding is in place at the time of award of Schedule A (Base Contract), the Government may award Schedules B, C, or D (Government Options 1, 2, or
3) at that time. If additional funding is required for the award of Schedules B, C, or D (Government Options 1, 2, or 3), and is received after the award of Schedule A (Base Contract), the Government has the right to exercise Schedules B, C, and D (Government Options 1, 2, and 3) at the unit prices bid no later than the completion date of Schedule A.
COMPLETION OF WORK
If the Government awards the contract as Schedules A + B + C + D all at the same time, the performance period to complete all contract work will be 204 calendar days.
If the Government awards the contract as Schedule A plus a combination of one or more of the Government Options, the performance period of the contract will be the total time of the individual performance periods of each awarded schedule as specified below. For example, if Schedules A + B + C are awarded, the performance period of the contract will be 185 calendar days (71+74+40).
Schedule A: 71 calendar days Schedule B: 74 calendar days Schedule C: 40 calendar days Schedule D: 87 calendar days
If any of the remaining Government Options are exercised after the award of the original contract, the number of calendar days specified above will become the performance period for that Government Option and will be added to the performance period of the original contract.
In developing a construction schedule to determine the number of calendar days, the Government considered and included the work limitations shown in Sections 108 and 156 of the FP and Special Contract Requirements (SCR’s). Specific work limitations may be (but are not limited to): National legal holidays, weekends, rush hours, night work, specified no work periods, work or traffic control phasing, etc. The Government also considered those work items that are weather sensitive and when those work items will be performed. Specific work items are (but not limited to): those that require a minimum ambient air temperature (asphalt paving and surface treatment, pavement striping, stone masonry, etc); those that require maintaining a minimum surface temperature (concrete pavement, structural concrete, painting, etc); and those that have specific planting seasons (turf establishment, sod, trees, plants, etc). The Government also considered time required for preparing material and drawing submittals, and the allowable Government review times for those submittals (Subsection 104.03 of the FP and SCR’s).
Bidders are to assume that the award of the contract and approval of the Contractor’s
Performance and Payment Bonds (see Block 12a of the SF-1442 and FAR Clause 52.228-
15) may result in the start of construction activities to be July, 2021. See Subsection 108.01 of the SCR’s for additional details.
BASIS FOR AWARD
The contract will be awarded to the responsive, responsible bidder with the lowest Evaluation Total Price of Project, which is defined as:
Schedule A (Base Contract) Bid Total + Schedule B (Government Option 1) Bid Total + Schedule C (Government Option 2) Bid Total + Schedule D (Government Option 3) Bid Total.
B - 1
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
2,360 LNFT $____________ $____________
A0100 15706-0200 SOIL EROSION CONTROL, CHECK DAM
2 EACH $____________ $____________
A0120 15720-0000 STORM WATER POLLUTION PREVENTION PLAN
ALL LPSM $___LPSM_____ $____________
A0140 20101-0000 CLEARING AND GRUBBING
2.30 ACRE $____________ $____________
A0160 20202-0000 SELECTIVE CLEARING
1,390 SQYD $____________ $____________
A0180 20220-1000 REMOVAL, INDIVIDUAL TREE
3 EACH $____________ $____________
A0200 20301-1400 REMOVAL OF INLET
2 EACH $____________ $____________
A0220 20301-2000 REMOVAL OF PIPE END SECTION
1 EACH $____________ $____________
A0240 20301-2400 REMOVAL OF SIGN
4 EACH $____________ $____________
A0260 20302-2100 REMOVAL OF PIPE CULVERT
80 LNFT $____________ $____________
A0280 20302-2200 REMOVAL OF SEWERLINE
15 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:NP-GUIS 15(3)
Project Name:Reconstruction and new shoulder construction on Park Road
B - 2
A0300 20302-2300 REMOVAL OF WATERLINE
30 LNFT $____________ $____________
A0320 20304-1000 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (TRAFFIC COUNTER BOX)
ALL LPSM $___LPSM_____ $____________
A0340 20401-0000 ROADWAY EXCAVATION
3,740 CUYD $____________ $____________
A0360 20425-1000 DITCH, EXCAVATION
65 LNFT $____________ $____________
A0380 25102-0200 PLACED RIPRAP, METHOD A, CLASS 2
50 TON $____________ $____________
A0400 30101-4000 AGGREGATE BASE GRADING C OR D
1,690 TON $____________ $____________
A0420 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (ASPHALT BINDER
PG 67-22 OR PG 70-22)
1,030 TON $____________ $____________
A0440 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (ASPHALT BINDER
PG 67-22 OR PG 70-22)
18 TON $____________ $____________
A0460 41102-1000 PRIME COAT, METHOD 1
5,370 SQYD $____________ $____________
A0480 41202-0000 TACK COAT
515 GAL $____________ $____________
A0500 60201-0500 15-INCH PIPE CULVERT
60 LNFT $____________ $____________
A0520 60201-0600 18-INCH PIPE CULVERT
17 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 3
A0540 60201-0900 30-INCH PIPE CULVERT
8 LNFT $____________ $____________
A0560 60202-0200 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
(USE ELLIPTICAL)
60 LNFT $____________ $____________
A0580 60210-0500 END SECTION FOR 15-INCH PIPE CULVERT
2 EACH $____________ $____________
A0600 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
4 EACH $____________ $____________
A0620 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
1 EACH $____________ $____________
A0640 60211-0600 END SECTION FOR 18-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT (USE ELLIPTICAL)
2 EACH $____________ $____________
A0660 60403-2200 INLET, FLH TYPE 7A
1 EACH $____________ $____________
A0680 61102-2950 6-INCH WATERLINE, POLYVINYL CHLORIDE (PVC)
40 LNFT $____________ $____________
A0700 61108-4000 ADJUST VALVE BOX (WATER)
2 EACH $____________ $____________
A0720 61202-0400 6-INCH SEWER LINE, PLASTIC
20 LNFT $____________ $____________
A0740 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
2.5 ACRE $____________ $____________
A0760 62501-0000 TURF ESTABLISHMENT
2.5 ACRE $____________ $____________
A0780 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
8,620 SQYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
B - 4
A0800 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A (DITCH LINING)
3,420 SQYD $____________ $____________
A0820 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING (WOOD POSTS)
11 SQFT $____________ $____________
A0840 63316-1000 REMOVE AND RESET SIGN
11 EACH $____________ $____________
A0860 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
9,730 LNFT $____________ $____________
A0880 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
75 EACH $____________ $____________
A0900 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
4 EACH $____________ $____________
A0920 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
A0940 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
80 LNFT $____________ $____________
A0960 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
130 SQFT $____________ $____________
A0980 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
540 HOUR $____23.40________ $_12,636___________
A1000 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
A1020 64620-1000 REMOVE AND RESET HISTORIC MARKER
1 EACH $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:A Schedule Type:Base
B - 5
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
8,720 LNFT $____________ $____________
B0100 20101-0000 CLEARING AND GRUBBING
2.65 ACRE $____________ $____________
B0120 20220-1000 REMOVAL, INDIVIDUAL TREE
2 EACH $____________ $____________
B0140 20301-2400 REMOVAL OF SIGN
4 EACH $____________ $____________
B0160 20302-2600 REMOVAL OF PAVEMENT MARKINGS
1,320 LNFT $____________ $____________
B0180 20401-0000 ROADWAY EXCAVATION
6,680 CUYD $____________ $____________
B0200 20410-0000 SELECT BORROW
4,350 CUYD $____________ $____________
B0220 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
4,170 SQYD $____________ $____________
B0240 20703-0000 GEOGRID (TYPE IV)
11,900 SQYD $____________ $____________
B0260 25102-0200 PLACED RIPRAP, METHOD A, CLASS 2
14 TON $____________ $____________
B0280 30101-4000 AGGREGATE BASE GRADING C OR D
2,380 TON $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
B - 6
B0300 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (ASPHALT BINDER
PG 67-22 OR PG 70-22)
1,310 TON $____________ $____________
B0320 41102-1000 PRIME COAT, METHOD 1
7,550 SQYD $____________ $____________
B0340 41202-0000 TACK COAT
655 GAL $____________ $____________
B0360 60412-1000 REMOVE AND RESET METAL FRAME AND GRATE
8 EACH $____________ $____________
B0380 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
2.8 ACRE $____________ $____________
B0400 62501-0000 TURF ESTABLISHMENT
2.8 ACRE $____________ $____________
B0420 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
10,300 SQYD $____________ $____________
B0440 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4
2,320 SQYD $____________ $____________
B0460 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING (WOOD POSTS)
16 SQFT $____________ $____________
B0480 63316-1000 REMOVE AND RESET SIGN
7 EACH $____________ $____________
B0500 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
14,900 LNFT $____________ $____________
B0520 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
110 EACH $____________ $____________
B0540 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
6 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Options
B - 7
B0560 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
B0580 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
220 LNFT $____________ $____________
B0600 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
470 SQFT $____________ $____________
B0620 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
544 HOUR $_____23.40_______ $_12,729.60___________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:B Schedule Type:Options
B - 8
C0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
2,230 LNFT $____________ $____________
C0100 20101-0000 CLEARING AND GRUBBING
0.65 ACRE $____________ $____________
C0120 20220-1000 REMOVAL, INDIVIDUAL TREE
50 EACH $____________ $____________
C0140 20302-2600 REMOVAL OF PAVEMENT MARKINGS
110 LNFT $____________ $____________
C0160 20401-0000 ROADWAY EXCAVATION
1,790 CUYD $____________ $____________
C0180 20410-0000 SELECT BORROW
780 CUYD $____________ $____________
C0200 20701-1000 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 2, TYPE E
800 SQYD $____________ $____________
C0220 20703-0000 GEOGRID (TYPE IV)
2,290 SQYD $____________ $____________
C0240 30101-4000 AGGREGATE BASE GRADING C OR D
710 TON $____________ $____________
C0260 40101-0200 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/8-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (ASPHALT BINDER
PG 67-22 OR PG 70-22)
285 TON $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
B - 9
C0280 40101-1000 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3 MILLION ESAL (ASPHALT BINDER
PG 67-22 OR PG 70-22)
230 TON $____________ $____________
C0300 41102-1000 PRIME COAT, METHOD 1
2,250 SQYD $____________ $____________
C0320 41202-0000 TACK COAT
195 GAL $____________ $____________
C0340 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
0.75 ACRE $____________ $____________
C0360 62501-0000 TURF ESTABLISHMENT
0.75 ACRE $____________ $____________
C0380 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
3,020 SQYD $____________ $____________
C0400 62901-1100 ROLLED EROSION CONTROL PRODUCT, TYPE 4
460 SQYD $____________ $____________
C0420 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING (WOOD POSTS)
6 SQFT $____________ $____________
C0440 63316-1000 REMOVE AND RESET SIGN
2 EACH $____________ $____________
C0460 63401-1500 PAVEMENT MARKINGS, TYPE H, SOLID
3,010 LNFT $____________ $____________
C0480 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
40 EACH $____________ $____________
C0500 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
6 EACH $____________ $____________
C0520 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
Bid Schedule Schedule:C Schedule Type:Options
B - 10
C0540 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
220 LNFT $____________ $____________
C0560 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
380 SQFT $____________ $____________
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:C Schedule Type:Options
B - 11
Amendment Item No. Pay Item No. Description Quantity Unit Unit Price Amount
D0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
0002 D0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
0002 D0060 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
D0080 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
5,850 LNFT $____________ $____________
D0100 20101-0000 CLEARING AND GRUBBING
0.70 ACRE $____________ $____________
D0120 20301-2400 REMOVAL OF SIGN
3 EACH $____________ $____________
0002 D0140 20302-0150 REMOVAL OF BRIDGE RAILING
310 LNFT $____________ $____________
D0160 20302-1400 REMOVAL OF GUARDRAIL, TIMBER
5,480 LNFT $____________ $____________
D0180 20403-0000 UNCLASSIFIED BORROW
200 CUYD $____________ $____________
D0200 20420-0000 EMBANKMENT CONSTRUCTION
200 CUYD $____________ $____________
0002 D0220 55601-1300 BRIDGE RAILING, TIMBER
310 LNFT $____________ $____________
0002 D0240 61701-4000 GUARDRAIL SYSTEM SBTB
4,800 LNFT $____________ $____________
0002 D0260 61702-1400 TERMINAL SECTION, TYPE SBT TANGENT
12 EACH $____________ $____________
0002 D0280 61707-0000 STRUCTURE TRANSITION RAILING
85 LNFT $____________ $____________
Bid Schedule Schedule:D Schedule Type:Options
B - 12
D0300 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
1.30 ACRE $____________ $____________
D0320 62501-0000 TURF ESTABLISHMENT
1.3 ACRE $____________ $____________
D0340 62901-0800 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D
705 SQYD $____________ $____________
D0360 63304-0900 SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING (WOOD POSTS)
21 SQFT $____________ $____________
D0380 63316-1000 REMOVE AND RESET SIGN
8 EACH $____________ $____________
D0400 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
110 EACH $____________ $____________
D0420 63502-1500 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE A
6 EACH $____________ $____________
D0440 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
2 EACH $____________ $____________
D0460 63503-0300 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
220 LNFT $____________ $____________
D0480 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
470 SQFT $____________ $____________
D0500 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
470 HOUR $_23.40_______ $10,998.00____
Submitted by:____________________________________ Schedule Total:____________
Bid Schedule Schedule:D Schedule Type:Options
B - 13
BID SUMMARY
Project NP-GUIS 15(3)
(1) Schedule A (Base Contract) Bid Total (from Page B-4) = (1) $____________________
(2) Schedule B (Government Option 1) Bid Total (from Page B-7) = (2) $____________________
(3) Schedule C (Government Option 2) Bid Total (from Page B-10) = (3) $____________________
(4) Schedule D (Government Option 3) Bid Total (from Page B-12) = (4) $____________________
Total Price of Project (for evaluation purposes only)
EVALUATION TOTAL PRICE OF PROJECT = (1) + (2) + (3) + (4) $____________________
Maximum Time Allowed for the Contract if all Schedules are Awarded at the Same Time
If the Government awards the contract as Schedules A + B + C + D, the performance period to complete all contract work will be 204 calendar days.
Maximum Time Allowed for Each Schedule of Work if Awarded Separately
If the Government awards the contract as Schedule A only, the performance period to complete all Schedule A work will be 71 calendar days and will start on the effective date of Schedule A’s Notice to Proceed.
If Schedule B (Government Option 1) is exercised after the award of the original contract, the performance period to complete all Schedule B work will be 74 calendar days and will start on the effective date of Schedule B’s Notice to Proceed.
If Schedule C (Government Option 2) is exercised after the award of the original contract, the performance period to complete all Schedule C work will be 40 calendar days and will start on the effective date of Schedule C’s Notice to Proceed.
If Schedule D (Government Option 3) is exercised after the award of the original contract, the performance period to complete all Schedule D work will be 87 calendar days and will start on the effective date of Schedule D’s Notice to Proceed.
R01
-J u n -2
1:
P M
M
P R
O J E
C T
S g u is (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n th
GENERAL NOTES AND INDEX
Field verify all dimensions.
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.
Construction:
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
GENERAL NOTES:
Design:
AASHTO LRFD Bridge Design Specifications, 8 Edition, 2017
SPECIFICATIONS:
A C
T U
A L F I L E R
G U I S
G N .D
G N
SCOPE OF WORK:
Schedule D
Install new bridge railing at structure 5320-001P and 5320-002P.2.
Remove existing bridge railing at structure 5320-001P and 5320-002P.1.
No scale
Timber:
MATERIALS:
Furnish Southern Pine No.1.
arsenic and/or chromium compounds. Obtain all timber from a single approved source.
Use waterborne copper-based suspension containing micronized or dispersed copper that does not contain
Pressure treat all timber in accordance with the latest AWPA Standard U1. Provide use category UC4A timber.
Furnish Hollow Structural Section (HSS) conforming to ASTM A500, Grade B.
Furnish posts confroming to ASTM A992.
Structural Steel:
INDEX OF BRIDGE PLAN SHEETS
Structure Transition Railing
Bridge Railing - 2
Bridge Railing - 1
Old U.S. Route 90 Bridge - Plan
Pabst Road Bridge - Plan
General Notes and Index
SHEET NO. SHEET TITLE
1 6/24/21 OA
DELETE STRUCTURE 5320-001P
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
170922
136047 MS NP-GUIS 15(3)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
OA OA
DRAWN BY
George ChoubahCP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-1301
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
6 December 2020
R02
M
P R
O J E
C T
S g u is (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-J u n -2
1:
Notes:
To Park Entrance To Vistor Center
PLAN
CL CL
N
Bridge length: 210'-0"
PABST ROAD BRIDGE - PLAN
A C
T U
A L F I L E R
G U I S
P la n .D
G N
" = 1'-0"8
Schedule D Structure Number 5320-001P
215'-0" (5'-0" Max. post spacing) transition railing
Pay limit for structure
See Note 5 transition railing
Pay limit for structure
See Note 5
Abut. Pier
Construction baseline
CSX Railroad
215'-0" (Typ.)
Removal of bridge rail pay limits (See Note 1)
Pier
Bridge rail pay limits (See Note 2)
Abut.
Face of rail
Face of rail information.
5. See "STRUCTURE TRANSITION RAILING" sheet for more sheet for more information.
4. See "BRIDGE RAILING - 1" sheet and "BRIDGE RAILING - 2" right-of-way.
3. Perform all work without encroaching into CSX Railroad before ordering materials.
drawing of bridge railing layout and materials for approval
2. Submit procedure of installing bridge new railing and detail removal operations for approval.
Submit bridge railing removal plan before beginning any 1.
6/24/21 OA 1 DELETE SHEET R02
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
170922
136047 MS NP-GUIS 15(3)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
OA OA
DRAWN BY
George ChoubahCP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-1301
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
6 December 2020
R04
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
170922
136047 MS NP-GUIS 15(3)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
OA OA
DRAWN BY
George ChoubahCP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-1301
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
PARK ROAD RECONSTRUCTION
6 December 2020
M
P R
O J E
C T
S g u is (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-J u n -2
1:
Notes:
(See Note 4)
Anchor bolts
"2
Base PL 58
" x
1'-2" x 1'-23 "
See "Base Plate
Details" c u r b
E x is ti n g
Schedule D 5320-002P
5320-001P
Structure Number
SECTION A-A
Scale: 1" = 1'-0"
1'-2"
2" 2"10"
Top side
CL
Post W6 x 15
No Scale
FRONT VIEW
"2
"4
6"
L 78" x 3" SlotCL
CL
R
"4 31'-2" x 1'-2
" x 8 5Base PL
Top of base plate
SECTION VIEW
Anchor bolts
CL
1'-2"
4"6"4"Traffic side
TOP VIEW
CL
Slotted holes
" x 3"8
Post W6 x 15
(See Note 8)
5"5"4"5"
" Dia. holes8
BASE PLATE DETAILS
"4
Post W6 x 15
CL
(Typ.)
Rail splice
(Typ.)
2'-4"
5'-0" (Typ. & Max)
Post (Typ.)
5'-0" (Typ. & Max) 5'-0" (Typ. & Max)
Min
9" bridge joint
Existing CL
" = 1'-0"2 1Scale:
6" x 10" Timber rail block
4" Spacer
A
A
90° (Typ.)
projectio n (Typ.)
" Bolt4
"4 1HSS 4" x 4" x
6" x 10"
Timber rail under each hex nut (ASTM A563).
(ASTM A325, Type 1) w/ one washers
" hex bolts 8 5" dia. holes in HSS for 4
3L
" Horiz. slots in post flange and 4 1" x 14
3L
CL
CL
Grade 50)
(ASTM A572,
" 8 5Base PL
TYPICAL RAIL ELEVATION
nut and washer
(ASTM A307) w/ square neck bolts
" Dia. round head 4
E x is ti n g c u r b
BRIDGE RAILING - 1
A C
T U
A L F I L E R
G U I S
R a il D
T S .D
G N
As shown
Pay limit for structure transition railing = 21'-2" bolts
Anchor
B e n d of three posts and a maximum of eight posts per panel section.
12. Each HSS section between splices must connect to a minimum
Grade B.
11. Furnish HSS from structural steel conforming to ASTM A500,
10. Furnish post from structural steel conforming to ASTM A992.
exist.
" 16 1 9. Place epoxy mortar under base plates if gaps larger than plate as necessary to conform to curb face geometry.
8. Slope of curb may differ from what is shown. Adjust base
A572, Grade 50.
7. Furnish base plate from structural steel conforming to ASTM required test load.
provide adequate capacity if any of the tests do not meet the per 100 anchors installed). Perform corrective measure to
6. Test adhesive according to Subsection 556.03 (Test 3 anchors bond strength in tension, Nba, of 30 kips.
d. Submit selected anchor adhesive for approval with a basic
"4 3c. Minimum anchor embedment depth of 6 adhesive conforming to AASHTO M 235.
b. Embed fully threaded rods into concrete curb using anchor
a. Furnish nuts conforming to ASTM A563, Grade DH.
one hardened steel washer (ASTM F436) each.
to ASTM A193 B7 or ASTM A449 with one heavy hex nut and
" dia. anchor bolts, fully threaded rods, conforming 4 3 5. Furnish reinforcing steel in the curb before drilling.
Use nondestructive testing equipment to locate and avoid 4.
3. Galvanize all steel components conforming to AASHTO M 111.
pullout strength to the CO for approval.
locations and adhesive anchor test data to demonstrate panel lengths, splice locations, post placement, anchor bolt
Submit drawings showing Hollow Structural Section (HSS) 2.
materials.
Field verify dimensions before commencing work and ordering 1.
See "STRUCTURE TRANSITION RAILING" sheet for more information
1 6/24/21 OA DELETE STRUCTURE 5320-001P
R05
M
P R
O J E
C T
S g u is (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-J u n -2
1:
Notes:
CL
3"
CLL 34 8" Dia. holes in HSS and 3
" dia.
predrill holes 31
" deep in timber rail for 5 " x 8" lag screws
1'-2"1'-4"1'-4"1'-2" 2'-6"2'-6"
9" 8" Dia. holes
(Typ.)
8 2" x 11 " horiz. slotted holes (Typ.)
(adjacent to rail splice only)
CL
4" Dia. holes (Typ.)
5'-0"5'-0"
CL" ( Post to end 4 of timber rail, typ.)
CLC Post
" TUBES ELEVATION4
1HSS 4" x 4" x
Scale: 1" = 1'-0"
End of timber rail
6" x 10"
Timber rail timber rail (Typ.)
" Dia holes in 8
" = 1'-0"2 1Scale:
TYPICAL RAIL ELEVATION
HSS 4" x 4" x 14" tube
A
A
2'-4"
B
B
SECTION A-A
SECTION B-B SECTION C-C
C
C
"2
2" Dia. x 34" deep counterbore (Typ.)
2'-0"
3"
" bolts (typ.)8 3for
Drill & tap sleeve 6" 6" opening (typ.)
" Rail4 sleeve
Tube and CL
" dia. holes in tube.2 1Provide
" Dia hex bolt with hardened washer. 8 3 "8
3 "4
"8 51 "16
9 x "4 slot in rail
D
D
SECTION D-DRAIL SPLICE DETAIL
Post side of tube
Fabricate rail splice sleeve from 14" plate G
Typ.
galvanizing assure slip fit after
Grind all edges to slip fit after galvanizing (Typ.)
Size sleeve to provide
SLEEVE
Schedule D 5320-002P
5320-001P
Structure Number
As shown
(Typ.)
" x 8" lag screws 8
PLAN VIEW - POST
PLAN VIEW - POST
Top side
"8 5Base PL
"4 31"4
SleeveCL
CL
of post flange slots on traffic side
" Horiz. 4 1" x 14
3L and hex jam nut provide standard washer w/ hex nut tighten bolts to snug position and locations adjacent to rail splice hand and hex nut, (typ.); except at with standard washer, lock washer, " Dia. round head square neck bolt 4
CL Post
BRIDGE RAILING - 2
A C
T U
A L F I L E R
G U I S
R a il D
T S .D
G N
8. Provide timber rail conforming to Subsection 710.08.
7. Furnish post from structural steel conforming to ASTM A992.
A307.
Grade C, D, or DH. For all other fasteners conform to ASTM coupling nuts with a center stop conforming to ASTM A563,
6. Furnish hex bolts conforming to ASTM A325. Furnish hex sections of continuous lengths of HSS for a panel section.
minimum of three posts. Do not to exceed eight posts with
5. Provide sections of HSS rail lengths continuous over a
Grade B.
4. Furnish HSS from structural steel conforming to ASTM A500,
3. Galvanize all steel components conforming to AASHTO M 111.
pullout strength to the CO for approval.
locations and adhesive anchor test data to demonstrate panel lengths, splice locations, post placement, anchor bolt
Submit drawings showing Hollow Structural Section (HSS) 2.
materials.
Field verify dimensions before commencing work and ordering 1.
1 6/24/21 OA DELETE STRUCTURE 5320-001P
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
170922
136047 MS NP-GUIS 15(3)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
OA OA
DRAWN BY
George ChoubahCP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-1301
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
R06
M
P R
O J E
C T
S g u is (3
B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
REVISIONSNO. DATE BYNO. DATE BY REVISIONS
-J u n -2
1:
RAIL TRANSITION PLAN
RAIL TRANSITION ELEVATION
STRUCTURE TRANSITION RAILING
2'-6" 5'-0" 5'-0"2'-9"
2'-6"
2'-2"
1'-3"
Steel-backed timber splice
Transition rail plate
Steel Steel plate
(Typ.)
W6 x 20 Post
Pay limit for steel-backed timber structure transition railing
21'-2" timber bridge rail
Modified steel tube-backed tube-backed timber bridge rail
Pay limit for modified steel
Sleeve Sleeve cap
TRANSITION RAIL SPLICE DETAIL
Steel rail (See Detail E617-60A)
CL
A
A
CL
8" Dia. hole (Typ.)
4" Dia. hole
3""8 12'-33"9"9"3"
3'-9"1'-3"
5'-0"
"4
HSS 4" x 4" x " tube
B
B slip fit after galvanizing
Size sleeve to provide
Typ.
G
" plate4 1sleeve from
Fabricate rail splice galvanizing assure slip fit after
Grind all edges to
(Typ.)
"16
C Post
SECTION A-A SECTION B-B
SLEEVE
SLEEVE CAP DETAIL
4" PL
G
Rail
" (Typ.)4 3corners
" PL Cope 4
Rail
No scale
A C
T U
A L F I L E R
G U I S
S tr T r a n s R a il .D
G N
Schedule D 5320-002P
5320-001P
Structure Number guardrail, Type B
2'-6"
Bend location
Notes:
guardrail, Type B.
timber block. See Detail E617-60A, Steel-backed timber
" dia. holes in timber rail, steel post, and 4 3steel plate, and
" slot in 2 1" x 24
3neck bolts with plate washer and hex nut, a
" dia. round head square 8 5At each additional post provide 2 - 2.
materials.
Field verify dimensions before commencing work and ordering 1.
posts, see Note 2
Additional steel
CLC Post
1 6/24/21 OA DELETE STRUCTURE 5320-001P
NPS
NO.NO.
PMIS STATE PROJECT
NUMBER
SHEET
170922
136047 MS NP-GUIS 15(3)
PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY
OA OA
DRAWN BY
George ChoubahCP of
DATE BRP NO.BRIDGE PLAN SHEET
BRP-1301
EASTERN FEDERAL LANDS HIGHWAY DIVISION
FEDERAL HIGHWAY ADMINISTRATION
U.S. DEPARTMENT OF TRANSPORTATION
GULF ISLANDS NATIONAL SEASHORE
| GUIS15(3)_plans_Amendment_2.pdf |
| A02 |
| A03 |
| C04 |
| D05 |
| D11 |
| M01 |
| M06 |
| M12 |
| R01-R02_R04-R06 |
File details come from the government source that posted it. Updated .