This document provides details for a federal contract opportunity to perform pavement preservation work on approximately 53.40 miles of the Blue Ridge Parkway. The solicitation number is 693C73-20-R-000002 and seeks proposals to complete one of two alternative pavement preservation treatment methods: thin asphalt overlay or chip seal overlay with a fog seal layer. The work includes asphalt concrete patching, pavement markings, and other miscellaneous tasks, and must be completed by December 11, 2020. Offerors must submit qualifications related to their experience in one of the pavement preservation treatment methods. The total value of the contract is expected to be between $1,000,000 to $5,000,000. The solicitation will be issued on November 18, 2019 and bids are due on the date specified in Block 13a of the SF1442 form. The solicitation will provide further requirements regarding offeror qualifications. The Department of Transportation Federal Highway Administration is the contracting agency.

View the file

Other files

File Type Posted
Amendment 0001 - NP BLRI PVT PRES FY19.pdf PDF
5140-008P1594_Redacted.pdf PDF
5140-012P6375_Redacted.pdf PDF
VETS-4212 Form.pdf PDF
Plans - NP-BLRI PVT PRES FY19.pdf PDF
5140-007P1821_Redacted.pdf PDF
5140-133P4250_Redacted.pdf PDF
5140-015P2550_Redacted.pdf PDF
NEPA_CE.pdf PDF
5140-198P1594_Redacted.pdf PDF
RFP Solicitation NP-BLRI PVT PRES FY19(1).pdf PDF
5140-014P3188_Redacted.pdf PDF
5140-001P12750_Redacted.pdf PDF
5140-011P12750_Redacted.pdf PDF
5140-013P4250_Redacted.pdf PDF
5140-009P1417_Redacted.pdf PDF
5140-016P2125_Redacted.pdf PDF
ADV_Subcontracting Plan (Blank).doc DOC document
FP14_Eng.pdf PDF
ADV_Offeror's Qualifications Form.doc DOC document
5140-006P2125_Redacted.pdf PDF
5140-204T3188_Redacted.pdf PDF
5140-010P1275_Redacted.pdf PDF
5140-160P212_Redacted.pdf PDF
Road Inventory Program Report.pdf PDF
Synopsis_-_NP-BLRI_PVT_PRES_FY19.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE NO. 5140 205P

OTTER CREEK CAMPGROUND BRIDGE INSPECTION DATE: 11/2/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... NO. OF MAIN SPANS:

PRESTRESSED CONCRETE 1

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ ARCH - DECK 0

# OF BEAMS, MAIN SPAN: .. 0 STRUCT. TOTAL LENGTH: .. 37.3 FT (11.4 M)

DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 37.3 FT (11.4 M)

WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 36.0 FT (11.0 M)

ABUT. FOUNDATIONS: ........ UNKNOWN CURB TO CURB WIDTH: ..... 27.0 FT (8.2 M)

PIER FOUNDATION(S): ........ N/A YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... SKEW ANGLE: ..................... 0 °

NPS ROAD CLASS:

000000000000 / 00000

FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 2008-PRECAST CONCRETE ARCH BRIDGE INSTALLED.

3 - SPECIAL PURPOSE

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 60.63 (KM PT 98.65)

STATE: ................................. VIRGINIA LOCATION: 0.1 MILES FROM BRP (MP 60.4)

FACILITY CARRIED: ............ OTTER CREEK CAMPGROUND ROAD

FEATURE INTERSECTED: .. OTTER CREEK

STRUCTURE EVALUATION SUMMARY

This prestressed concrete arch bridge is in good condition overall, and only routine maintenance is required at this time. However, it does appear that some minor settlement of the arch has occurred. The vertical gap in the parapet walls over the centerline of the arch is closed at the top of the parapet, and up to 1" wide at the arch. It appears the east wingwalls have also settled slightly. These conditions will continue to be monitored during future inspection cycles.

It should also be noted that the parapet height does not meet the minimum height requirement of 2'-3". Consideration should be given to installing a guardrail system on top of the north parapet to meet current safety standards and help improve motorist safety.

INSPECTION TEAM: R. SILVESTRY, L. ELLIS

CONDITION ASSESSMENT:

REINALDO SILVESTRY, FIELD TEAM LEADER 703-404-6251

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140 205P

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

60.6 REMOVE VEGETATION GROWING IN WINGWALL JOINTS. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

REHABILITATION/RECONSTRUCTION

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

NO (TYPICALLY NEEDED WITHIN 5 YEARS)

REHAB. RECONSTR.

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

Consideration should be given to installing a guardrail system on top of the north parapet to meet current safety standards and help improve motorist safety.

FIELD INSPECTION REPORT STRUCTURE NO. 5140 205P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK N

DECK SLAB1. N

EXPANSION JOINTS2. N

WEARING SURFACE3. G

RIDEABILITY4. G

CURBS, SIDEWALKS, AND MEDIAN 5. G

PARAPETS AND/OR RAILINGS6. G

DRAINS AND DRAINAGE7. G

UTILITIES8. N

DEFLECTION AND/OR VIBRATION9. N

OTHER10. N

59. SUPERSTRUCTURE 7

BEARING DEVICES1. N

GIRDERS OR BEAMS2. N

ARCH(ES) OR SLAB(S)3. G

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. N

7. PAINT N

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. F

ALIGNMENT10. G

OTHER11. N

60. SUBSTRUCTURE 8

ITEM REFERENCE AND REMARKS

58.6 MINOR MAP AND TRANSVERSE CRACKING OF CONCRETE

PARAPETS. MINOR FLAKING OF PARAPET TOP COAT AT ISOLATED

LOCATIONS.

59.3,9 MINOR TRANSVERSE CRACKING OF ARCH UNDERSIDE AT MIDSPAN.

MINOR SETTLEMENT AT CENTERLINE OF ARCH RESULTING IN

WIDER OPENING OF PARAPET VERTICAL JOINT JUST ABOVE ARCH;

CLOSED AT TOP AND UP TO 3/4" WIDE AT ARCH; SOME ARCH UNITS

SETTLED MORE THAN OTHERS.

60.6,10 MINOR SETTLEMENT OF EAST WINGWALLS RESULTING IN GAPS UP

TO 1" WIDE AT BOTTOM, ADJACENT TO ARCH; MINOR VEGETATION

GROWING IN JOINTS.

60.11, 61.3 RUBBLE RIPRAP ALONG ALL WINGWALLS.

ABUTMENTS

11.

1 0.

9.

8.

7.

6.

5.

4.

3.

2.

1.

12. OTHER

SLOPE PROTECTION

SETTLEMENT OR DEFLECTION

EROSION AND/OR SCOUR

EXPANSION JOINTS

WEEP HOLES

WINGWALLS

FOUNDATIONS

BACKWALLS AND/OR BULKHEADS

CAPS AND/OR BEARING SEATS

PILE BENTS

BREASTWALLS OR COLUMNS N

N

N

N

N

G

G

N

G

F

G

N

PIER(S)

N 13. WALLS AND/OR COLUMNS

N 14. PILE BENTS

N 15. CAPS AND/OR BEARING SEATS

N 16. FOUNDATIONS

N 17. EROSION AND/OR SCOUR

N 18. SETTLEMENT OR DEFLECTION

N 19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 5140 205P

AND REMARKSITEM REFERENCE

61. CHANNEL 8

G 1. ALIGNMENT

G2. EROSION AND/OR SCOUR

G 3. CHANNEL PROTECTION

G 4. WATERWAY OBSTRUCTIONS

N 5. OTHER

SUFF ADEQUACY OF OPENING 6.

7. MEDNORMAL VELOCITY

7 FT. 8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

ROCK, STONES

222. APPROACHES 7

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

N

G

G

G

N

G

N

223. RETAINING WALL N

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1.

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 0

N N N

61.1 STREAM FLOW DIRECTED TOWARDS WEST END DUE TO SILT AND

GRAVEL ACCUMULATION AT EAST SIDE OF ARCH.

222.6 MINOR SETTLEMENT OF ALL APPROACH PARAPETS.

36.A NORTH PARAPET HEIGHT OF 2'-0" DOES NOT MEET CURRENT

SAFETY GUIDELINES OF 2'-3" FOR TRAFFIC BARRIERS.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE LOAD RATING STRUCTURE NO. 5140 205P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 25 23 42 38

HS 36 33 60 54

TYPE 3 32 29 53 48

TYPE 3S2 48 44 81 73

TYPE 3-3 61 55 103 93

DESIGN LOADING: UNKNOWN (HS20 ASSUMED - SEE REMARKS)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE

EVALUATION (MBE).

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 205P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY

(202) STRUCTURE NAME: .......... OTTER CREEK CAMPGROUND BRIDGE

(203) STRUCTURE KIND: ............1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 5140-205P

(205) NPS REGION: .................... 4 - SOUTHEAST

(206) ROUTE CODE NUMBER: ... 521

(207) ROAD SECTION NO: ..........205P

(208) NPS ROAD CLASS: ............ 3 - SPECIAL PURPOSE

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. JAMES R.

(211) PROJECT NO(S):

(212) DRAWING NUMBERS:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

513 - VIRGINIA (VA)

009 - AMHERST

161000010

OTTER CREEK

OTTER CREEK CAMPGROUN

5140205P0000000

0.1 MILES FROM BRP (MP 60

99.99 FT (99.99 M)

60.63 (KM PT 98.65)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

5 - PRESTRESSED CONCRETE

11 - ARCH - DECK

37.3 FT (11.4 M)

37.3 FT (11.4 M)

0 - UNKNOWN

0 - UNKNOWN

6 - N/A

6 - N/A

N - NOT APPLICABLE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE

B) TYPE MEMBRANE: ................. N - NOT APPLICABLE

C) TYPE PROTECTION:

0 - NONE

NO(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

0 - UNKNOWN (41) LOAD RESTRICTION:

A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 36.0 TONS (32.7 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 60.0 TONS (54.4 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 11/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE:

INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 205P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 37°34'32.90" (51) CURB TO CURB WIDTH: ........... 27.0 FT (8.2 M)

(17) LONGITUDE: ......................... 79°20'15.30" (52) DECK WIDTH: ............................ 36.0 FT (11.0 M)

(19) DETOUR LENGTH: ............... 0 MI (0 KM) (32) APPR. ROADWAY WIDTH: ........ 30.0 FT (9.1 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 4.0 FT (1.2 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 2300 (34) SKEW ANGLE: ............................ 0 °

(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 2530 (47) TOTAL HORIZ. CLEARANCE: .... 27.0 FT (8.2 M)

(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 6.4 FT (2.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 2 - MOUNTED ON PARAPET

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 3 - CONCRETE/STEEL

DESIGN TYPE: ........................ 3 - SIMPLE RAIL (joints at each

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 2.00 FT (0.61 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK: .................................N

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

8 - Stable; scour above top of fo

1 - MAINTENANCE

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

2008-PRECAST CONCRETE ARCH BRIDGE INSTALLED.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:79�20'15.30 http:37�34'32.90

APPENDIX STRUCTURE NO. 5140 205P

PHOTOGRAPHS STRUCTURE NO. 5140 205P

PHOTO #1 - LOOKING EAST TOWARD OTTER CREEK CAMPGROUND

FLOW

PHOTO #2 - NORTH SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING WEST

PHOTO #4 - TYPICAL MAP CRACKING OF CONCRETE PARAPETS;

SOUTH PARAPET SHOWN

STRUCTURE NO. 5140 205PPHOTOGRAPHS

PHOTO #5 - SETTLEMENT OF APPROACH PARAPETS; NORTH PARAPET

AT WEST APPROACH SHOWN

PHOTO #6 - VERTICAL CRACKING EXTENDING FROM CROWN OF ARCH

TO TOP OF DECK

STRUCTURE NO. 5140 205PPHOTOGRAPHS

PHOTO #7 - GENERAL UNDERSIDE VIEW LOOKING SOUTH; NOTE

SEDIMENT ACCUMULATION AT WEST END

PHOTO #8 - TYPICAL TRANSVERSE CRACKING OF ARCH UNDERSIDE AT

MIDSPAN; ARCH UNIT #6 SHOWN (PHOTO FROM 10/29/2014

INSPECTION REPORT)

PHOTO #9 - GENERAL VIEW OF EAST

ABUTMENT

PHOTO #10 - SETTLEMENT OF SOUTHEAST

WINGWALLS RESULTING IN CLOSED GAP AT

TOP OF WINGWALL, ADJACENT TO ARCH

PHOTO #11 - UPSTREAM CHANNEL

PHOTO #12 - DOWNSTREAM CHANNEL

File details come from the government source that posted it. Updated .