5140-016P2125_Redacted.pdf

PDF 5 MB Posted

Attached to
Blue Ridge Parkway Pavement Preservation FY19
Solicitation number
693C73-20-R-000002
Issued by

About this file

This pre-solicitation notice seeks proposals for pavement preservation work on the Blue Ridge Parkway. The project consists of pavement preservation treatment on approximately 53.40 miles of roadway using either a thin asphalt overlay or chip seal with fog seal. Additional work includes asphalt patching and pavement markings. The project will be split into multiple schedules with a total cost estimated between $1-5 million. Proposals are due by the date specified in the solicitation to be issued on November 18, 2019. Offerors must submit qualifications related to their experience in thin overlay or chip seal treatments. The selected contractor must complete all work by December 11, 2020.

View the file

Other files

File Type Posted
Amendment 0001 - NP BLRI PVT PRES FY19.pdf PDF
5140-008P1594_Redacted.pdf PDF
5140-012P6375_Redacted.pdf PDF
VETS-4212 Form.pdf PDF
Plans - NP-BLRI PVT PRES FY19.pdf PDF
5140-007P1821_Redacted.pdf PDF
5140-133P4250_Redacted.pdf PDF
5140-015P2550_Redacted.pdf PDF
NEPA_CE.pdf PDF
5140-198P1594_Redacted.pdf PDF
RFP Solicitation NP-BLRI PVT PRES FY19(1).pdf PDF
5140-014P3188_Redacted.pdf PDF
5140-001P12750_Redacted.pdf PDF
5140-011P12750_Redacted.pdf PDF
5140-013P4250_Redacted.pdf PDF
5140-009P1417_Redacted.pdf PDF
ADV_Subcontracting Plan (Blank).doc DOC document
FP14_Eng.pdf PDF
ADV_Offeror's Qualifications Form.doc DOC document
5140-006P2125_Redacted.pdf PDF
5140-204T3188_Redacted.pdf PDF
5140-010P1275_Redacted.pdf PDF
5140-160P212_Redacted.pdf PDF
Road Inventory Program Report.pdf PDF
5140-205P2550_Redacted.pdf PDF
Synopsis_-_NP-BLRI_PVT_PRES_FY19.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE NO. 5140 016P

JAMES RIVER BRIDGE INSPECTION DATE: 11/1/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL:

CONCRETE

MAIN SPAN TYPE: ............... TEE BEAM

# OF BEAMS, MAIN SPAN: .. 4

DECK TYPE:

CONCRETE CAST-IN-PLACE

WEARING SURFACE: .......... BITUMINOUS

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L / SPRE

PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L

ABUTMENT / PIER MAT'L: ... CONCRETE

PROJ./PLAN REF. NO: ......... 1H3, 1H8 / 3012

NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD

STRUCTURE HISTORY: ...... 1984-JOINT REPAIR.

LOCATION

NO. OF MAIN SPANS:

NO. OF APPR. SPANS:

STRUCT. TOTAL LENGTH: ..

MAX. SPAN LENGTH:

DECK WIDTH:

CURB TO CURB WIDTH:

YEAR BUILT:

YEAR RECONSTRUCTED: ..

SKEW ANGLE:

FRACTURE CRITICAL:

1,045.0 FT (318.5 M)

100.0 FT (30.5 M)

33.0 FT (10.1 M)

26.0 FT (7.9 M)

N/A

0 °

NO

BLUE RIDGE PARKWAY MILE POINT: ..................... 63.64 (KM PT 102.06)

STA VIRGINIA LOCA TO VATE: ................................. TION: 2.0 MILES ROUTE 130

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. JAMES RIVER & U.S. ROUTE 501

STRUCTURE EVALUATION SUMMARY

This prestressed concrete beam bridge is a high preservation priority due to ongoing deterioration of structural elements and the projected costs associated with delaying corrective action. Problems with this bridge include misalignment and excessive rotation of the bridge rocker bearings, with several bearing assembly anchor bolts either missing or broken off due to movement. In addition, leakage through the expansion joints of this prestressed concrete girder structure has led to deterioration of the substructure concrete.

Additional problems include erosion along the southwest wingwall with moderate undermining of the wingwall. The Pier #7 web wall exhibits a severe vertical crack which will also continue to be monitored during future inspections.

Other problems include exposed rebar due to insufficient cover throughout the structure; missing and damaged railing hardware; and broken/missing metal toe plates for the pedestrian staircase.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

It should also be noted that a 2014 underwater inspection found that the horizontal faces of the Pier #3 and #4 footings were fully exposed. The pier web walls extend down flush with the top footing face and do not extend into the river bed. It should also be noted that the full vertical upstream face of Pier #4 footing is exposed along with a possible portion of the tremie seal. No undermining or undercutting was observed around the exposed portions of the footings.

INSPECTION TEAM: R. SILVESTRY, L. ELLIS

CONDITION ASSESSMENT:

REINALDO SILVESTRY, FIELD TEAM LEADER 703-404-6251

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

STRUCTURE SUMMARY

STRUCTURE EVALUATION SUMMARY CONTINUED

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140 016P

226 PRIORITY OF IMPROVEMENT B

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

58.7, 59.11, 61.4

REMOVE DEBRIS FROM UPSTREAM SIDE OF PIERS #2 AND #3. CLEAN CLOGGED

DECK DRAINS AS NECESSARY. REMOVE VEGETATION AND DEBRIS FROM

CURBLINES. REMOVE FLOOD DEBRIS FROM PEDESTRIAN BRIDGE.

1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

58.2,3 MILL & REPAVE WEARING SURFACE; CLEAN AND SEAL ALL

EXPANSION JOINTS. CLEAN AND RESEAL PEDESTRIAN BRIDGE

EXPANSION JOINTS.

1 LS

59.1 REPLACE MISSING BEARING ANCHOR BOLTS AT PIERS #3, #5, AND

#6, AND AT PIERS #2 - #4 FOR PEDESTRIAN BRIDGE.

1 LS

58, 59, 60,15

REMOVE UNSOUND CONCRETE FROM PIERS AND CAPS, CLEAN

REBAR, AND PLACE NEW CONCRETE TO ORIGINAL DIMENSIONS;

CLEAN EXPOSED REBAR THROUGHOUT STRUCTURE AND COAT

1 LS

60.9,17 REPAIR AND STABILIZE AREAS OF EROSION AND UNDERMINING AT

ABUTMENTS AND PIER #5.

1 LS $0

58.6, 59.11 REPLACE MISSING AND DAMAGED RAILING HARDWARE. REPAIR

METAL STAIR NOSINGS AT SOUTH END PEDESTRIAN STAIRCASE.

REPAIR MISSING MASONRY AT NORTH PEDESTRIAN APPROACH

1 LS

60.13 CLEAN AND SEAL CRACKING OF PIER WALLS AND COLUMNS. 1 LS

60.11 REPLACE MISSING STONE IN NORTH ABUTMENT SLOPE

PROTECTION; REPAIR UNDERMINING.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

A pier concrete study is recommended to determine full extent of deterioration.

FIELD INSPECTION REPORT STRUCTURE NO. 5140 016P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK 6

DECK SLAB1. F

EXPANSION JOINTS2. F

WEARING SURFACE3. F

RIDEABILITY4. F

CURBS, SIDEWALKS, AND MEDIAN5. F

PARAPETS AND/OR RAILINGS6. F

DRAINS AND DRAINAGE7. F

UTILITIES8. G

DEFLECTION AND/OR VIBRATION9. G

OTHER10. N

59. SUPERSTRUCTURE 5

BEARING DEVICES1. P

GIRDERS OR BEAMS2. F

ARCH(ES) OR SLAB(S)3. N

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. F

7. PAINT G

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. G

ALIGNMENT10. G

OTHER11. (PEDESTRIAN BRIDGE) F

60. SUBSTRUCTURE 5

ITEM REFERENCE AND REMARKS

ABUTMENTS

58.1 MINOR RANDOM CRACKING WITH EFFLORESCENCE ON DECK

UNDERSIDE; EXPOSED REBAR CHAIRS ON UNDERSIDE OF

OVERHANGS. MINOR SPALL ON UNDERSIDE OF WEST OVERHANG

AT NORTH ABUTMENT. MINOR SPALLING WITH EXPOSED REBAR IN

WEST BAY OF SPAN #7, ADJACENT TO BEAM #4. MINOR

HONEYCOMBING IN EAST BAY OF SPAN #10.

PLUG JOINT TORN ON PIER #5 (EAST END) AT CENTERLINE OF

ROAD, PIER #7 (EAST & WEST ENDS), PIER #9 (WEST END) OF

SOUTHBOUND LANE.

MINOR TRANSVERSE CRACKING WITH EFFLORESCENCE ON

PEDESTRIAN BRIDGE DECK SURFACE.

58.2,3 EXPANSION JOINTS OVER BOTH ABUTMENTS AND PIERS #2, #4, #6,

AND #8; SLIDING PLATE JOINTS OVER PIERS #1, #3, #5, #7, #9, AND

#10. ALL JOINTS PAVED OVER; MINOR TRANSVERSE CRACKING

OVER JOINTS. MINOR TO MODERATE RUSTING OF SLIDING JOINT

PLATES IN SIDEWALKS.

MODERATE LONGITUDINAL CRACKING OF WEARING SURFACE IN

SOUTHBOUND LANE; MINOR IN NORTHBOUND LANE AND ALONG

CENTERLINE. MODERATE DETERIORATION OF WEARING SURFACE

ALONG CURBLINES WITH PONDING. MODERATE DETERIORATION

OF WEARING SURFACE IN SPAN #1 ALONG CENTERLINE. MINOR TO

MODERATE MAP CRACKING OF WEARING SURFACE IN

SOUTHBOUND LANE OF SPANS #7 - #9.

58.4 SLIGHT BUMP AT APPROACHES DUE TO SETTLEMENT (SEE 222.4,6).

PEDESTRIAN DECK SURFACE UNEVEN AT JOINTS OVER PIERS #2,

#3, AND #5.

1. BREASTWALLS OR COLUMNS F

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS G

4. BACKWALLS AND/OR BULKHEADS G

5. FOUNDATIONS N

6. WINGWALLS F

7. WEEP HOLES G

8. EXPANSION JOINTS N

9. EROSION AND/OR SCOUR F

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION F

12. OTHER N

PIER(S)

F13. WALLS AND/OR COLUMNS

N14. PILE BENTS

F15. CAPS AND/OR BEARING SEATS

G16. FOUNDATIONS (CONCRETE FTG)

F17. EROSION AND/OR SCOUR

G18. SETTLEMENT OR DEFLECTION

N19. OTHER

AND REMARKSITEM REFERENCE

61. CHANNEL 7

G 1. ALIGNMENT

G2. EROSION AND/OR SCOUR

N 3. CHANNEL PROTECTION

F 4. WATERWAY OBSTRUCTIONS

N 5. OTHER

SUFF ADEQUACY OF OPENING 6.

7. MEDNORMAL VELOCITY

40 FT. 8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

SILT, ROCK, STONES

222. APPROACHES 6

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

N

F

F

F

G

G

N

223. RETAINING WALL N

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1.

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 0

N N N

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

58.5 MINOR SPALLING OF CURBS AT EXPANSION JOINTS OVER PIERS;

EXPOSED REBAR ON EAST CURB ADJACENT TO SPALL OVER PIER

#2. MINOR SPALLING WITH MODERATE DELAMINATION OF EAST

CURB FINISH COAT, SPAN #7 (1'X2') NEAR PIER #7. MINOR MAP

CRACKING WITH EFFLORESCENCE ON CURBS OVER PIERS #8 AND

#9.

WIDESPREAD MINOR MAP CRACKING OF SIDEWALKS. MODERATE

TRANSVERSE CRACKING OF APPROACH SIDEWALKS. MINOR

COVER SPALL ON EAST SIDEWALK IN SPAN #6.

MINOR PONDING ON SIDEWALKS ON SPANS 6, 7, & 8.

58.6 MINOR MAP CRACKING OF PARAPETS THROUGHOUT; MINOR

VERTICAL CRACKING AT RAIL POST LOCATIONS. MODERATE

VERTICAL CRACKING AND DELAMINATION OF APPROACH

PARAPETS. MINOR DELAMINATION AND SPALL ON WEST PARAPET

IN SPAN #9 AT PIER #8 (1'X1').

RAIL POST ANCHOR BOLT NUTS MISSING AT NORTH END, IN SPAN #1

OVER PIER #1, AND IN SPAN #8 OVER PIER #7, WEST RAILING.

LOOSE RAIL POST ANCHOR BOLT NUTS AT RAIL POST #1 AND #2 IN

SPAN #1, WEST RAILING. SHEARED RAIL POST ANCHOR BOLT AT

NORTH END, WEST RAILING. DETACHED BOTTOM RAIL IN SPAN #8

NEAR JOINT OVER PIER #7 AND SPAN #10 NEAR JOINT OVER PIER

#9, EAST RAILING. MINOR IMPACT DAMAGE TO TOP RAIL IN SPAN #8

OVER PIER #8, EAST RAILING.

ONE MISSING BOTTOM RAIL TO RAIL POST CONNECTION BOLT IN

SPAN #3 AT PIER #2 OF PEDESTRIAN BRIDGE WEST RAILING.

ISOLATED MISSING MASONRY AT NORTH APPROACH PARAPETS

FOR PEDESTRIAN BRIDGE. ONE BENT PEDESTRIAN RAILING

BALUSTER AT SOUTH END STAIRCASE, WEST RAILING AT THIRD

FLIGHT FROM BOTTOM.

58.7 MINOR ACCUMULATION OF DEBRIS AND VEGETATION GROWTH

ALONG CURBLINES; ISOLATED DECK DRAINS ARE CLOGGED.

SIGNS OF PONDING AT PIERS #4 & #5 (EAST SIDE), #7 (BOTH SIDES)

AND #9 (WEST SIDE).

58.8 UTILITY HATCH COVERS IN EAST SIDEWALK ARE MISSING ALL

HARDWARE AND HAVE BEEN WELDED SHUT.

ADDITIONAL ITEM REFERENCE AND REMARKS

59.1 BEARING DEVICES NOT ACCESSED DURING THIS INSPECTION.

FROM 2014 INSPECTION REPORT:

MINOR RUSTING OF BEAM #4 BEARING PLATE AT NORTH ABUTMENT. MINOR RUSTING OF BEARINGS UNDER

SLIDING PLATE EXPANSION JOINTS. BEARINGS AT PIERS #1 AND #5 FULLY CONTRACTED AT APPROXIMATELY

60°F. MISSING ANCHOR BOLT ON EAST SIDE OF BEAM #3 BEARING IN SPAN #3 AT PIER #3. ANCHOR BOLT NUT

NOT FULLY SEATED ON WEST SIDE OF BEAM #2 BEARING IN SPAN #4 AT PIER #4. MISSING ANCHOR BOLTS AT

BEAM #2 BEARING AND EAST SIDE OF BEAM #4 BEARING IN SPAN #6 AT PIER #5. THREE BEARING DEVICE

ANCHOR BOLTS HAVE BROKEN OFF AT PIER #6 (NOTED IN 2004 UBIV INSPECTION). BEAM #3 BEARING SOLE

PLATE IMPROPERLY INSTALLED IN SPAN #10 AT PIER #10.

MINOR TO MODERATE RUSTING OF BEARING PLATES FOR PEDESTRIAN BRIDGE; NUMEROUS SHEARED ANCHOR

BOLTS AT PIERS #2 - #4. BENT ANCHOR BOLT AT PIER #4.

59.2 EXPOSED REBAR CHAIRS ON UNDERSIDE OF SEVERAL BEAMS. MINOR VERTICAL CRACKING WITH

EFFLORESCENCE ON HAUNCHES FOR BEAMS #1 AND #2 IN SPAN #1 AND BEAMS #1 AND #4 IN SPAN #8.

HONEYCOMBING WITH EXPOSED REBAR ON BEAM #1 IN SPAN #8 AND BEAMS #1 - #3 IN SPAN #10. MINOR SPALL

WITH EXPOSED REBAR ON BEAM #1 IN SPAN #10 AT PIER #10. CONCRETE PATCHING ON UNDERSIDE OF BEAMS

#2 AND #3 IN SPAN #10.

MINOR SPOT RUSTING OF PEDESTRIAN BRIDGE BEAMS. MINOR DISTORTION OF ISOLATED BEAMS IN SPANS #3

AND #4 OF PEDESTRIAN BRIDGE, LIKELY DUE TO FLOOD DEBRIS IMPACT.

59.6 MINOR VERTICAL AND DIAGONAL CRACKING WITH MODERATE EFFLORESCENCE ON SEVERAL DIAPHRAGMS.

EXPOSED AND RUSTED REBAR CHAIRS THROUGHOUT UNDERSIDE OF MOST DIAPHRAGMS. MINOR SPALLING

WITH EXPOSED REBAR ON UNDERSIDE OF END DIAPHRAGMS AT PIERS #1 AND #3.

MINOR SPOT RUSTING OF PEDESTRIAN BRIDGE DIAPHRAGMS.

59.11 SEVERAL BENT HANGER RODS FOR PEDESTRIAN BRIDGE. MINOR RUSTING THROUGHOUT PEDESTRIAN BRIDGE

FLOOR BEAMS. MINOR FLOOD DEBRIS WEDGED BETWEEN DIAPHRAGMS/FLOOR BEAMS AND DECK IN SPANS #1

AND #2.

BROKEN/MISSING METAL STAIR NOSING ON ONE STEP AT SOUTH END STAIRCASE; NUMEROUS OTHER METAL

STAIR NOSINGS LOOSE. MINOR SPALL ON ONE STEP. PREVIOUSLY NOTED EROSION AT BASE OF STAIRWAY

FILLED WITH GRAVEL SINCE LAST INSPECTION.

60.1 MINOR FULL HEIGHT VERTICAL CRACKING OF BOTH ABUTMENT BREASTWALLS; MINOR HORIZONTAL CRACKING

WITH RUST STAINING ON SOUTH BREASTWALL. MINOR DELAMINATION OF NORTH BREASTWALL UNDER BEAM

#2. ONE EXPOSED REBAR ON NORTH BREASTWALL DUE TO INSUFFICIENT CONCRETE COVER. MODERATE

VEGETATION GROWTH ON SOUTH BREASTWALL, WEST SIDE AT TOP.

MINOR TO MODERATE CRACKING OF NORTH ABUTMENT BREASTWALL MASONRY MORTAR JOINTS FOR

PEDESTRIAN BRIDGE.

FIELD INSPECTION REPORT

ADDITIONAL ITEM REFERENCE AND REMARKS

60.4 MINOR HONEYCOMBING OF NORTH ABUTMENT BACKWALL BEHIND BEAM #4. MINOR VERTICAL CRACK WITH

EFFLORESCENCE ON NORTH ABUTMENT BACKWALL, WEST SIDE.

60.6 MINOR TO MODERATE RANDOM CRACKING WITH EFFLORESCENCE AND MINOR VINE GROWTH ON WINGWALLS.

MINOR SPALLING WITH EXPOSED REBAR DUE TO INSUFFICIENT CONCRETE COVER ON SOUTHEAST AND

NORTHWEST WINGWALLS. MINOR SPALL ON END OF SOUTHEAST WINGWALL. MODERATE ACCUMULATION OF

CUT TREE TOPS DISCARDED ALONG NORTHWEST WINGWALL.

UP TO 3FT UNDERMINING OF SOUTHEAST WINGWALL.

60.9 MINOR EROSION ALONG NORTHWEST WINGWALL. MODERATE EROSION ALONG WEST SIDE OF NORTH

ABUTMENT SLOPE PROTECTION; SEE ALSO 60.11. MODERATE EROSION (4'L X 1'W X 6"D) WITH UNDERMINING (4'

UNDER) OF SOUTHEAST WINGWALL. MODERATE SIZED ANIMAL BURROW ADJACENT TO SOUTHEAST WINGWALL.

60.11 MISSING STONE IN NORTH ABUTMENT SLOPE PROTECTION WITH MINOR UNDERMINING.

60.13 MODERATE VERTICAL CRACKING WITH MOISTURE STAINS AND EFFLORESCENCE ON PIER WALLS AND COLUMNS

AT PIERS #1 AND #6 - #10. MINOR SPALLING WITH EXPOSED REBAR ON PIERS #2, #3, #5, #8, AND #9;

WIDESPREAD ON WEST COLUMN OF PIER #5. MODERATE VEGETATION GROWTH ON PIERS #5, #9, AND #10;

ISOLATED VEGETATION GROWTH TRIMMED BACK SINCE LAST INSPECTION. SEVERE VERTICAL THROUGH

CRACK AT CENTERLINE OF PIER #7 WALL (1/2" W X FULL DEPTH) WITH MINOR TO MODERATE EDGE SPALLING

ALONG CRACK; MODERATE MAP CRACKING WITH EFFLORESCENCE AT TOP; MINOR DELAMINATION ON SOUTH

SIDE.

60.15 BEARING AREAS NOT INSPECTED DURING THIS INSPECTION. FROM 2014 INSPECTION REPORT:

MODERATE RANDOM CRACKING WITH EFFLORESCENCE ON BEARING AREAS AND SIDES OF CAPS; WIDESPREAD

STAINING DUE TO LEAKAGE THROUGH JOINTS. VEGETATION GROWTH ON EAST SIDE OF PIER #8 BEARING SEAT.

MINOR DELAMINATION OF NORTH FACE OF PIER #9 CAP UNDER BEAM #1.

MINOR TO MODERATE ACCUMULATION OF TIMBER DEBRIS ON TOP OF PIERS #1 AND #2. MINOR TO MODERATE

SPALLING OF NORTH FACE OF PIER #2 CAP, NORTH FACE OF PIER #6 CAP UNDER BEAM #1, AND SOUTH FACE OF

PIER #9 CAP.

WIDESPREAD MINOR TO MODERATE CRACKING WITH EFFLORESCENCE, DELAMINATION, AND SPALLING WITH

EXPOSED REBAR ON UNDERSIDE OF PIER CAPS. SEVERAL AREAS OF DELAMINATION OVERHEAD OF

PEDESTRIAN BRIDGE POSE A HAZARD TO PEDESTRIANS; SEVERAL AREAS REMOVED WITH SOUNDING HAMMER

AT TIME OF INSPECTION.

60.17 MODERATE EROSION ON BOTH SIDES OF PIER #5. FROM 2014 INSPECTION REPORT:

EMERGENCY UNDERWATER INSPECTION PERFORMED 10/14. PIER #2 FOOTINGS PARTIALLY EXPOSED. TOP

FACE OF PIERS #3 AND #4 FOOTINGS EXPOSED. UPSTREAM FACE OF PIER #4 UPSTREAM FOOTING EXPOSED, INCLUDING APPARENT CONCRETE OVERPOUR OR POSSIBLE PORTION OF TREMIE SEAL AT RIVER BOTTOM. PIER

#5 FOOTINGS NOT EXPOSED. NO UNDERMINING NOTED.

61.4 MODERATE DEBRIS ACCUMULATION AGAINST UPSTREAM SIDE OF PIERS #2 AND #3.

FIELD INSPECTION REPORT

ADDITIONAL ITEM REFERENCE AND REMARKS

222.4,6 MODERATE MAP CRACKING AND SETTLEMENT OF APPROACH PAVEMENT BEHIND APPROACH SLABS. MINOR

SETTLEMENT OF APPROACH SLABS ADJACENT TO ABUTMENTS. MODERATE DETERIORATION OF ASPHALT

PATCH IN NORTHBOUND LANE OF SOUTH APPROACH.

MINOR SETTLEMENT (3/4") OF NORTH APPROACH FOR PEDESTRIAN BRIDGE. MINOR PONDING AT NORTH

ABUTMENT

36.A BRIDGE RAILING HEIGHT OF 2'-4" DOES NOT MEET MINIMUM HEIGHT REQUIREMENTS OF 3'-6" FOR PEDESTRIAN

SAFETY BARRIERS.

STRUCTURE LOAD RATING STRUCTURE NO. 5140 016P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 8 7 15 14

HS 21 19 36 33

TYPE 3 14 13 25 23

TYPE 3S2 24 22 36 33

TYPE 3-3 27 24 40 36

DESIGN LOADING: H15 (M13.5)

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

X CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR BRIDGE

EVALUATION (MBE).

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 016P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 513 - VIRGINIA (VA)

(202) STRUCTURE NAME: .......... JAMES RIVER BRIDGE (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 019 - BEDFORD

(4) CITY/PLACE CODE:

(204) STRUCTURE NUMBER: ..... 5140-016P

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... JAMES RIVER & U.S. ROUTE

(207) ROAD SECTION NO: ..........016P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140016P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 2.0 MILES TO VA ROUTE 130

(210) OPERATING UNIT: ............. JAMES R. (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 1H3, 1H8 (11) MILE POINT: ............................. 63.64 (KM PT 102.06)

(212) DRAWING NUMBERS: ....... 3012 (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

04 - TEE BEAM

100.0 FT (30.5 M)

1,045.0 FT (318.5 M)

2 - SPREAD FTG ON BEARING MAT'L

3 - SPREAD FOOTING ON PILES

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

1 - CONCRETE CAST-IN-PLACE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS

B) TYPE MEMBRANE: ................. 0 - NONE

C) TYPE PROTECTION:

0 - NONE

NO(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

2 - H15 (M13.5) (41) LOAD RESTRICTION:

R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 21.0 TONS (19.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 36.0 TONS (32.7 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 11/16 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. YES

(221) SPECIAL STUDY DATE:

INSP. EVERY: 60 MONTHS - LAST INSP. : 10/14

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 016P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE:

(17) LONGITUDE:

(19) DETOUR LENGTH:

(28A) LANES ON STRUCT:

(28B) LANES UNDER STRUCT: ...

(42A) SERVICE ON:

(42B) SERVICE UNDER:

(29) AVG. DAILY TRAFFIC:

(30) YEAR OF ADT:

(114) FUTURE ADT:

(115) YEAR OF FUTURE ADT:

(101) PARALLEL STRUCTURE: ...

(38) NAVIGATION CONTROL?: ...

(39) VERTICAL CLEARANCE:

(40) HORIZ. CLEARANCE:

(111) ABUT. OR PIER PROT:

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 18.0 FT (5.5 M)

(56) LEFT: ......................... 0.0 FT (0.0 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK:

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL:

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0NNN

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

37°33'17.70"

79°22'11.50"

6 MI (10 KM)

5 - HIGHWAY-PEDESTRIAN

8 - HIGHWAY-WATERWAY

N - NONE

0.0 FT (0.0 M)

0.0 FT (0.0 M)

(51) CURB TO CURB WIDTH: ........... 26.0 FT (7.9 M)

(52) DECK WIDTH:

(32) APPR. ROADWAY WIDTH:

(213) APPR. PAVEMENT WIDTH:

LEFT SHOULDER:

RIGHT SHOULDER:

(33) BRIDGE MEDIAN:

(34) SKEW ANGLE:

(35) DECK FLARE?:

(47) TOTAL HORIZ. CLEARANCE:

(50) SIDEWALKS:

LEFT :

RIGHT :

(214) BRIDGE RAIL TYPE:

RAIL CONFIGURATION:

MATERIAL:

DESIGN TYPE:

(215) BRIDGE RAIL HEIGHT:

(53) MIN. VRT. CLEAR. OVER DECK:

(54) MIN. VRT. UNDERCLEARANCE:

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

33.0 FT (10.1 M)

30.0 FT (9.1 M)

22.0 FT (6.7 M)

4.0 FT (1.2 M)

4.0 FT (1.2 M)

0 - NO MEDIAN

0 °

NO

26.0 FT (7.9 M)

2.5 FT (0.8 M)

2.5 FT (0.8 M)

2 - MOUNTED ON PARAPET

2 - CONCRETE/ALUMINUM

3 - SIMPLE RAIL (joints at each

3.00 FT (0.91 M)

99.99 FT (99.99 M)

23.42 FT (7.14 M)

4 - Stable; action required to pro

2 - REHAB/RECONSTRUCTION

B - MAJOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1984-JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:79�22'11.50 http:37�33'17.70

APPENDIX STRUCTURE NO. 5140 016P

APPENDIX STRUCTURE NO. 5140 016P

PHOTOGRAPHS STRUCTURE NO. 5140 016P

FLOW

PHOTO #1 - LOOKING SOUTHBOUND TOWARD ROANOKE

PHOTO #2 - WEST (UPSTREAM) SIDE (PHOTO FROM 10/29/2014

INSPECTION REPORT)

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH

PHOTO #4 - POTHOLES IN WEARING SURFACE AT SPAN #3

STRUCTURE NO. 5140 016PPHOTOGRAPHS

PHOTO #5 - SHEARED RAIL POST ANCHOR BOLT AT NORTH END, WEST

RAILING; ALSO ANCHOR BOLT NUT MISSING (PHOTO FROM 10/29/2014

INSPECTION REPORT)

PHOTO #6 - DETACHED BOTTOM RAIL IN SPAN #8 NEAR JOINT OVER

PIER #7, EAST RAILING (PHOTO FROM 10/29/2014 INSPECTION

REPORT)

STRUCTURE NO. 5140 016P

PHOTO #7 - TYPICAL CLOGGED DRAIN; WEST

SIDE SHOWN

PHOTO #8 - TYPICAL ACCUMULATION OF

DEBRIS ALONG WEST CURBLINE

PHOTOGRAPHS

PHOTO #9 - TYPICAL TRANSVERSE CRACKING OF ASPHALT OVER

DECK EXPANSION JOINTS; NOTE ALSO TYPICAL RUSTING OF SLIDING

PLATES IN SIDEWALKS

PHOTO #10 - TYPICAL LONGITUDINAL AND TRANSVERSE CRACKING OF

WEARING SURFACE IN SOUTHBOUND LANE; SPAN #7 SHOWN

PHOTO #11 - ASPHALT PATCH PLACED SINCE

PREVIOUS INSPECTION AT SOUTH APPROACH;

NOTE ALSO TYPICAL TRANSVERSE

CRACKING ON APPROACH PAVEMENT

JAMES RIVER BRIDGE INSPECTION DATE: 11/1/16

STRUCTURE NO. 5140 016P

PHOTO #12 - TYPICAL VERTICAL CRACKING

AND SPALLING OF APPROACH PARAPETS

EXTENDING INTO CONCRETE CURB; WEST

PARAPET AT NORTH APPROACH SHOWN

PHOTO #13 - GENERAL UNDERSIDE VIEW OF SPAN #11 LOOKING

SOUTH

PHOTO #14 - TYPICAL FULLY CONTRACTED BEARING AT PIER # BEAM1;

#3 IN SPAN #1 SHOWN; ALSO NOTE ACCUMULATION OF TIMBER

DEBRIS ON TOP OF PIER (PHOTO FROM 10/29/2014 INSPECTION

PHOTO #15 - MISSING ANCHOR BOLT ON EAST SIDE OF BEAM #3

BEARING IN SPAN #3 AT PIER #3; ALSO NOTE TYPICAL RUSTING OF

BEARINGS (PHOTO FROM 10/29/2014 INSPECTION REPORT)

PHOTO #16 - BEAM #3 BEARING SOLE PLATE IMPROPERLY INSTALLED

IN SPAN #10 AT PIER #10 (PHOTO FROM 10/29/2014 INSPECTION

REPORT)

PHOTO #17 - TYPICAL SPALLING WITH EXPOSED REBAR ON

UNDERSIDE OF END DIAPHRAGMS AT PIERS #1 AND #3; NEAR BEARING

#2 FROM EAST SIDE SHOWN

PHOTO #18 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE VERTICAL

AND HORIZONTAL CRACKING WITH EFFLORESCENCE AND SOIL

STAINING DUE TO SEEPAGE

PHOTO #19 - UNDERMINING OF WINGWALL ADJACENT TO A BURROW

HOLE AT SOUTHEAST WINGWALL

PHOTO #20 - TYPICAL DELAMINATION AND SPALLING WITH EXPOSED

REBAR ON UNDERSIDE OF PIER CAPS; PIER CAP #9 SHOWN

PHOTO #21 - GENERAL VIEW OF PIER #10, SOUTH SIDE;

PHOTO #22 - TYPICAL VERTICAL CRACKING OF WEB WALL; PIER #10

SHOWN

PHOTO #23 - TYPICAL VERTICAL CRACKING

WITH MOISTURE STAINS AND

EFFLORESCENCE ON COLUMNS; EAST

COLUMN, PIER #7 SHOWN; NOTE VERTICAL

CRACKING WITH EFFLORESCENCE ON SPAN

END DIAPHRAGMS

PHOTO #24 - TYPICAL DIAGONAL CRACKING

WITH EFFLORESCENCE ON END DIAPHRAGM;

SOUTH END OF SPAN #3 SHOWN

STRUCTURE NO. 5140 016P

PHOTO #25 - TYPICAL DELAMINATION AND

SPALLING ON PIER COLUMNS; WEST COLUMN

OF PIER #9 SHOWN

PHOTO #26 - TYPICAL SPALLING OF COLUMN

WITH EXPOSED REBAR DUE TO INSUFFICIENT

COVER; WEST COLUMN OF PIER #5

STRUCTURE NO. 5140 016P

PHOTO #27 - FULL DEPTH VERTICAL CRACK AT

CENTERLINE OF PIER #7 WALL WITH EDGE

SPALLING ALONG CRACK; NOTE ALSO MAP

CRACKING WITH EFFLORESCENCE AT TOP OF

WALL

PHOTO #28 - CLOSE-UP VIEW OF PREVIOUS

PHOTO

PHOTO #29 - EROSION AT WEST SIDE OF PIER #5

PHOTO #30 - VERTICAL CRACKING AND VEGETATION ON NORTHEAST

WINGWALL

PHOTO #31 - UPSTREAM (WEST) CHANNEL

PHOTO #32 - DOWNSTREAM (EAST) CHANNEL

File details come from the government source that posted it. Updated .