This solicitation is for a pavement preservation project on the Blue Ridge Parkway. The National Park Service is seeking proposals for preservation of approximately 53 miles of pavement between Milepost 0.0 and 27.2, Milepost 37.5 and 45.3, and Milepost 46.1 and 64.5. Contractors may propose one of two methods: a thin asphalt overlay or a chip seal overlay with fog seal. The project will be split into multiple schedules with a total cost expected between $1 million and $5 million. Proposals are due by the date specified in Solicitation Number 693C73-20-R-000002. Offerors must demonstrate experience with one of the two pavement preservation methods. Construction must be completed by December 11, 2020.

View the file

Other files

File Type Posted
Amendment 0001 - NP BLRI PVT PRES FY19.pdf PDF
5140-008P1594_Redacted.pdf PDF
5140-012P6375_Redacted.pdf PDF
VETS-4212 Form.pdf PDF
Plans - NP-BLRI PVT PRES FY19.pdf PDF
5140-007P1821_Redacted.pdf PDF
5140-133P4250_Redacted.pdf PDF
5140-015P2550_Redacted.pdf PDF
NEPA_CE.pdf PDF
5140-198P1594_Redacted.pdf PDF
RFP Solicitation NP-BLRI PVT PRES FY19(1).pdf PDF
5140-014P3188_Redacted.pdf PDF
5140-001P12750_Redacted.pdf PDF
5140-011P12750_Redacted.pdf PDF
5140-013P4250_Redacted.pdf PDF
5140-009P1417_Redacted.pdf PDF
5140-016P2125_Redacted.pdf PDF
ADV_Subcontracting Plan (Blank).doc DOC document
FP14_Eng.pdf PDF
ADV_Offeror's Qualifications Form.doc DOC document
5140-204T3188_Redacted.pdf PDF
5140-010P1275_Redacted.pdf PDF
5140-160P212_Redacted.pdf PDF
Road Inventory Program Report.pdf PDF
5140-205P2550_Redacted.pdf PDF
Synopsis_-_NP-BLRI_PVT_PRES_FY19.doc DOC document
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STRUCTURE NO. 5140 006P

ROBINSON GAP BRIDGE INSPECTION DATE: 11/2/16

STRUCTURE SUMMARY

BRIDGE IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ....... NO. OF MAIN SPANS:

CONCRETE 1

MAIN SPAN TYPE: ............... NO. OF APPR. SPANS: ........ FRAME 0

# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 27.8 FT (8.5 M)

DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 27.8 FT (8.5 M)

WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 41.2 FT (12.6 M)

ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 31.0 FT (9.4 M)

PIER FOUNDATION(S): ........ N/A YEAR BUILT:

ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A

PROJ./PLAN REF. NO: ......... SKEW ANGLE: ..................... 30 °

NPS ROAD CLASS:

1F12-G17 / NONE

FRACTURE CRITICAL: ........ NO

STRUCTURE HISTORY: ...... 1981-JOINT REPAIR. 2009-INSTALLED STEEL-BACKED TIMBER RAILINGS.

1 - PRINCIPAL PARK ROAD

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 50.55 (KM PT 81.43)

STA VIRGINIA LOCA TO VATE: ................................. TION: 4.9 MILES ROUTE 60

FACILITY CARRIED: ............ BLUE RIDGE PARKWAY

FEATURE INTERSECTED: .. VA ROUTE 607

STRUCTURE EVALUATION SUMMARY

This concrete frame bridge is in good condition overall. Problems include random cracking of wearing surface on both lanes, transverse cracking of approach pavement, and large potholes in the underpass approach gravel surfacing. Additional problems include vegetation growth on the structure at all corners, and clearance signs located too close to the structure.

Corrective measures should be taken as outlined in this report to help prevent the possible development of more serious or costly problems in the future.

INSPECTION TEAM: R. SILVESTRY, L. ELLIS

CONDITION ASSESSMENT:

REINALDO SILVESTRY, FIELD TEAM LEADER 703-404-6251

REPORT REVIEW:

MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252

REPORT APPROVAL: DATE: 3/31/17

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140 006P

226 PRIORITY OF IMPROVEMENT D

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

222.4 REPAIR POTHOLES IN UNDERPASS ROADWAY. REGRADE APPROACHES FOR

UNDERPASS ROAD.

520 LS

60 PERIODICALLY REMOVE VEGETATION GROWTH ON AND AROUND STRUCTURE. 1 LS

222.7 RELOCATE UNDERPASS APPROACH CLEARANCE SIGNS. REPLACE DAMAGED

CLEARANCE SIGN. INSTALL TYPE 3 REFLECTIVE OBJECT MARKER SIGNS ALONG

UNDERPASS ROADWAY.

6 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

REHABILITATION/RECONSTRUCTION

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

NO (TYPICALLY NEEDED WITHIN 5 YEARS)

REHAB. RECONSTR.

58.3, 222.4 CLEAN AND SEAL CRACKING OF PAVEMENT OVER STRUCTURE

AND ON APPROACHES.

1 LS

59.3 CLEAN AND SEAL EXPOSED REBAR ON SLAB UNDERSIDE WITH

APPROVED PROTECTING COATING.

1 LS

CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL, AND

DESIGN CONSTRUCTION ENGINEERING (70% TOTAL REHAB COST)

PLUS PARK LOCATION FACTOR.

1 LS

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140 006P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

58. DECK N

DECK SLAB1. N

EXPANSION JOINTS2. N

WEARING SURFACE3. G

RIDEABILITY4. G

CURBS, SIDEWALKS, AND MEDIAN5. N

PARAPETS AND/OR RAILINGS6. G

DRAINS AND DRAINAGE7. G

UTILITIES8. N

DEFLECTION AND/OR VIBRATION9. N

OTHER10. (STRIPING) F

59. SUPERSTRUCTURE 7

BEARING DEVICES1. N

GIRDERS OR BEAMS2. N

ARCH(ES) OR SLAB(S)3. G

FLOOR BEAMS AND STRINGERS4. N

TRUSSES5. N

DIAPHRAGMS AND BRACING6. N

7. PAINT N

FASCIA(E)8. N

DEFLECTION AND/OR VIBRATION9. G

ALIGNMENT10. G

OTHER11. N

60. SUBSTRUCTURE 7

ITEM REFERENCE AND REMARKS

ABUTMENTS

58.3, 222.4 MINOR TRANSVERSE AND LONGITUDINAL CRACKING OF PAVEMENT,

PRIMARILY IN BOTH LANES.

58.6, 222.3 MINOR CHECKING OF TIMBER RAILS.

59.3 MINOR CRACKING OF SLAB UNDERSIDE ALONG CONSTRUCTION

JOINTS AND SIDES OF SLAB WITH EFFLORESCENCE. MINOR

DELAMINATION, AND HONEYCOMBING OF SLAB UNDERSIDE WITH

EXPOSED REBAR IN FEW LOCATIONS. MINOR RUST STAINING ON

SLAB UNDERSIDE FROM REBAR CHAIRS. MINOR VEHICLE SCRAPES

ON SLAB UNDERSIDE.

59.3, 60.6 MINOR HORIZONTAL AND VERTICAL CRACKING WITH

EFFLORESCENCE ALONG CONSTRUCTION JOINT BETWEEN SIDES

OF SLAB AND WINGWALLS.

60.1,6 MINOR CRACKING OF ABUTMENT BREASTWALLS ALONG TOP WITH

EFFLORESCENCE. MINOR VERTICAL CRACKING WITH

EFFLORESCENCE ALONG CONSTRUCTION JOINT BETWEEN

ABUTMENT BREASTWALLS AND WINGWALLS. MINOR SPALLING

OVER FORM TIES IN ABUTMENT BREASTWALLS AND WINGWALLS.

MINOR VEHICLE SCRAPE/GOUGE ON NORTH ABUTMENT

BREASTWALL AT WEST END. WIDESPREAD GRAFFITI ON

ABUTMENT BREASTWALLS. MINOR MOSS AND VEGETATION

GROWTH ON WINGWALLS.

60.9, 222.5 MINOR EROSION AT END AND ALONG NORTHWEST WINGWALL.

1. BREASTWALLS OR COLUMNS G

2. PILE BENTS N

3. CAPS AND/OR BEARING SEATS N

4. BACKWALLS AND/OR BULKHEADS N

5. FOUNDATIONS N

6. WINGWALLS G

7. WEEP HOLES G

8. EXPANSION JOINTS N

9. EROSION AND/OR SCOUR G

10. SETTLEMENT OR DEFLECTION G

11. SLOPE PROTECTION N

12. OTHER N

PIER(S)

N13. WALLS AND/OR COLUMNS

N14. PILE BENTS

N15. CAPS AND/OR BEARING SEATS

N16. FOUNDATIONS

N17. EROSION AND/OR SCOUR

N18. SETTLEMENT OR DEFLECTION

N19. OTHER

FIELD INSPECTION REPORT STRUCTURE NO. 5140 006P

AND REMARKSITEM REFERENCE

61. CHANNEL N

1. ALIGNMENT

2. EROSION AND/OR SCOUR

3. CHANNEL PROTECTION

4. WATERWAY OBSTRUCTIONS

5. OTHER

6. ADEQUACY OF OPENING

7. NORMAL VELOCITY

8. AVERAGE CLEAR OPENING

9. STREAM BED COMPOSITION :

222. APPROACHES 7

OTHER 9.

ALIGNMENT 8.

SIGNS7.

SETTLEMENT6.

EROSION5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

APPROACH SLABS 1. N

N

G

G

G

G

F

G

F

223. RETAINING WALL

(UNDERPASS ROADWAY)

N

OTHER6.

SETTLEMENT OR DEFLECTION5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

WALL1.

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAIL ENDSD.

APPROACH GUARDRAILSC.

TRANSITIONSB.

BRIDGE RAILINGSA. 1

222.7 14'-5" CLEARANCE SIGNS POSTED AT UNDERPASS APPROACHES

TOO CLOSE TO STRUCTURE. DAMAGED CLEARANCE SIGN AT WEST

APPROACH. NO POSTING SIGNS PROVIDED ON UNDERPASS ROAD

222.9 THREE POTHOLES (UP TO 2'-6" X 2'-6" X 2"D) IN EAST UNDERPASS

AND TWO IN WEST APPROACH GRAVEL SURFACING. MINOR

SETTLEMENT OF WEST UNDERPASS APPROACH GRAVEL

SURFACING; MINOR EDGE SPALLING OF FLOOR SLAB. MINOR

SCRAPES ON FLOOR SLAB. MINOR ACCUMULATION OF GRAVEL

AND DIRT ON FLOOR SLAB ALONG ABUTMENTS.

36.D RAIL ENDS ARE NOT TERMINATED SAFELY.

TRAFFIC SAFETY RATING CODES

N

Does not meet standards or a safety feature is required and none is provided.

Meets currently acceptable standards.

Not applicable or a safety feature is not required.

STRUCTURE NO. 5140 006P

INSPECTION DATE: 11/2/16

TRUCK TYPE

TONS

INVENTORY RATING (NORMAL TRAFFIC)

METRIC TONS METRIC TONSTONS

OPERATING RATING (MAXIMUM LOAD)

H

HS

TYPE 3

TYPE 3S2

TYPE 3-3

DESIGN LOADING:

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS:

CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

EXTERIOR WALL NEGATIVE MOMENT

8/15

X

X

STRUCTURE LOAD RATING

ROBINSON GAP BRIDGE

H20 (M18)

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 006P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY

(202) STRUCTURE NAME: .......... ROBINSON GAP BRIDGE

(203) STRUCTURE KIND: ............1 - BRIDGE

(204) STRUCTURE NUMBER: ..... 5140-006P

(205) NPS REGION: .................... 4 - SOUTHEAST

(206) ROUTE CODE NUMBER: ... 1

(207) ROAD SECTION NO: ..........006P

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD

(209) WITHIN NPS BNDRY?: ....... YES

(210) OPERATING UNIT: ............. JAMES R.

(211) PROJECT NO(S): ................ 1F12-G17

(212) DRAWING NUMBERS: ....... NONE

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE

(1) STATE:

(2) STATE HWY. AGENCY DIST:

(3) COUNTY CODE:

(4) CITY/PLACE CODE:

(5) INVENTORY ROUTE:

(6) FEATURES INTERSECTED:

(7) FACILITY CARRIED:

(8) STATE STRUCTURE NO:

(9) LOCATION:

(10) INV. RTE. - MIN. VERT. CLR: ..

(11) MILE POINT:

(27) YEAR BUILT:

(106) YEAR RECONSTRUCTED:

(20) TOLL:

(37) HISTORICAL DESIGNATION: ..

513 - VIRGINIA (VA)

009 - AMHERST

161000010

VA ROUTE 607

BLUE RIDGE PARKWAY

5140006P0000000

4.9 MILES TO VA ROUTE 60

99.99 FT (99.99 M)

50.55 (KM PT 81.43)

N/A

3 - FREE ROAD

5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

1 - CONCRETE

07 - FRAME

27.8 FT (8.5 M)

27.8 FT (8.5 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

6 - N/A

6 - N/A

N - NOT APPLICABLE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE

B) TYPE MEMBRANE: ................. N - NOT APPLICABLE

C) TYPE PROTECTION:

N - NOT APPLICABLE

YES(218) IS SALT USED?:

LOAD RATING AND POSTING

(31) DESIGN LOAD:

4 - H20 (M18) (41) LOAD RESTRICTION:

R - POSTED (OTHER)

(66) INVENTORY RATING: ...... 88.0 TONS (79.8 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 99.9 TONS (99.9 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 11/16 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE:

INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140 006P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 37°41'16.60" (51) CURB TO CURB WIDTH: ........... 31.0 FT (9.4 M)

(17) LONGITUDE: ......................... 79°19'45.90" (52) DECK WIDTH: ............................ 41.2 FT (12.6 M)

(19) DETOUR LENGTH: ............... 25 MI (40 KM) (32) APPR. ROADWAY WIDTH: ........ 30.0 FT (9.1 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 02 LEFT SHOULDER: .................. 4.0 FT (1.2 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 4.0 FT (1.2 M)

(42B) SERVICE UNDER: .............. 1 - HIGHWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 474 (34) SKEW ANGLE: ............................ 30 °

(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 521 (47) TOTAL HORIZ. CLEARANCE: .... 31.0 FT (9.4 M)

(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... N RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 8 - TIMBER/OTHER

DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 2.0 FT (0.6 M) (215) BRIDGE RAIL HEIGHT: ............ 2.25 FT (0.69 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 14.25 FT (4.34 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK: .................................N

(59) SUPERSTRUCTURE:

(60) SUBSTRUCTURE:

(61) CHANNEL: ..........................N

(62) CULVERT: ........................... N

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 1110

(75A) TYPE OF WORK:

(75B) WORK DONE BY:

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

N - Not over waterway.

2 - REHAB/RECONSTRUCTION

D - MINOR

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1981-JOINT REPAIR. 2009-INSTALLED STEEL-BACKED TIMBER RAILINGS.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:79�19'45.90 http:37�41'16.60

APPENDIX STRUCTURE NO. 5140 006P

PHOTOGRAPHS STRUCTURE NO. 5140 006P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD ROANOKE

PHOTO #2 - EAST SIDE

PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING SOUTH

PHOTO #4 - GENERAL UNDERSIDE VIEW LOOKING WEST; NOTE

VEHICLE SCRAPES

STRUCTURE NO. 5140 006PPHOTOGRAPHS

PHOTO #5 - TYPICAL LONGITUDINAL AND TRANSVERSE CRACKING OF

APPROACH PAVEMENT, NORTHBOUND LANE OVER SOUTH APPROACH

SHOWN

PHOTO #6 - TRANSVERSE CRACK OF NORTH APPROACH PAVEMENT AT

SOUTHBOUND LANE

PHOTO #7 - APPROACH RAILS NOT TERMINATED SAFELY, SOUTHWEST

END SHOWN

PHOTO #8 - GENERAL VIEW OF SOUTH ABUTMENT; NOTE GRAFFITI

PHOTO #9 - TYPICAL VEGETATION GROWTH ON WINGWALLS AND

BREASTWALLS, SOUTHEAST WINGWALL SHOWN

PHOTO #10 - SPALLING WITH EXPOSED REBAR IN SLAB UNDERSIDE,

NEAR SOUTH END AND WEST EDGE

PHOTO #11 - GENERAL VIEW OF UNDERPASS SLAB

PHOTO #12 - POTHOLES IN UNDERPASS ROAD AT WEST APPROACH;

CONDITION IS SIMILAR AT EAST APPROACH

STRUCTURE NO. 5140 006PPHOTOGRAPHS

PHOTO #13 - GENERAL VIEW OF NORTH ABUTMENT; NOTE

EFFLORESCENCE ALONG CONSTRUCTION JOINT BETWEEN

WINGWALL AND ABUTMENT BREAST WALL

PHOTO #14 - TYPICAL DIAGONAL CRACKING WITH EFFLORESCENCE AT

NORTHEAST CORNER OF SLAB AND WINGWALLS, NOTE ALSO TYPICAL

CRACKING ALONG CONSTRUCTION JOINT BETWEEN HEAD WALL AND

PHOTO #15 - COLLISION DAMAGE ON WEST

SIDE OF NORTH ABUTMENT BREASTWALL

ROBINSON GAP BRIDGE INSPECTION DATE: 11/2/16

STRUCTURE NO. 5140 006P

PHOTO #16 - VERTICAL CLEARANCE SIGN AT

EAST APPROACH

PHOTOGRAPHS

File details come from the government source that posted it. Updated .