Amendment 0001 - NP BISO 10(2).pdf

PDF 251 KB Posted

Attached to
Big South Fork National River and Recreation Area
Solicitation number
693C73-20-B-000012
Issued by

View the file

Other files

File Type Posted
Results of Bid Opening - NP-BISO 10(2).pdf PDF
BIP Cumb River Bridge 5130-001P.pdf PDF
ADV_Bidders Qualifications Form.doc DOC document
NEPA CE BISO 10(2).pdf PDF
IFB Solicitation - NP BISO 10(2).pdf PDF
PVT Rpt BISO 10(2).pdf PDF
VETS-4212 - Form - 2019.pdf PDF
BIP Bandy Creek Bridge 5130-002P.pdf PDF
Plans - NP BISO 10(2).pdf PDF
FP14_Eng.pdf PDF
Synopsis - NP-BISO 10(2).doc DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7320B000012 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

693C73

STERLING VA 20166-6511

21400 Ridgetop Circle

FHWA EASTERN FED LANDS DIVISION

Federal Highway Administration

693C73

STERLING VA 20166-6511

21400 RIDGETOP CIRCLE

FHWA EASTERN FED LANDS DIVISION

Federal Highway Administration

See Block 1404/07/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/16/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project NP BISO 10(2)

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) Section 429 to correct paver requirements.

The Bid Opening date of April 14, 2020, at 2:00 p.m. EST remains unchanged.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

TEL: EMAIL:

Amendment No. 0001

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0001 Project NP BISO 10(2)

Big South Fork National River and Recreation Area Rehabilitation of Leatherwood Ford Road

Solicitation: 693C73- 20-B-000012

The purpose of this Amendment is to:

1) Revise the Special Contract Requirements (J Pages) Section 429 to correct paver requirements.

The Bid Opening date of April 14, 2020, at 2:00 p.m. EST remains unchanged.

Bidders are reminded to submit any questions to eflhd.contracts@dot.gov. Questions submitted as within 3 days of the bid opening have the potential of not being answered with enough time for bidders to finalize their bids.

Special Contract Requirement changes:

1. Delete Subsection 429.05(a)(2), on page J-25 of the Special Contract Requirements (SCRs) and replace it with the following:

(2) Non-tracking hot applied polymer asphalt tack coat application (type B).

Furnish pavers conforming to Subsection 401.05(a).

File details come from the government source that posted it. Updated .