Results of Bid Opening - NP-SER PMS FY19(4).pdf
PDF 112 KB Posted
- Solicitation number
- 693C73-20-B-000004
About this file
This document contains the results of a bid opening for pavement preservation projects at two national parks. The Federal Highway Administration Eastern Federal Lands Highway Division received bids in response to Solicitation Number 693C73-20-B-000004 for work at Abraham Lincoln Birthplace National Historic Site and Fort Donelson National Battlefield. The project consists of thin overlay, chip seal, microsurfacing, asphalt patching, crack sealing, pavement marking, and other miscellaneous work, with an estimated price between $1 million and $5 million. Six contractors submitted bids ranging from $1,195,258.60 to $1,952,916.63. The engineer's estimate was $1,020,000. Performance time for the total project would be 120 days if awarded as a single contract, or 65, 25, 15, and 15 days for separate schedules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002_-_NP-SER_PMS_FY19(4).pdf | ||
| Amendment_0001_-_NP-SER_PMS_FY19(4).pdf | ||
| NEPA_(Categorical_Exclusion_Form).pdf | ||
| VETS-4212_-_Form_-_2019.pdf | ||
| IFB_Solicitation_-_NP-SER_PMS_FY19(4).pdf | ||
| FP14_Eng.pdf | ||
| ADV_Bidder's_Qualifications_Form.doc | DOC document | |
| Plans_-_NP-SER_PMS_FY19(4).pdf | ||
| Synopsis_-NP_SER_PMS_FY19(4).doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Federal Highway Administration Eastern Federal Lands Highway Division
Bid Opening for
Southeast Region Pavement Preservation
PROJECT: NP-SER PMS FY19(4)
SOLICITATION NO. 693C73-20-B-000004
November 14, 2019 at 2:00 p.m.
Sterling, VA
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-20-B-000004 Project: NP-SER PMS FY19(4)
November 14, 2019, 2:00 p.m. local time
BIDDERS BID TOTALS DAYS TOTAL PRICE
GC Works, Inc. SCHEDULE A SCHEDULE B $1,223,425.35 $425,377.04
SCHEDULE C SCHEDULE D
$129,170.70 $174,943.54
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,952,916.63
Howard W. Pence, Inc. SCHEDULE A SCHEDULE B $687,079.50 $374,656.62
SCHEDULE C SCHEDULE D
$75,386.80 $168,101.05
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,305,223.97
Construction Solutions Group SCHEDULE A SCHEDULE B $821,268.00 $295,093.00
SCHEDULE C SCHEDULE D
$56,924.30 $99,215.30
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,272,500.60
Central Southern Construction SCHEDULE A SCHEDULE B $1,201,240.00 $191,508.00
SCHEDULE C SCHEDULE D
$38,920.00 $54,187.80
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,485,855.80
If the Government awards the contract as Schedules A + B + C + D, the performance period will be 120 calendar days.
If separate: Schedule A will be 65 calendar days; Schedule B will be 25 calendar days; Schedule C will be 15 calendar days; Schedule D will be 15 calendar days
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BID OPENING for SOLICITATION NO. 693C73-20-B-000004 Project: NP-SER PMS FY19(4)
November 14, 2019, 2:00 p.m. local time
BIDDERS BID TOTALS DAYS TOTAL PRICE
Lee Construction Group, Inc. SCHEDULE A SCHEDULE B $752,994.00 $263,093.60
SCHEDULE C SCHEDULE D
$63,079.00 $116,092.00
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,195,258.60
Bryant’s Land & Development Industries, Inc.
SCHEDULE A SCHEDULE B
$819,004.00 $273,732.40
SCHEDULE C SCHEDULE D
$59,588.60 $113,291.60
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,265,616.60
SCHEDULE A SCHEDULE B
SCHEDULE C SCHEDULE D
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
Engineer’s Estimate SCHEDULE A SCHEDULE B $773,000.00 $182,000.00
SCHEDULE C SCHEDULE D
$19,000.00 $46,000.00
SCHEDULE A + SCHEDULE B +
SCHEDULE C + SCHEDULE D =
$1,020,000.00
If the Government awards the contract as Schedules A + B + C + D, the performance period will be 120 calendar days.
If separate: Schedule A will be 65 calendar days; Schedule B will be 25 calendar days; Schedule C will be 15 calendar days; Schedule D will be 15 calendar days
| Slide Number 1 |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000004� Project: NP-SER PMS FY19(4)�November 14, 2019, 2:00 p.m. local time � |
| �FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-20-B-000004� Project: NP-SER PMS FY19(4)�November 14, 2019, 2:00 p.m. local time � |