Plans_Adv.pdf
PDF 10 MB Posted
- Attached to
- Blue Ridge Parkway, Linn Cove Viaduct
- Solicitation number
- 693C73-18-R-000003
About this file
Plans
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_2_00002_-_NP-BLRI_2H14.pdf | ||
| Amendment_00001_-_NP-BLRI_2H14.pdf | ||
| Bridge_Insp_Report_5140-182P.pdf | ||
| Subcontracting_Plan_NP-BLRI_2H14.doc | DOC document | |
| VETS-4212.pdf | ||
| Certification_Program.pdf | ||
| RFP_Solicitation_-_NP-BLRI_2H14.pdf | ||
| ADV_Qualifications_Form.doc | DOC document | |
| NWND_Protocol.pdf | ||
| NEPA_Doc_CE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1-
O c t-
:5
P M
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
of
DATESCALECHECKED BYDRAWN BYDESIGNED BYREVISIONSNO. DATE BY REVISIONS NO. DATE BY
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
BLUE RIDGE PARKWAY
BRP NO.
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
NO. DATE BY REVISIONS NO. DATE BY REVISIONS
GENERAL NOTES AND INDEX
No Scale
GENERAL NOTES:
SCOPE OF WORK
on Federal Highway Projects, FP-14
Standard Specifications for Construction of Roads and Bridges
Provide 2" cover for reinforcing steel unless otherwise noted.
Furnish reinforcing steel conforming to AASHTO M31, Grade 60 deformed.
MATERIALS:
Reinforcing steel:
fy = 60,000 psi
Concrete:
Reinforcing Steel:
" unless otherwise dimensioned.4 3Chamfer exposed corners
DESIGN LOADING:
Live Load:
HS-20
All Concrete:
R01
SHEET TITLESHEET NO.
AR
INDEX OF BRIDGE PLAN SHEETS
Concrete Repair Details - 2
Concrete Repair Details - 1
Waterproofing Membrane and Miscellaneous Details
Expansion Joint Details
Typical Section
Plan and Elevation - 3
Plan and Elevation - 2
Plan and Elevation - 1
General Notes and Index
SPECIFICATIONS:
Design:
Construction:
AR/CV PCB
10. Install ledger angle at the north access door.
9. Place riprap at North Abutment, Pier 6, and Pier 7.
8. Replace missing hardware on the aluminum rails.
7. Install waterproofing membrane and place asphalt overlay.
6. Cut a joint between stone curb and concrete curb.
6. Remove and reset existing stone curbs as needed.
5. Repair concrete slab and seal cracks.
4. Remove and replace expansion joints.
2. Remove the existing waterproofing membrane (burlap or fiberglass) using hydrodemolition.
1. Micro mill existing 2 inches asphalt overlay.
with 2016 Interim revisions.
AASHTO LRFD Bridge Design Specifications, Seventh Edition 2014 in 24 hours and able to develop a compressive strength of 5,000 pounds per square inches
28 days compressive strength f'c = 7,000 pounds per square inches
Furnish High Early Strength (HES) concrete with a minimum
All stationing and elevations are in feet (ft).
All dimensions are in feet (ft) unless otherwise noted.
A C
T U
A L F I L E R
P
R A B
L R I
H
G N .D
G N
R02
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
PLAN AND ELEVATION - 1
1" = 20'
N
277+
278+00
+00
0+
18'-1"
15'-3"
CLPier 1
17'-0" = 68'-0"
4 Spa. @
15'-3" 17'-0" = 51'-0"
3 Spa. @
13'-6" 8'-6
68'-
0" 8 Spa
'-3
"15 '-3
8' -6 8' -0
S pa
CL
Pi er
Begin Bridge
Elev. 4402.76
Sta. 276+75.67
500'
V .P .C
S ta
E le v .9
V .P .I
S ta
E le v .8
V .P .T
S ta
E le v .1
-2.44%
-1.9%
NO SCALE
PROFILE GRADE
V. C.
Bridge
Sta. 277+77
St a.
(Typ.)
P .S S ta .4
P .S .C
S ta
.4
C u r v e N o
P .C .S . S ta . 2
.2
C u rv e N o . 1
S
ta. 2
.5
M atch
Lin e A
C u rv e N o ground line @
Approximate existing
CL
Profile grade
PLAN
ELEVATION
CL
Pier 1
Pier 2
StructureCL
Lenth of Bridge: 1248'-10"
"4 16'-4
Concrete curb repair
9'-0"Lx4"Wx2"D
9'-0"
Concrete curb repair
5'-0"Lx4"Wx2"D
21'-0"
Concrete curb repair
2'-0"Lx4"Wx2"D
'-1
Concrete curb repair
1'-0"Lx4"Wx2"D
64'-10"
51'-2"
1'-0" Curb stone repair
1'-0" Curb stone repair
C u rb
C u rb
12'-10"
11'-0"
Note:
AR 2
25' -0"
21'-6"
Method A, Class 2
Place Riprap
ABUTMENT RIPRAP
NO SCALE
seat
Abutment bearing expansion joint
Remove and replace
S to n e c u rb
S to n e cu rb stone curb
Remove and reset
(See PLAN for dimensions)
Existing ground
Method A, Class 2
Place Riprap
Abutment 1
AR/CV PCB
2. See "TYPICAL SECTION" sheet for details.
1. Curb repair measured along curb line.
Existing concrete Girder
Existing Scupper
Method A, Class 2
Place Riprap d er us a e M
CL
er ut c ur t ol a d er us a e M
CL
er ut c ur t ol a
'-2
)2 etoN eeS( bruc enots eht gn ola tni oj tu C "0
1-'0 slab
A pproach
Class 1, Type A
Geotextile membrane w/ hydrodemolition
Start of removal of waterproofing
A C
T U
A L F I L E R
P
R A B
L R I
H P
E .D
G N
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
135609
PROJECT TEAM LEADERSCALECHECKED BYDRAWN BYDESIGNED BY
Phillip Boinske
5140-182P of
DATE
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
LINN COVE VIADUCT
BRIDGE PLAN SHEET
Structure Number:
October 2017
BLUE RIDGE PARKWAY
LINN COVE VIADUCT
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
PLAN AND ELEVATION - 2
N
17'-0 " = 3
4'-0" 2 Spa.
@12'-9" 23' -9"
Structure
Measured along
CL
C u rv e N o . 1
C u rv e N o . 2
C u rv e N o
S ta
M a tc h L in e B
.5
M a tc h L in e A
P .S .T . S ta . 2
.2
P .S . S ta . 2
.3
P .S .C
S ta
.3
'-3
4 Sp
a. @
17'- 0" =
68'- 0" 22'-0" 17'-0" = 51'-0"
3 Spa. @
23'-9" 15'-3"
8 Spa. @ 8'-6" =
68'-0"
13'-6" 4'-3"
S tru ctu re
M e a su re d a lo n g
CL
Structure
Measured along
CL
+00
282+00 283+00
Sta. 283+00
Pier 4CL
Sta. 281+20
Pier 3CL
CL
(Typ.)
scupper
Profile grade ground line @
Approximate existing
CL
StructureCL
Pier 3 Pier 4
"2
10'-7 55'-0"
84'-0"
Concrete curb repair
1'-0"Lx4"Wx2"D Concrete curb repair
2'-0"Lx4"Wx2"D
Concrete curb repair
2'-0"Lx4"Wx2"D
"2 146'-7
55'-0" stone repair
1'-0" Curb stone repair
1'-0" Curb
AR 3
R03
PLAN
ELEVATION
1:20
Stone curb
Stone curb
Notes:
AR/CV PCB
)1 e toN eeS
( bruc enots eht gn ola tnioj tuC "6-'153
Existing
2. Curb repair measured along the curb line.
1. See "TYPICAL SECTION" sheet for more details.
A
C T
U A
L F I L E R
P
R A
B L
R I
H P
E .D
G N
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541 of
DATE
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
LINN COVE VIADUCT
BRIDGE PLAN SHEET
Structure Number:
October 2017
BLUE RIDGE PARKWAY
LINN COVE VIADUCT
CV
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
PLAN AND ELEVATION - 3
1" = 20'
N
Sp a.
'-6
9' -6 " 15
'-3 "15'
-3"
13'-6" 4 Spa. @
17'-0" = 69'-0" 17'-0" = 51'-0"
3 Spa. @
End Bridge
Elev. 4277.28
Sta. 289+24.50
CL
Sta. 284+80
Pier 5
P .S .T
S ta
.3
C u r v e N o
CL
Sta. 286+60
Pier 6
P .S .C . S ta . 2
.3
C u r v e N o . 3
CL
Sta. 288+23
Pier 7
CL
S tr u ct u re
M ea su re d a lo n g
S ta . 2
M a tc h L in e B
4'-3" CL
(Typ.)
scupper
CLStructure
+00
286+00
287+00 288+
9+
PLAN
ELEVATION
Abutment 2 ground line @ Structure
Approximate existing
CL
Profile grade
Pier 5
Pier 6 Pier 7
"4
63'-9
Concrete curb repair
1'-0"Lx4"Wx2"D
Concrete curb repair
2'-0"Lx4"Wx2"D
53'-0"
1'-0" Curb stone repa ir
6'- 0"
AR 4
R04
Concrete curb rep air3'-0"Lx4" Wx2"D
75'-0
Concrete curb repair
1'-0"Lx4"Wx2"D
17'-0"15'-3"15'-3" 17'-0" = 51'-0"
3 Spa. @
13'-6"4 Spa. @ 17'-0" = 68'-0" 15'-3"
15'-3" 8 S pa.
8'-6 '-0"
'-3
"41
35' -11
P .S
S ta
.3
C u r v e N o
14' -0"
14'-0"
23'-0"
14'-0"2 trail pedestrian
Existing expansion joint
Remove and replace
Sto ne cu rb
Sto ne cu rb sto ne cu rb
Re m ov e an d re se t
Note:
AR/CV PCB
Existing
Method A, Class 2 (Typ.)
Place riprap
2. Curb repair measured along the curb line.
for more details.
1. See "TYPICAL SECTION" sheet
)1 eto
N e eS( bruc eno ts eh t gnol a tnioj tuC "6-'055
L )erutcurt S C eh t gno la d erus aeM(
'-2 erutcurtS C gnola derusae
L sla bAp pr oa ch
Class 1, Type A
Geotextile
Class 1, Type A
Geotextile
A C
T U
A L F I L E R
P
R A B
L R I
H P
E .D
G N membrane w/ hydrodemolition
End of removal of waterproofing
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541 of
DATE
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
LINN COVE VIADUCT
BRIDGE PLAN SHEET
Structure Number:
October 2017
BLUE RIDGE PARKWAY
LINN COVE VIADUCT
5 28
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
TYPICAL SECTION
No Scale
R05
34'-4"2'-1" 2'-1"
9'-9" 9'-9"
2'-3" 4'-7" 1'-6" 5'-0" 5'-0" 3'-10" 1'-6" 4'-7" 2'-3"
6" 6"
"8 11'-3
"8 72'-9 4'-11" 4'-11" "8
72'-9
"8 11'-3
18'-0"
1' -8
R
4" R 1'-8" R
4" R
CL
(Typ.)
vent
2" Dia.
T y p
1'-6"
3'-10"
" 8
1'-0" 1'-0"
3"
(Typ.)
T y p
T y p
TYPICAL SECTION
CL Structure
AT POST-TENSIONING BLOCK THRU SEGMENT
See DETAIL A d e c k
E x is ti
DETAIL A
E x is ti n g a s p h a lt o v e r la y
Top of existing overlay
Top of proposed overlay
See Note 3
See Note 2
See Note 1
AR
DETAIL B
(See Note 4)
Joint sealant to remain stone curb
Existing
"2
" Backer rod4
(See Note 5) anchor
Rebar of micro milling membrane and limit
Top of waterproofing m e m b r a n e
A s p h a lt o v e r la y membrane
Top of
W a te r p r o o fi n g
(See Note 6)
AR/CV PCB
Notes:
(two bolts, two nuts, two caps)
Replace missing hardware on the aluminum rails
Remove and reset existing loose stone curbs as needed.
stone curb anchor details.
See "WATERPROOFING MEMBRANE DETAILS" sheet for curb along the entire length of the structure.
Cut between the existing stone curb and the concrete
Cut joint box girder
Existing concrete
Joint Sealant (See Note 4) (Typ.)
A s p h a lt o v e r la y and curb (See Note 7)
Seal asphalt according to Section 559.
the waterproofing membrane. Install waterproofing membrane membrane and replace with 3 inches of asphalt overlay, including
Remove existing 2 inches asphalt overlay and waterproofing to Subsection 712.01(e) of the stucture, including approach slabs, according
Furnish silicone joint sealant along the entire length
NORTH ACCESS DOOR VIEW SECTION A-A
S p a
4"
L8x8x1
L8x8x1
4" access door
Existing north
A A
Existing box girder
"2 hole bolts in drilled
Ø Expansion
See DETAIL B
(See Note 8)
(See Note 8)
2" (±) wedge anchors.
" Ø stainless steel type 3162 1to the existing structure using
Furnish stainless steel angle at the north access door and attach
Ø w e d g e a n c h o r s
Furnish joint sealant according to Subsection 712.01.
9.
8.
7.
6.
5.
4.
3.
2.
1.
Furnish mortar according to Subsection 712.02 Type S.
See Note 9
A C
T U
A L F I L E R
P
R A B
L R I
H
T Y P
X S .D
G N
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541 of
DATE
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
LINN COVE VIADUCT
BRIDGE PLAN SHEET
Structure Number:
October 2017
LINN COVE VIADUCT
Bridge Roadway
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Notes:
CL Structure
(Joint at Abutment 1 shown, Abutment 2 similar)
"4
SECTION A-A
Scale: 3"= 1'-0''
TYPICAL SECTION
PLAN
EXPANSION JOINTS
REMOVAL OF CONCRETE AND EXISTING
10"
10"
Bridge Roadway to remain (See Note 2)
Existing reinforcement
Stone curb
(See Note 5)
(Typ.)
(Typ.)
(See Note 1)
(Remove and reconstruct) (Remove and reconstruct)
(See Note 1)
(See Note 3)
Membrane
(See Note 3)
CL Joint
(See Note 6) membrane
Waterproofing
6.
5.
4.
3.
2.
1.
the expansion joint.
Verify all dimension in the field before the fabrication of after the removal and replacement of the expansion joints.
Remove and reset the existing stone curbs before and
(Remove and replace expansion joint and membrane)
"2 133'-10
(See Note 6) a n d a s p h a lt o v e r la y
T y p
W a te r p r o o fi n g m e m b r a e
Stone curb
(See Note 5)
(Typ.)
a n d a s p h a lt o v e r la y
T y p
W a te r p r o o fi n g m e m b r a e
2" void2" Void
37'-6"
" Stone curb4
(See Note 5)
(Typ.)
Section 552.
using high early strength concrete (HES) according to hydrodemolition according with Section 560. Reconstruct
Remove existing concrete at expansion joints using
CL Joint
10"
10"
Stone curb
(See Note 5)
(Typ.)
"2 134'-2
"2 133'-10
(See Note 3)
Membrane
1'-6" (Max.)
(See Note 3)
(See Note 3) joint and membrane existing expansion
Remove and replace
M a x
(See Note 3)
Drain pipe
E x is ti n g e x is ti n g
C u r b r e v e a l c u r b r e v e a l
4""4 352"
(Void)
(See Note 3)
Membrane
Scale: 1" = 1'-0'' with a drain pipe at the lowest point of the sloped cross section.
and in accordance with Section 552. Install a membrane accordance with the manufacturer's recommendation
Install the expansion joint system and membrane in
DETAIL 1
DETAIL 1
"= 1'-0''2 1Scale:
"= 1'-0''2 1Scale:
Scale: 2" = 1'-0''
As shownCV CV
R06 damage during the concrete removal process.
Protect existing reinforcement from any membrane according to Section 559.
asphalt overlay according to Section 413. Install a waterproofing
Remove waterproofing membrane according to Section 560. Remove
Remove and replace waterproofing membrane and asphalt overlay.
PCB
(Limit of expansion joint)
(Limit of expansion joint) membrane (See Note 3) expansion joint and
Replace existing
EXPANSION JOINT DETAILS
A
A C
T U
A L F I L E R
P
R A B
L R I
H
E X
P A
N S I O
N J
O I N
T D
E T
A I L S .D
G N
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541 of
DATE
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
LINN COVE VIADUCT
BRIDGE PLAN SHEET
Structure Number:
October 2017
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d
Notes:
Scale: 1" = 1'-0''
S e e N o te
See Note 3
See Note 4
A s p h a lt o v e r la y
W a te r p r o o fi n g m e m b r a n e
See Note 3
See Note 4
A s p h a lt o v e r la y
W a te r p r o o fi n g m e m b r a n e
S e e N o te
S e e N o te
S e e N o te
A s p h a lt o v e r la y
W a te r p r o o fi n g m e m b r a n e
S e e N o te
S e e N o te
See Note 3
See Note 4
Variable
Variable
(Max.)(Max.)
1'-0"1'-0" reseal joints
Clean and
2" 9"
C
C
Scale: 1" = 1'-0''
TYPICAL A-A
Scale: 1" = 1'-0''
"2
(See Note 5)
STONE CURB PLAN VIEW
B B
Scale: 1" = 1'-0''
Scale: 1" = 1'-0'' Scale: 1" = 1'-0''
DETAIL 1 DETAIL 2 DETAIL 3
Stone curb
ASPHALT AT SCUPPER
PLAN VIEW SECTION A-A SECTION B-B
AND MISCELLANEOUS DETAILS
WATERPROOFING MEMBRANE
7CV CV
R07
As shown
(To remain)
1x2
1L4x3
Existing
(To remain)
1x2
1L4x3
Existing
Legend:
Asphalt overlay
S e e N o te
A s p h a lt o v e r la y
W a te r p r o o fi n g m e m b r a n e
S e e N o te
(See Note 5)
Mortar
AT THE REMOVE AND RESET STONE CURB LOCATIONS
DETAILS FOR ASPHALT OVERLAY AND WATERPROOFING MEMBRANE
to Subsection 712.02 for the placement of the removed curbs.
and as directed by the CO. Furnish mortar seat conforming
Remove and reset stone curbs as indicated in the plans
PCB
Ø Stainless anchor steel rebar replacement operations.
designated to remain during the asphalt removal and
Protect existing elements (stone curbs, precast box, railing) curb when the stone curb is designated for remove and reset.
Extend the waterproofing membrane below the stone
5.
4.
3.
2.
1.
and reset.
Drill new in stone curband concrete curb. Fill with epoxy , insert anchor
Remove the existing stone curbs by saw cutting the existing anchors.
Subsection 559.
membrane. Install waterproofing membrane in accordance with and replace with 3 inches of asphalt overlay, including the waterproofing
Remove existing 2 inch asphalt overlay and waterproofing membrane, 2'-0"
Stone curb
Stone curb
A C
T U
A L F I L E R
P
R A B
L R I
H
W A
T E
R P
R O
O F I N
G M
E M
B R
A N
E A
N D M
I S
C E
L L
A N
E O
U S D
E T .D
G
N STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541 of
DATE
BRP-1247
U.S. DEPARTMENT OF TRANSPORTATION
LINN COVE VIADUCT
BRIDGE PLAN SHEET
Structure Number:
October 2017
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
CONCRETE REPAIR DETAILS - 1
concrete
Face of existing
'' Saw cut4
Depth of concrete repair
VERTICAL CONCRETE REPAIR
HORIZONTAL CONCRETE REPAIR
concrete Face of existing
'' Saw cut4
Depth of concrete repair
OVERHEAD CONCRETE REPAIR
Depth of concrete repair
'' Saw cut4 concrete
Face of existing
Existing reinforcing bars
Existing reinforcing bars
Existing reinforcing bars
Notes:
2.
1.
determined in the field by the CO.
concrete reinforcing bars may vary. Removal areas will be
Locations of concrete repair areas are approximate. Depth of for repair method.
is destroyed, see "CONCRETE REPAIR DETAILS - 2" sheet
If bond between existing concrete and reinforcing steel
8No scale
Concrete bonding agent
CVCV
R08
PCB
Class HES concrete
Class HES concrete
Class HES concrete allows (See Note 2) top cut, where depth of reinforcing bars
'' Under cut all sides, except2 allows (See Note 2) depth of reinforcing bars
" Under cut all sides where2 allows (See Note 2) depth of reinforcing bars
" Under cut all sides where2
(Typ.)
Injection port crack
Existing surface
Existing concrete
Epoxy resin
CONCRETE CRACK REPAIR
Note:
Section 561.
Repair concrete cracks according to
A C
T U
A L F I L E R P
R A B
L R I
H
C O
N C
R E P
D T .D
G N
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 20179
CONCRETE REPAIR DETAILS - 2
Not to scale
'' min.2
Cathodic Anode
HORIZONTAL CONCRETE REPAIR
Depth of concrete repair
Existing reinforcing bars
Cathodic Anode
2'' min. clr.
Depth of concrete repair'' Under cut all sides2
2'' min. clr. '' Saw cut4 concrete
Face of existing
'' Under cut all sides2
2'' Min. clr.
'' Saw cut4 concrete
Face of existing
OVERHEAD CONCRETE REPAIR
Cathodic Anode
Depth of concrete repair
Notes:
according to manufacturer's recommendations, as approved by CO.
Install Cathodic Anodes for corrosion protection on repair areas determined in the field by the CO.
Depth of concrete rebars may vary. Removal areas will be
Locations of concrete repair areas and cracking are approximate.
with machine bolts.
Fasten steel welded wire reinforcement to existing reinforcement/concrete
VERTICAL CONCRETE REPAIR
concrete
Face of existing
'' Saw cut4
2'' x 2'', w2 x w2
Steel welded wire reinforcement top cut
'' Under cut all sides except2
2'' x 2'', w2 x w2
Steel welded wire reinforcement
2'' x 2'', w2 x w2
Steel welded wire reinforcement
= 300 lbs.
direction. Min. pull out tension
@ max. spacing of 1'-0" in each
(length varies) with sleeve anchor
'' Dia. galvanized machine bolt4
= 300 lbs.
direction. Min. pull out tension
@ max. spacing of 1'-0" in each
(length varies) with sleeve anchor
'' Dia. galvanized machine bolt4
= 300 lbs.
direction. Min. pull out tension
@ max. spacing of 1'-0'' in each
(length varies) with sleeve anchor
'' Dia. galvanized machine bolt4 bars
Existing reinforcing reinforcement
Existing
Concrete bonding agent
CVCV
R09
PCB
4.
3.
2.
1.
Match in color with the existing concrete.
Class HES concrete
Class HES concrete
'' min.2 reinforcement
" min. clr. above4
'' min.2 reinforcement
" min. clr. below4 reinforcing bar
" min. clr. to4 3 Class HES concrete
A C
T U
A L F I L E R P
R A B
L R I
H
C O
N C
R E P
D T .D
G N
1-
O c t-
M
P R
O J E
C T
S b lr i\ h B r id g e M ic r o s ta ti o n B r id g e
D e s ig n
F il e s P
R O J E
C T
S .d g n
5140-182P
PROJECT TEAM LEADER
LINN COVE VIADUCT
STATE PROJECT
NUMBER
SHEET
NP-BLRI 2H14 NC
NO.
PMIS NPS
NO.
208541
BRIDGE PLAN SHEET
Phillip Boinske 9
135609
Structure Number:
October 2017 x x x x x x
File details come from the government source that posted it.