6933A221Q000006 AMEND 00003 KDY FY21 ABS Special Survey Machine.pdf

PDF 93 KB Posted

Attached to
T. S. KENNEDY - FY21 ABS SPECIAL SURVEY (MACHINERY)
Solicitation number
6933A221Q000006
Issued by

About this file

This document provides details for a federal contract solicitation to conduct an ABS Special Periodical Survey of machinery aboard the Training Ship KENNEDY. The U.S. Maritime Administration seeks a firm fixed price purchase order for a contractor to provide all labor and materials to complete the ABS survey of main propulsion machinery and machinery #10 for a non-tanker cargo ship over 15 years old. The period of performance is March 10, 2021 to May 10, 2021. A site visit will be held on February 9, 2021 aboard the ship for potential offerors. Any questions must be submitted by February 12, 2021. Minority, women-owned, and disadvantaged businesses are notified of working capital financing available from the DOT Short-Term Lending Program for transportation contracts.

View the file

Other files

File Type Posted
6933A221Q000006 AMEND 00001 KDY FY21 ABS Special Survey Machine.pdf PDF
Main Thrust Bearing Dwg.pdf PDF
6933A221Q000006 AMEND 00002 KDY FY21 ABS Special Survey Machine.pdf PDF
Main Thrust Bearing Tech Manual scan.pdf PDF
Section 1.7 Reference Drawings - List of Spare parts & Special Tools Dwg # 20266.pdf PDF
Section 1.7 Reference Drawing - General Arrangement Dwg # 1-101.pdf PDF
Hyde Steering Gear Section 1.7 Insert 11 Control Mechanism.pdf PDF
Anchor Windlass 1.9 Vickers Fixed Disp Motor.pdf PDF
Section 1.7 Sectional Assemblies & List of Parts - Windlass Unit 18415.pdf PDF
Hyde Steering Gear Section 1.8 Insert 1.pdf PDF
Section 1.7 Sectional Assemblies & List of Parts - Chain Pipe Deck Fitting Dwg # 16890.pdf PDF
Hyde Steering Gear Section 1.7 Insert 3 Lubrication Chart.pdf PDF
Hyde Steering Gear Section 1.7 Insert 4 Hydraulic Circuit .pdf PDF
Hyde Steering Gear Section 1.7 Insert 19 Shuttle Valve.pdf PDF
Hyde Steering Gear Section 1.7 Insert 1 General Arrangement.pdf PDF
Hyde Steering Gear Section 1.7 Insert 15 Hand Pump Unit.pdf PDF
Section 1.7 Reference Drawings - Hydraulic Circuit & Wiring Diagram Dwg # 18407.pdf PDF
Hyde Steering Gear Section 1.7 Insert 21 3 Way Valve.pdf PDF
Hyde Steering Gear Section 1.7 Insert 7 Power Unit and Bedplate.pdf PDF
Section 1.7 Sectional Assemblies & List of Parts - Relief Valve Dwg # 16844.pdf PDF
Hyde Steering Gear Section 1.7 Insert 10 Control Linkage.pdf PDF
Section 1.7 Sectional Assemblies & List of Parts - Power Unit & Piping Dwg # 19107.pdf PDF
Hyde Steering Gear Section 1.7 Insert 12 Main Piping.pdf PDF
Hyde Steering Gear Section 1.7 Insert 20 3 Way Valve.pdf PDF
Anchor Windlass 1.8 Vickers Variable Pump.pdf PDF
Anchor Windlass Index.pdf PDF
Anchor Windlass 1.2 Description & Operation.pdf PDF
Hyde Steering Gear Section 1.7 Insert 13 Fill and Drain Piping.pdf PDF
Hyde Steering Gear Section 1.7 Insert 16 Automatic Valve.pdf PDF
Section 1.7 Sectional Assemblies & List of Parts - Pump Control & Power Limiter Dwg # 18408.pdf PDF
Anchor Windlass 1.6 Maintenance.pdf PDF
Hyde Steering Gear Section 1.7 Insert 9 Main Relief Valve.pdf PDF
Hyde Steering Gear Section 1.1-Section 1.6.pdf PDF
Main Condenser and Main Air Ejector Parts I thru IV.pdf PDF
Installation IMO Three Screw and CIG Series Pumps.pdf PDF
Hyde Steering Gear Section 1.8.pdf PDF
Hyde Steering Gear Section 1.7 Insert 22 Relief Valve .pdf PDF
Hyde Steering Gear Section 1.7 Insert 23 Pressure Gage Assembly.pdf PDF
Hyde Steering Gear Section 1.7 Insert 5 List of Spare Parts.pdf PDF
Hyde Steering Gear Section 1.7 Insert 8 Follow Up Control.pdf PDF
Hyde Steering Gear Section 1.7 Insert 14 Auxiliary Piping.pdf PDF
Anchor Windlass 1.10 Vickers Vane Pump.pdf PDF
Hyde Steering Gear Section 1.7 Insert 17 Interlock Valve.pdf PDF
Section 1.7 Reference Drawings - Instruction & Lubrication Chart Dwg # 1-106.pdf PDF
Hyde Steering Gear Section 1.7 Insert 18 Selector Valve.pdf PDF
Hyde Steering Gear Section 1.7 Insert 10 Control Linkage .pdf PDF
Anchor Windlass 1.1 Design Data.pdf PDF
Hyde Steering Gear Section 1.7 Insert 2 Instruction Chart.pdf PDF
Anchor Windlass 1.3 Install, 1.4 Adjustment, 1.5 Operating Instr.pdf PDF
Hyde Steering Gear Section 1.7 Insert 6 Plunger Unit .pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A221Q000006 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

6933A2

NORFOLK VA 23505

7737 HAMPTON BLVD BLDG 19 STE 300

DIVISION OF ATLANTIC OPERATIONS

MARITIME ADMINISTRATION

DAO-SMP21-BDGT02/16/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

01/21/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

T.S. KENNEDY - FY21 ABS SPECIAL SURVEY (MACHINERY)

The purpose of this Amendment to extend the solicitation due date to 12:00 p.m. EST, Thursday, February 25, 2021.

LIST OF CHANGES:

Bids due date : 23-FEB-21 changed to 25-FEB-21

Solicitation due time : 14:00 PM changed to 12:00 PM

Period of Performance: 03/10/2021 to 05/10/2021

In order for an invoice to be processed for payment, it must include your Federal ID

Number, Purchase Order Number, and Invoice Number. Without these numbers, your invoice will

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Monique Leake

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

6933A221Q000006/0003 be returned and payment will be delayed.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .