1547-2510_, Rev 7, Long'l Struct Sections.pdf

PDF 4 MB Posted

Attached to
TS Freedom Star FY 20 Dry Docking Federal contract opportunity
Solicitation number
6933A220Q000012
Issued by
Department of Transportation Maritime Administration

About this file

This document contains a federal solicitation notice and technical specifications file. The solicitation seeks industrial support services for the FY 2020 dry docking of the TS Freedom Star vessel. The U.S. Department of Transportation Maritime Administration intends to solicit bids through solicitation number 6933A220Q000012. Services will include dry docking the vessel to perform maintenance and repairs. The technical specifications file provides details on structural sections of the vessel and notes revisions to lightning holes and other features. The solicitation represents an opportunity for shipyard and industrial firms to compete for work performing dry dock maintenance and upgrades to the TS Freedom Star.

View the file

Other files for this federal contract opportunity

Other files attached to TS Freedom Star FY 20 Dry Docking, newest first.
File Type Posted
TSFS Amdmt 0004.pdf PDF
TV KINGS POINTER Docking Calculations.pdf PDF
1316-901, Kings Pointer Docking Plan.pdf PDF
Revised ITEM 119.pdf PDF
TSFS DD Amdmt 0003.pdf PDF
1547-5255 Diesel Oil Lube Oil Dirty Oil Diagram 1of1.pdf PDF
TSFS DD Amdmt 0002.pdf PDF
TSFS DD Amdmt 0001 2.pdf PDF
TSFS DD Amdmt 0001.pdf PDF
Brake Lining Part _s.jpg JPG image
1547-4701, Rev 3, Rudder Arr.pdf PDF
TSFS FY20 DD CSS Provisions and Clauses.pdf PDF
1547-2515_Rev 6, Transverse Bhds.pdf PDF
Stern Thruster Access Hole.JPG JPG image
Stern Thruster Access Hole 2.JPG JPG image
Brake Pad Pic.jpg JPG image
MA-57_Drydock_Report.pdf PDF
1427-555, Rev -, TV FREEDOM STAR, FIRE AND SAFETY PLAN.pdf PDF
1547-1420 Docking Plan.pdf PDF
Prop Shaft detail.pdf PDF
MARAD K.POINTER EMD INSP LC06062019B.pdf PDF
Shell Expansion Drawing.pdf PDF
Stern Thruster 2768WG-'D' 32HJP SECTIONAL ARRANGEMENET (003).pdf PDF
Attmt I TSFS 2020 DD SOW.pdf PDF
Brake Print.jpg JPG image
FREEDOM STAR CFR 056 Anchor Chains Lockers - Chain Gauging Report.pdf PDF
January 2019 RRF Coatings Guidelines.xls XLS spreadsheet
Attmt II Vendor Pricing TSFS Drydocking 2020.xlsx XLSX spreadsheet
FREEDOM STAR CFR 046 Bow Thruster Maintenance - Final Service Report.pdf PDF
1 1547-4420 Bow Thruster Arrangement and Details 1547-4420 1of1.pdf PDF
Sternthruster O'Haul Parts Required.pdf PDF
4 1547-5272 1of1.pdf PDF
1547-4411, Rev 5, Machinery Arrgmt.pdf PDF
FREEDOM STAR Zinc Anodes Locations and sketch.pdf PDF
3 1547-4801 2of2.pdf PDF
MVFS Mooring Analysis.pdf PDF
2 1547-4801 1of2.pdf PDF
Section 2.6 of RRF TE-1.pdf PDF
1780-2550 Stern Thruster A&D.pdf PDF
KINGS POINTER - CMS Prelim Report.pdf PDF
1427-802, Rev -, TV FREEDOM STAR, General Arrangements and Profile.pdf PDF
1547-4705_Rudder Details.pdf PDF
1547-4419, Rev 1, Stern Thruster Compt Machy Arr.pdf PDF
part_7_e-nov07.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TYPICAL LIGHTENING

HOLES CREATED WHEN VOID

CONVERTED TO A CL FLUME TANK

NEW SEWAGE TK

OUTBOARD P&S

1. ADDED "AS-FOUND" LIGHTENING HOLES IN

8ft BHD, FR 41-35 P&S

2. ADDED NOTE OF NEW SEWAGE TANKS

OUTBD OF 8 ft LONG'L BHD, P&S

3. MODIFIED EXISTING WHERE NOTED

4-B

BECI

JULY

'13

DOOR REMOVED

NEW FACE PLATE FB4x3/8" ADDED

CUT OUT FOR

NEW DOOR

2-A

2-B

TYPICAL LIGHTENING

HOLES CREATED WHEN VOID

CONVERTED TO A CL FLUME TANK

NEW SEWAGE TK

OUTBOARD P&S

File details come from the government source that posted it. Updated .