T.S. KENNEDY VALVES LOG
View the file
Other files
Show 40 more
Latest 50 of 94 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Manual Valves
| US Department of Transportation Maritime Administration | VALVE LOG | |||||||||||||||||||
| Valves 2 inch and under are to be replaced by the Contractor with equal valves. New valves shall be supplied at no additional cost to the Maritime Administration. New valves shall be bronze, Monel trimmed, bolted bonnet style, using new gaskets and stainless steel or Monel bolting for installation. | ||||||||||||||||||||
| Vessel | T.S Kennedy - DRYDOCKING 2018 | |||||||||||||||||||
| Item No. | Valve | Description | Location (frame/deck) | TYPE | SIZE / PRESSURE | Bolts per Flange / Bonnet | Waste Spool Piece Required | Open / Removed (from pipe) | Blue Fit COTR | Hydrostatic Test ABS/USCG/COTR | Installed on Ship | Final Inspection | Total Effort | Note | ||||||
| No. | ||||||||||||||||||||
| 207 | MANUALLY OPERATED SKIN VALVES | 30% | 20% | 25% | 20% | 5% | ||||||||||||||
| Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | |||||||||
| 1 | Fore-Peak Tank Overflow | 009-Port | Swing-Check | 6 /150 | 8 / 10 | |||||||||||||||
| 2 | Chain-Locker Drain Well Overboard Discharge | 010-Port | Globe | 2-1/2 / 150 | 4 / 4 | |||||||||||||||
| 4 | Weather-Deck Drain Overboard 1 Hold | 015-Port | Globe | 2-1/2 / 150 | 4 / 4 | |||||||||||||||
| 5 | Weather-Deck Drain Overboard 1 Hold | 015-Stbd | Globe | 2-1/2 / 150 | 4 / 4 | |||||||||||||||
| 8 | Echo Sound Transducer | 17 Stbd | Gate | 3 /125 | 4 / 4 | |||||||||||||||
| 13 | AMR MSD Black Water Overboard | 099-Stbd | Gate | 8 / 150 | 8 / 12 | |||||||||||||||
| 14 | AMR MSD Gray Water Overboard | 100-Stbd | Gate | 6 / 150 | 8 / 12 | |||||||||||||||
| 15 | AMR Low Sea Suction | 100-Port | Gate | 18 / 150 | 16 / 16 | |||||||||||||||
| 16 | AMR Low Sea Suction Vent | 103-Port | Gate | 1-1/2 / 150 | 4 / 4 | |||||||||||||||
| 17 | AMR Low Sea Suction Steam Out | 103-Port | Globe | 1 / 150 | 4 / 4 | |||||||||||||||
| 18 | AMR MSD Effluent Overboard | 104-Stbd | Gate | 2 1/2 / 150 | 4 / 6 | |||||||||||||||
| 23 | Steaming-Out for Fire Pump Sea Chest Main Sea Scoop | 123-Stbd | Globe | 1 / 150 | 4 / 4 | Y | ||||||||||||||
| 24 | Flushing Line to Main Sea Scoop | 123-Stbd | Globe | 4 / 150 | 8 / 8 | Y | ||||||||||||||
| 27 | Overboard Refer Eng/Room | 127-Port | Check | 3 / 150 | 4 / 6 | |||||||||||||||
| 28 | Bilge/Ballast Pump/Gen'lSer Pump Sea Suct. | 129-Port | Gate | 8 / 150 | 8 / 12 | Y | ||||||||||||||
| 29 | Bilge Oily Ballast & F.O. Transfer Pump Sea Suction | 129-Stbd | Gate | 6 / 150 | 8 / 8 | Y | ||||||||||||||
| 30 | Salt Water Service System Ovbd. Discharge | 129-Port | Gate | 6 / 150 | 8 / 6 | Y | ||||||||||||||
| 31 | Main & Aux. Circ. Pumps & Ballast & F.O. Trans. Pump High Sea Chest Vent | 129-Stbd | Gate | 5 / 150 | 8 / 6 | Y | ||||||||||||||
| 32 | Bilge & Ballast & Gen. Service Pumps Aux. Mach. Serv. Pump Dist. Plant & Fire Main Pump Sea Chest Vent | 129-Port | Globe | 5 / 150 | 4 / 4 | Y | ||||||||||||||
| 33 | Steaming-Out for Fire Pump Sea Chest Aux. High Sea Chest | 129-Port | Globe | 1 / 150 | 4 / 4 | Y | ||||||||||||||
| 34 | Fire-Pump Suction Aux. High Sea Chest | 129-Port | Gate | 8 / 150 | 8 / 10 | Y | ||||||||||||||
| 35 | Boiler-Blowdown Overboard Discharge | 129-Stbd | Globe | 2 / 600 | 8 / 6 | Y | ||||||||||||||
| 36 | Dist. Feed Pump Sea Suction Aux. High Sea Chest | 129-Port | Gate | 6 / 150 | 8 / 6 | Y | ||||||||||||||
| 37 | Aux. Mach. Sea Water Service Pump (Standby) High Sea Chest Suction | 129-Port | Gate | 6 / 150 | 8 / 8 | Y | ||||||||||||||
| 38 | Steaming-Out for Fire Pump Sea Chest Main & Aux. Circ. High Sea Chest | 131-Stbd | Gate | 1 / 150 | 4 / 4 | Y | ||||||||||||||
| 39 | Steaming-Out for Fire Pump Sea Chest Circ. Low Sea Chest | 131-Stbd | Globe | 1 / 150 | 4 / 4 | Y | ||||||||||||||
| 40 | Main Circ. Pump Low Sea Chest Vent | 131-Stbd | Gate | 5 / 150 | 8 / 4 | Y | ||||||||||||||
| 41 | Main Cond. Circ. Pump Emerg Bilge Suction | 131-Stbd | Angle N/R Globe | 14 / 150 | 12 / 20 | |||||||||||||||
| 42 | Main Cond. Overboard Discharge Self Venting | 132-Port | Gate | 10 / 150 | 12 / 12 | Y | ||||||||||||||
| 43 | S.S. Refrig-Space Drain Overboard | 132-Stbd | Clapper | 3 / 150 | 4 / 4 | |||||||||||||||
| 44 | L.O. Cooler Overboard Discharge | 134-Port | Gate | 6 / 150 | 8 / 8 | Y | ||||||||||||||
| 45 | Bilge Oily Ballast & F.O. Transfer Pump Ovbd. Disch. | 135-Stbd | Globe | 5 / 150 | 8 / 10 | Y | ||||||||||||||
| 46 | Contaminated Steam Gen. Blowdown Ovbd. Disch. | 135-Port | Globe | 2-1/2 / 150 | 4 / 4 | Y | ||||||||||||||
| 47 | Aux. Circ Pumps Low Sea Chest | 136-Stbd | Gate | 3 / 5 | 4 / 6 | Y | ||||||||||||||
| 48 | Dist. Brine Pump Overboard Discharge | 136-Port | Globe | 4 / 150 | 4 / 6 | Y | ||||||||||||||
| 49 | Steaming-Out for Fire Pump Sea Chest Aux. Low Sea Chest | 137-Stbd | Globe | 1 / 150 | 4 / 4 | Y | ||||||||||||||
| 50 | Bilge/Balalst Pump Gen. Service Ovbd Disch. | 137-Port | Globe | 5 / 150 | 8 / 10 | Y | ||||||||||||||
| 52 | S.S. Refrig-Space Drain Overboard | 140-Stbd | Clapper | 3 / 150 | 4 / 4 | |||||||||||||||
| 61 | Aft MSD Black/Gray Water Overboard | 173-Port | Gate | 8 / 150 | 8 / 12 | |||||||||||||||
| 62 | AFT MSD Effluent Overboard | 176-Port | Gate | 2 1/2 / 150 | 4 / Union | |||||||||||||||
| 63 | Fire Pump Sea Chest Vent | 188-Stbd | Gate | 2 / 150 | 4 / 4 | Y | ||||||||||||||
| 64 | Steaming-Out for Fire Pump Sea Chest | 188-Stbd | Globe | 1 / 600 | 4 / 4 | Y | ||||||||||||||
| 67 | Aft Peak Tank Overflow | 219-Port | Swing-Check | 6 /150 | 8 / 10 |
0%
&P/&N &D
Motor Operated Valves
| US Department of Transportation Maritime Administration | VALVE LOG | |||||||||||||||||||||||||
| Valves 2 inch and under are to be replaced by the Contractor with equal valves. New valves shall be supplied at no additional cost to the Maritime Administration. New valves shall be bronze, Monel trimmed, bolted bonnet style, using new gaskets and stainless steel or Monel bolting for installation. | ||||||||||||||||||||||||||
| Vessel | T.S Kennedy - DRYDOCKING 2018 | |||||||||||||||||||||||||
| Item No. | Valve | Description | Location (frame/deck) | TYPE | SIZE / PRESSURE | Bolts per Flange / Bonnet | Waste Spool Piece Required | Actuator | Open / Removed (from pipe) | Blue Fit COTR | Hydrostatic Test ABS/USCG/COTR | Installed on Ship | Final Inspection | Total Effort | Note | |||||||||||
| No. | Tested | Removed | Overhauld | Installed | ||||||||||||||||||||||
| 207 | MOTOR OPERATED SEA VALVES | 10% | 10% | 10% | 10% | 20% | 10% | 15% | 10% | 5% | ||||||||||||||||
| Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | Labor | Materials | |||||||||||
| 68 | AMR Overboard Discharge | 099-Port | Gate | 18 / 150 | 16 / 20 | |||||||||||||||||||||
| 69 | Main Condenser Suction (Scoop) | 123-Stbd | Gate | 32 / 75WP | 32 / 24 | |||||||||||||||||||||
| 70 | SSTG #2 Aux. Circ. Pump High Sea Suction | 130-Stbd | Gate | 10 /150 | 12 / 12 | Y | ||||||||||||||||||||
| 72 | Main Condenser Overboard Discharge | 132-Port | Gate | 36 / 75WP | 32 / 28 | Y | ||||||||||||||||||||
| 73 | SSTG #1 Aux. Circ Pump High Sea Suction (Tripping on overload) | 132-Stbd | Gate | 10 / 150 | 12 / 12 | Y | ||||||||||||||||||||
| 74 | Main Condenser Circ. Pump Low Sea Suction | 133-Stbd | Globe (4 vay) | 20 / 150 | 20 / 20 | Y | ||||||||||||||||||||
| 75 | SSTG #2 Condenser Overboard Discharge | 135-Stbd | Gate | 8 / 150 | 8 / 12 | Y | ||||||||||||||||||||
| 76 | SSTG #2 Aux. Circ. Pump Low Sea Suction | 136-Stbd | Gate | 10 / 150 | 12 / 12 | Y | ||||||||||||||||||||
| 77 | SSTG #1 Condenser Overboard Discharge | 136-Stbd | Gate | 8 / 150 | 8 / 12 | Y | ||||||||||||||||||||
| 78 | SSTG #1 Aux. Circ. Pump Low Sea Suction | 137-Stbd | Gate | 10 / 150 | 12 /12 | Y | ||||||||||||||||||||
| 79 | Fire-Pump #1 Sea Suction (Shaft Alley) | 188-Stbd | Gate | 5 / 150 | 8 / 6 | Y |
0%
Sheet3 image1.png image2.png