6933A218Q000003-0004_KDY_FY18_DD_Repairs.pdf

PDF 194 KB Posted

Attached to
T. S. KENNEDY - FY18 Drydock Surveys and Repairs
Solicitation number
6933A218Q000003
Issued by

About this file

AMENDMENT 00004 REPLACES AMENDMENT 00003

View the file

Other files

File Type Posted
Engine_Room_Supply_Fans.pdf PDF
Western_gear_works__N-101,183_rev_4-Line_Shaft_Bearing_20_7-8_dia_-_Copy.pdf PDF
156-S11-03-04_Fore_Peak_Framing.pdf PDF
Hydrotorque_tech_manual_scanned.pdf PDF
156-S11-01-02_SHELL_EXP._AFT.pdf PDF
156-S12-5-7_PROPELLER_SHAFT_WITHDRAWING_ARANGEMENT_AND_DETAILS_(OBSOLETE)_-1-5.pdf PDF
JMT_(Wartsila)_Stern_Seal.pdf PDF
156-S55-03-06_ARRGT._OF_HTG._COILS_&_STMG._OUT_PIPE_TUNNEL_FWD.pdf PDF
TS_Kennedy_Propulsion_Shafting.pdf PDF
AUX_MACH_RM_SW_SERVICE_SYS_DIA-_540TV-001-524-20(E).pdf PDF
Hydrotorque_Origional_Parts_Outfitting.pdf PDF
156-S43-01-03__SHAFTING_Details_Coupling_Bolts_and_Propeller_Nut_1-3.pdf PDF
STERN_TUBE__BEARING_-SEALS_ASSEMBLY.pdf PDF
Side_Framing_Aft-_156-S11-03-07.pdf PDF
MID_SOUTH_DRW_EMERGENCY_SWBD-2EP0602.pdf PDF
1004_SeaPress_Sell_Sheet_USA_0715.pdf PDF
540TV-001-524-06,_SEAWATER_FLUSHING_ENGINE_ROOM.pdf PDF
540TV-001-500-11.pdf PDF
MID_SOUTH_DRW_MAIN_SWBD-2EP0601.pdf PDF
MARAD_PLAN_156-S43-2-104_Line_Shaft_Bearing_20_7-8_dia_-_Copy.pdf PDF
156-S38-02-01_(K)_DIAG.AARGT.STM.HEATING_SYSTEM.pdf PDF
156-S55-03-06MAB_-_ARRGT._HTG._COILS_&_STMG._OUT_PIPE_TUNNEL_FWD._L-M.pdf PDF
540TV-001-167-02_(ALL_SHEETS).pdf PDF
Western_Gear_DRW__N101-183.pdf PDF
T_S__Kennedy_Valves_Log_03-19-2017.xlsx XLSX spreadsheet
MID_SOUTH_DRW_AUX_SWBD-2EP060.pdf PDF
156-S43-01-01_ARRGT_OF_SHAFTING_1-3.pdf PDF
540TV-001-524-05,_SEAWATER_FLUSHING.pdf PDF
W051_81_MC-Prebond_100_(NA)_April_13.pdf PDF
156-S43-01-03__SHAFTING_Details_Coupling_Bolts_and_Propeller_Nut_1-3.pdf PDF
54TV-001-997-01_REV_4_Dry_docking.pdf PDF
128-Shaft_Alignment_Guide_e.pdf PDF
156-S43-01-01_ARRGT_OF_SHAFTING_1-3.pdf PDF
583-01-SHEET_1_-_REV_E-SHEET_1.pdf PDF
100-05B-SHT_1.pdf PDF
STERN_TUBE_C3-100_S43-2-1_REV_4.TIF TIF image
JMT_(Wartsila)_Stern_Seal.pdf PDF
540TV-001-801-01_-_General_Arrangement.pdf PDF
Sea_valves_REQUIRING_waster_spool_pieces.docx DOCX document
Kennedy_Mooring_ReportAppx.pdf PDF
156-S12-5-7_PROPELLER_SHAFT_WITHDRAWING_ARANGEMENT_AND_DETAILS_(OBSOLETE)_-1-5.pdf PDF
MC-Prepbond100_W051.81_002.pdf PDF
100-05B-SHT_4.pdf PDF
156-S43-01-02__SHAFTING_Rough_Forging_Weight_1-2.pdf PDF
100-05B-SHT_3.pdf PDF
TS_Kennedy_Propulsion_Shafting.pdf PDF
100-05B-SHT_6.pdf PDF
100-05B-SHT_5.pdf PDF
100-05B-SHT_7.pdf PDF
583-01-SHEET_2_-_REV_E-SHEET_2.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

6933A218Q000003 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

NORFOLK VA 23505-1204

BUILDING 19 SUITE 300

MARAD-00092

7737 HAMPTON BLVD

MAR-380-2

ATLANTIC ACQUISITION OFFICE

US DOT MARITIME ADMINISTRATION

12/27/20170004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

12/27/2017

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This Amendment replaces Amendment 00003 due to incorrect attachment errors. The solicitation due date is Friday, February 02, 2018 at 2:00 p.m. EST.

LIST OF CHANGES:

Period of Performance: 03/01/2018 to 05/10/2018

In order for an invoice to be processed for payment, it must include your Federal ID

Number, Purchase Order Number, and Invoice Number. Without these numbers, your invoice will be returned and payment will be delayed.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Monique Leake

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Solicitation 6933A218Q000003 TS Kennedy Drydock 2018 Amend 0004

QUESTION ANSWER

Item 207, Sea Valves are listed in the attached spread sheet. Please, provide spread sheet See attached

Item 312, ABSTRACT calls for Main, Auxiliary and Emergency Switchboards, Group Controllers, Load Centers and Distribution Power Panels.

STATEMENT OF WORK REQUIRED calls for the following power distribution equipment is covered by this specification: • Auxiliary Switchboard. • Emergency Switchboard. • Main Switchboard

Please, clarify extend of work and provide reference documents

The Item covers • Auxiliary Switchboard. • Emergency Switchboard. • Main Switchboard only. There are NO Group Controllers, Load Centers or Distribution Power Panels, included in this item.

See DRW-

MID SOUTH DRW AUX SWBD-2EP060

MID SOUTH DRW MAIN SWBD-2EP0601

MID SOUTH DRW EMERGENCY SWBD-2EP0602

For the following Work Items please provide reference documents

WI 203 Open and Inspect Lien Shaft Bearings

WI 217 C/R Side Frames #135 to 139 Tank Top Level Port Side

WI 219 Machinery Ventilation System; Repair

WI 318 & WI 319 Forepeak and After Peak Tank Preservation

WI 320 Asbestos Abatement. (Diagrams and Arrgt. dwgs)

See DRW’s attached.

Item 208, BLASTING & COATING OF HULL - The item calls for grit blasting, will UHP water blasting be accepted in place of grit blasting?

Yes, preparation shall meet the requirements of the paint manufactures procedure for surface preparations. Including the required profile. The contractor is responsible for an accurate takeoff to determine the actual area required to be painted. This item includes all areas of the underwater hull, side shell and weather decks except the king post and the stacks. Including all areas above the bull work to include all weather decks, exterior ladders, catwalks, protuberances etc.

Item 317, Can the government provide As-built DRWs of the piping to be replaced?

There are no as built DRWs of the flushing water to be replaced in Item 317, DRW’s

540TV-001-524-05, SEAWATER FLUSHING

UPPER TWEEN AFT FR140 and 540TV-001-524- 06, SEAWATER FLUSHING ENGINE ROOM are provided but the contractor should rely on the

Solicitation 6933A218Q000003 TS Kennedy Drydock 2018 Amend 0004 information gathered during the site visit and by using the general arrangement DRWs provided. The contractor will be required to replace the piping to all the heads located from frame 140 aft, this includes all the public heads and the staterooms located on the upper deck and boat deck aft of frame 140. The Government considers the General Arrangement DRWs (540TV-001-801-01 - General Arrangement) to be the best source for the location of the heads on the upper deck and boat deck. The actual location of the piping that services those heads is unknown.

The contractor is responsible for removal and re-installation of all interference related to this work item.

Item 314/315 -could the Government provide a third-party subcontractor we could contact to perform the Hydrotorque Hinges

No, the government does not endorse any specific vendor or Subcontractor , but has a record that Van Hydraulics, Inc., 643 Sayre Avenue, Perth Amboy, NJ 08861 (P)

732.442.5500 has experience with working with these Hydrotorque hinges.

File details come from the government source that posted it.