Sea_valves_REQUIRING_waster_spool_pieces.docx

DOCX document 33 KB Posted

Attached to
T. S. KENNEDY - FY18 Drydock Surveys and Repairs
Solicitation number
6933A218Q000003
Issued by

About this file

Sea Valves Requiring Water Spool Pieces

View the file

Other files

File Type Posted
Engine_Room_Supply_Fans.pdf PDF
Western_gear_works__N-101,183_rev_4-Line_Shaft_Bearing_20_7-8_dia_-_Copy.pdf PDF
156-S11-03-04_Fore_Peak_Framing.pdf PDF
Hydrotorque_tech_manual_scanned.pdf PDF
156-S11-01-02_SHELL_EXP._AFT.pdf PDF
156-S12-5-7_PROPELLER_SHAFT_WITHDRAWING_ARANGEMENT_AND_DETAILS_(OBSOLETE)_-1-5.pdf PDF
JMT_(Wartsila)_Stern_Seal.pdf PDF
156-S55-03-06_ARRGT._OF_HTG._COILS_&_STMG._OUT_PIPE_TUNNEL_FWD.pdf PDF
TS_Kennedy_Propulsion_Shafting.pdf PDF
AUX_MACH_RM_SW_SERVICE_SYS_DIA-_540TV-001-524-20(E).pdf PDF
Hydrotorque_Origional_Parts_Outfitting.pdf PDF
156-S43-01-03__SHAFTING_Details_Coupling_Bolts_and_Propeller_Nut_1-3.pdf PDF
STERN_TUBE__BEARING_-SEALS_ASSEMBLY.pdf PDF
Side_Framing_Aft-_156-S11-03-07.pdf PDF
MID_SOUTH_DRW_EMERGENCY_SWBD-2EP0602.pdf PDF
1004_SeaPress_Sell_Sheet_USA_0715.pdf PDF
6933A218Q000003-0004_KDY_FY18_DD_Repairs.pdf PDF
540TV-001-524-06,_SEAWATER_FLUSHING_ENGINE_ROOM.pdf PDF
540TV-001-500-11.pdf PDF
MID_SOUTH_DRW_MAIN_SWBD-2EP0601.pdf PDF
MARAD_PLAN_156-S43-2-104_Line_Shaft_Bearing_20_7-8_dia_-_Copy.pdf PDF
156-S38-02-01_(K)_DIAG.AARGT.STM.HEATING_SYSTEM.pdf PDF
156-S55-03-06MAB_-_ARRGT._HTG._COILS_&_STMG._OUT_PIPE_TUNNEL_FWD._L-M.pdf PDF
540TV-001-167-02_(ALL_SHEETS).pdf PDF
Western_Gear_DRW__N101-183.pdf PDF
T_S__Kennedy_Valves_Log_03-19-2017.xlsx XLSX spreadsheet
MID_SOUTH_DRW_AUX_SWBD-2EP060.pdf PDF
156-S43-01-01_ARRGT_OF_SHAFTING_1-3.pdf PDF
540TV-001-524-05,_SEAWATER_FLUSHING.pdf PDF
W051_81_MC-Prebond_100_(NA)_April_13.pdf PDF
156-S43-01-03__SHAFTING_Details_Coupling_Bolts_and_Propeller_Nut_1-3.pdf PDF
54TV-001-997-01_REV_4_Dry_docking.pdf PDF
128-Shaft_Alignment_Guide_e.pdf PDF
156-S43-01-01_ARRGT_OF_SHAFTING_1-3.pdf PDF
583-01-SHEET_1_-_REV_E-SHEET_1.pdf PDF
100-05B-SHT_1.pdf PDF
STERN_TUBE_C3-100_S43-2-1_REV_4.TIF TIF image
JMT_(Wartsila)_Stern_Seal.pdf PDF
540TV-001-801-01_-_General_Arrangement.pdf PDF
Kennedy_Mooring_ReportAppx.pdf PDF
156-S12-5-7_PROPELLER_SHAFT_WITHDRAWING_ARANGEMENT_AND_DETAILS_(OBSOLETE)_-1-5.pdf PDF
MC-Prepbond100_W051.81_002.pdf PDF
100-05B-SHT_4.pdf PDF
156-S43-01-02__SHAFTING_Rough_Forging_Weight_1-2.pdf PDF
100-05B-SHT_3.pdf PDF
TS_Kennedy_Propulsion_Shafting.pdf PDF
100-05B-SHT_6.pdf PDF
100-05B-SHT_5.pdf PDF
100-05B-SHT_7.pdf PDF
583-01-SHEET_2_-_REV_E-SHEET_2.pdf PDF
Show 40 more

Latest 50 of 94 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Manually Operated Skin Valves

Location
Type
Waster Piece required
Size / Pressure
Bolts Per Flange / Bonnet
Steaming-Out For Fire Pump Sea Chest Main Sea Scoop
123-Stbd
Globe
YES
3 / 150
4 / 4
Flushing Line To Main Sea Scoop
123-Stbd
Globe
YES
4 / 150
8 / 8
Bilge/Ballast Pump/Gen'l Serv Pump Sea Suct.
129-Port
Gate
YES
8 / 150
8 / 12
Bilge Oily Ballast & F.O. Transfer Pump Sea Suction
129-Stbd
Gate
YES
6 / 150
8 / 8
Salt Water Service System Ovbd. Disch.
129-Port
Gate
YES
6 / 150
8 / 6
Main & Aux. Circ. Pumps & Bilge Ballast & F.O. Trans. Pump High Sea Chest Vent
129-Stbd
Gate
YES
5 / 150
8 / 6
Bilge & Ballast & Gen. Service Pumps Aux. Mach. Serv. Pump Dist. Plant & Fire Main Pump Sea Chest Vent
129-Port
Globe
YES
5 / 150
4 / 4
Steaming-Out For Fire Pump Sea Chest Aux. High Sea Chest
129-Port
Globe
YES
1 / 150
4 / 4
Fire-Pump Suction Aux. High Sea Chest
129-Port
Gate
YES
8 / 150
8 / 10
Boiler-Blowdown Overboard Discharge
129-Stbd
Globe
YES
2 / 600
8 / 6
Dist. Feed Pump Sea Suction Aux. High Sea Chest
129-Port
Gate
YES
6 / 150
8 / 6
Aux. Mach. Sea Water Service Pump (Standby) High Sea Chest Suction
129-Port
Gate
YES
6 / 150
8 / 8
Steaming-Out For Fire Pump Sea Chest Main & Aux. Circ. High Sea Chest
131-Stbd
Globe
YES
1 / 150
4 / 4
Steaming-Out For Fire Pump Sea Chest Circ. Low Sea Chest
131-Stbd
Globe
YES
1 / 150
4 / 4
Main Circ. Pump Low Sea Chest Vent
131-Stbd
Gate
YES
5 / 150
8 / 4
Main Cond. Overboard Discharge Self Venting
132-Port
Gate
YES
10 / 150
12 / 12
L.O. Cooler Overboard Discharge
134-Port
Gate
YES
6 / 150
8 / 8
Bilge Oily Ballast & F.O. Transfer Pump Ovbd. Disch.
135-Stbd
Globe
YES
5 / 150
8 / 10
Contaminated Steam Gen. Blowdown Ovbd. Disch.
135-Port
Globe
YES
2 / 150
4 / 4
Aux. Circ Pumps Low Sea Chest Vent
136-Stbd
Gate
YES
3 / 5
4 / 6
Dist. Brine Pump Overboard Discharge
136-Port
Globe
YES
4 / 150
4 / 6
Steaming-Out For Fire Pump Sea Chest Aux. Low Sea Chest
137-Stbd
Globe
YES
1 / 150
4 / 4
Bilge/Ballast Pump Gen. Service Ovbd. Disch.
137-Port
Globe
YES
5 / 150
8 / 10
Fire Pump Sea Chest Vent
188-Stbd
Globe
YES
2 / 150
4 / 4
Steaming-Out For Fire Pump Sea Chest
188-Stbd
Globe
YES
1 / 600
4 / 4
Motor Operated Sea Valves
Location
Type
Size / Pressure
Bolts Per Flange / Bonnet
SSTG # 2 Aux. Circ. Pump High Sea Suction
130-Stbd
Gate
YES
10 / 150
12 / 12
Main Condenser Circ. Pump High-Sea Suction (Motor operator removed)
131-Stbd
Gate
YES
20 / 150
20 / 16
SSTG # 1 Aux. Circ Pump High Sea Suction
132-Stbd
Gate
YES
10 / 150
12 / 12
SSTG # 2 Condenser Overboard Discharge
135-Stbd
Gate
YES
8 / 150
8 / 12
SSTG # 2 Aux. Circ. Pump Low Sea Suction
136-Stbd
Gate
YES
10 / 150
12 / 12
SSTG # 1 Condenser Overboard Discharge
136-Stbd
Gate
YES
8 / 150
8 / 12
SSTG # 1 Aux. Circ. Pump Low Sea Suction
137-Stbd
Gate
YES
10 / 150
12 / 12
Fire-Pump #1 Sea Suction (Shaft Alley)
188-Stbd
Gate
YES
5 / 150
8 / 6
Emergency Fire Pump Discharge Check (non-return valve)
121-STBD
Globe
YES
4/150
8/8

File details come from the government source that posted it.