6933A217Q00008_Quote_Price_Sheet.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
T. S. KENNEDY - Install of New Government-Furnished SMARDT AC Plant
Solicitation number
6933A217Q00008
Issued by

About this file

Quote Pricing Sheet

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Abstract

QUOTE SHEET
DTMA92Q1500020
JRRF - Drydocking Repairs of Fleet Craft PG-201
ITEMDESCRIPTION OF SERVICESQUANTITYUNITUNIT PRICEIGCESC MarineLyonDavis
0001Engine Removal1JOB$ 2,511.00$ 5,625.00$ 11,699.00$ 10,880.00
0002Remove And Inspect Both Propellor Shafts1JOB$ 3,078.00$ 3,500.00$ 15,320.00$ 6,428.00
0003Renew Port and Starboard Water-Lubricated Shaft Bearings1JOB$ 3,235.20$ 4,800.00$ 3,988.00$ 4,720.00
0004Remove, Inspect, and Reinstall Port and Starboard Propellers1JOB$ 1,674.00$ 2,500.00$ 4,236.00$ 3,600.00
0005Hull Penetrations1JOB$ 1,674.00$ 4,050.00$ 2,050.00$ 2,220.00
0006Structural Repairs1JOB$ 4,158.00$ 1,600.00$ 796.00$ 1,814.00
0007Drydocking1JOB$ 2,079.00$ 7,435.00$ 3,695.00$ 6,920.00
0008Ultrasonic Thickness (UT) Shot Inspection1JOB$ 1,548.00$ 1,800.00$ 1,560.00$ 2,384.00
0009Preserve Underwater Body1JOB$ 18,090.00$ 5,902.00$ 39,300.00$ 50,200.00
0010Engine Installation1JOB$ 177,900.00$ 161,242.36$ 216,336.90$ 258,480.00
0011Exhaust System1JOB$ 12,000.00$ 8,625.00$ 14,120.00$ 21,860.00
0012Raw Water System1JOB$ 7,452.00$ 2,650.00$ 9,328.50$ 13,200.00
0013Engine Controls1JOB$ 15,320.00$ 19,441.24$ 20,452.42$ 6,180.00
0014Welding Repairs – Flat Plate Renewal (3/8” Aluminum) (Estimate upto 100-lbs)100LBS$ 6,192.00$ 1,600.00$ 14,240.00$ 6,000.00
0015Welding Repairs – Flat Plate Renewal (5/16” Aluminum) (Estimate upto 100-lbs)100LBS$ 6,192.00$ 1,400.00$ 14,240.00$ 6,900.00
0016Welding Repairs – Flat Plate Renewal (1/4” Aluminum) (Estimate upto 100-lbs)100LBS$ 1,224.00$ 1,200.00$ 14,240.00$ 7,700.00
0017Welding Repairs - Frames and Internals (Estimate upto 100-lbs)100LBS$ 6,192.00$ 1,000.00$ 14,240.00$ 6,900.00
0018Welding Repairs, Crack Repair (Aluminum) (Estimate upto 100-lbs)100LBS$ 1,377.00$ 1,000.00$ 14,240.00$ 7,700.00
0019Weather Tight Doors1JOB$ 2,376.00$ 6,825.00$ 7,940.00$ 8,700.00
0020VESSEL CLEANING1JOB$ 1,992.00$ 350.00$ 4,795.00$ 3,300.00
0021DOCK AND SEA TRIALS1JOB$ 1,248.00$ 10,600.00$ 6,730.00$ 6,181.00
0022CURRENTLY INSTALLED ENGINES1JOB$ 744.00$ 375.00$ - 0$ 2,100.00
0023OPTION - SUPPLEMENTAL MATERIAL$ 3,600.00$ 3,600.00$ 3,600.00$ 3,600.00
0024OPTION - SUPPLEMENTAL LABOR200HR$ 7,800.00$ 15,000.00$ 12,000.00$ 12,000.00
Total$ 289,656.20$ 272,120.60$ 449,146.82$ 459,967.00
Complete the following information:
Firm:
Mailing Address:
Point of Contact (Name, Phone, Email Address):

SC Marine

QUOTE SHEET
DTMA92Q1500020
JRRF - Drydocking Repairs of Fleet Craft PG-201
ITEMDESCRIPTION OF SERVICESQUANTITYUNITUNIT PRICEAMOUNT
0001Engine Removal1JOB5,625.005,625.00
0002Remove And Inspect Both Propellor Shafts1JOB3,500.003,500.00
0003Renew Port and Starboard Water-Lubricated Shaft Bearings1JOB4,800.004,800.00
0004Remove, Inspect, and Reinstall Port and Starboard Propellers1JOB2,500.002,500.00
0005Hull Penetrations1JOB4,050.004,050.00
0006Structural Repairs1JOB1,600.001,600.00
0007Drydocking1JOB7,435.007,435.00
0008Ultrasonic Thickness (UT) Shot Inspection1JOB1,800.001,800.00
0009Preserve Underwater Body1JOB5,902.005,902.00
0010Engine Installation1JOB161,242.36161,242.36
0011Exhaust System1JOB8,625.008,625.00
0012Raw Water System1JOB2,650.002,650.00
0013Engine Controls1JOB19,441.2419,441.24
0014Welding Repairs – Flat Plate Renewal (3/8” Aluminum) (Estimate upto 100-lbs)100LBS16.001,600.00
0015Welding Repairs – Flat Plate Renewal (5/16” Aluminum) (Estimate upto 100-lbs)100LBS14.001,400.00
0016Welding Repairs – Flat Plate Renewal (1/4” Aluminum) (Estimate upto 100-lbs)100LBS12.001,200.00
0017Welding Repairs - Frames and Internals (Estimate upto 100-lbs)100LBS10.001,000.00
0018Welding Repairs, Crack Repair (Aluminum) (Estimate upto 100-lbs)100LBS10.001,000.00
0019Weather Tight Doors1JOB6,825.006,825.00
0020VESSEL CLEANING1JOB350.00350.00
0021DOCK AND SEA TRIALS1JOB10,600.0010,600.00
0022CURRENTLY INSTALLED ENGINES1JOB375.00375.00
0023OPTION - SUPPLEMENTAL MATERIAL3,600.00
0024OPTION - SUPPLEMENTAL LABOR200HR75.0015,000.00
Total272,120.60
Complete the following information:
Firm:SC Marine Group LLC
Mailing Address:3398 Stonewall Road, Hayes, VA 23072
Point of Contact (Name, Phone, Email Address):Shawn Gordon | p. 804-642-6969 m.908-917-9576 | e. sgordon@epicyachting.com

Lyon

QUOTE SHEET
DTMA92Q1500020
JRRF - Drydocking Repairs of Fleet Craft PG-201
ITEMDESCRIPTION OF SERVICESQUANTITYUNITUNIT PRICEAMOUNT
0001Engine Removal1JOB10,880.0010,880.00
0002Remove And Inspect Both Propellor Shafts1JOB6,428.006,428.00
0003Renew Port and Starboard Water-Lubricated Shaft Bearings1JOB4,720.004,720.00
0004Remove, Inspect, and Reinstall Port and Starboard Propellers1JOB3,600.003,600.00
0005Hull Penetrations1JOB2,220.002,220.00
0006Structural Repairs1JOB1,814.001,814.00
0007Drydocking1JOB6,920.006,920.00
0008Ultrasonic Thickness (UT) Shot Inspection1JOB2,384.002,384.00
0009Preserve Underwater Body1JOB50,200.0050,200.00
0010Engine Installation1JOB258480258,480.00
0011Exhaust System1JOB21,860.0021,860.00
0012Raw Water System1JOB13,200.0013,200.00
0013Engine Controls1JOB6,180.006,180.00
0014Welding Repairs – Flat Plate Renewal (3/8” Aluminum) (Estimate upto 100-lbs)100LBS60.006,000.00
0015Welding Repairs – Flat Plate Renewal (5/16” Aluminum) (Estimate upto 100-lbs)100LBS69.006,900.00
0016Welding Repairs – Flat Plate Renewal (1/4” Aluminum) (Estimate upto 100-lbs)100LBS77.007,700.00
0017Welding Repairs - Frames and Internals (Estimate upto 100-lbs)100LBS69.006,900.00
0018Welding Repairs, Crack Repair (Aluminum) (Estimate upto 100-lbs)100LBS77.007,700.00
0019Weather Tight Doors1JOB8,700.008,700.00
0020VESSEL CLEANING1JOB3,300.003,300.00
0021DOCK AND SEA TRIALS1JOB6,181.006,181.00
0022CURRENTLY INSTALLED ENGINES1JOB2,100.002,100.00
0023OPTION - SUPPLEMENTAL MATERIAL3,600.00
0024OPTION - SUPPLEMENTAL LABOR200HR60.0012,000.00
Total459,967.00
Complete the following information:
Firm:Lyon Shipyard Inc.
Mailing Address: 1818 Brown Ave Norfolk, VA 23504
Point of Contact (Name, Phone, Email Address):
Mark LaDolcetta; 757-352-2888; mladolcetta@lyonshipyard.com

Davis

QUOTE SHEET - Attachment 1
6933A217Q00008
T.S. KENNEDY - Installation of New Government-Furnished SMARDT AC Plant
ITEMDESCRIPTION OF SERVICESQUANTITYUNITUNIT PRICEAMOUNT
0001INSTALLATION OF NEW GOVERNMENT-FURNISHED SMARDT AC PLANT1JOB
0002OPTION - INSTALL NEW PANEL ENCLOSURES, INCLUDING ALL INTERNAL PIECES AND CONNECTIONS, REMOTE ALARMS, POWER METERS, NAMEPLATES, AND CABLES1JOB
0003INSTALL SMARDT AC PLANT SEAWATER COOLING PIPING1JOB
0004OPTION - SMARTDT AC PLANT CHILLED WATER COOLING PIPING REMOVAL & INSTALL SCOPE OF WORK1JOB
0006SUPPLEMENTAL LABOR: Contractor shall furnish a unit price quote for 120 man-hours of supplemental labor. This shall be a fully burdened labor rate, and is applicable seven days a week (i.e. no overtime, penalty time or other escalations will apply). These hours will only be allocated for industrial labor. Supervision, management, QA, and other such labor is considered part of the rate burden. Supplemental hours, if authorized, will be allocated by the COR via Delivery Orders in accordance with Clause MCL H-2.120HR- 0
0007SUPPLEMENTAL MATERIAL: Contractor shall provide an allowance for up to $15,000 in Supplemental Material charges in accordance with MCL.H-2. There shall be no burden on these charges for either subcontracted costs or material charges. If Supplemental Material is required, it will be allocated by the COTR via Delivery Orders. Supplemental material, if authorized, will be allocated by the COTR via Delivery Orders.15,000.00
Total15,000.00
Complete the following information:
Firm:
Mailing Address:
Point of Contact (Name, Phone, Email Address):

Sheet2

Sheet3

File details come from the government source that posted it. Updated .