This is Standard Form 30, Amendment 0002 to Solicitation 6923G226Q000034, issued by the Maritime Administration (USMMA Procurement) located in Kings Point, New York. The amendment extends the solicitation closing date to September 16, 2026, at 11:59 PM EST and provides an updated Questions and Answers list as of September 8, 2026, along with Attachment C containing ACM Lead Reports.

The solicitation concerns Patten Hall Renovation Project, which involves interior renovations, abatement, and mechanical/electrical/plumbing (MEP) upgrades rather than roofing work (roof repairs have been removed from requirements). Key technical specifications include textile composite floor tiles sized 24"x24" with face weight between 12-22 oz per square yard; fully welded steel cabinets of 14-to-16-gauge steel with full extension drawer slides rated for 200+ pounds weight capacity; and a backup generator and automatic transfer switch sized based on electrical requirements of specified areas. The Davis-Bacon wage determination applicable is NY20260012 for Suffolk/Nassau County. The project has a 365-day performance period during normal business hours (0700 to 1630), with Patten Clinic remaining operational during renovation work. Contractors must quote labor and materials for four individual plumbing repairs (estimated at fifteen feet per repair), and the Government will provide removal and return of medical equipment, furniture, sensitive records, and other materials. Site visits are no longer available, and drawings are provided in Attachments A, B, and D.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Theodore J. Nigro

See continuation page

MARITIME ADMINISTRATION

USMMA PROCUREMENT

300 STEAMBOAT ROAD

KINGS POINT NY 11024-1699

6923G2

6923G226Q000034

09/08/2026

08/26/2026

1 5

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

6923G226Q000034/0002

The purpose of this amendment is to:

1. EXTEND THE SOLICITATION CLOSING DATE TO

SEPTEMBER 16, 2026, at 11:59 PM EST.

2. Provide the updated Questions and Answers list as of 8 September 2026, which is included in the document body of the Amendment 0002 document. NOTE: The Questions and Answers numbering order is corrected.

3. Provide Attachment C, ACM Lead Reports

(attached to the SAM.Gov Notice ID

6923G226Q000034 attachments section.

Q& A Updated Solicitation 6923G226R000005

8-Sep-26 Patten Hall Renovations

Question 1 Section L (Site Visit) instructs bidders to use the email subject line "Roof

Replacement of DPW Buildings". Shortly after, under "General Instructions," the text instructs bidders to use the subject line

"Patten Hall Renovation Project". Please clarify which subject line is required for official correspondence.

Answer 1 Any reference to roof repairs is in error. Roof repairs, whether referencing Patten

Hall or the DPW buildings, are removed from the requirement. The subject line for emails shall include "Solicitation 6923G226Q000034" and

"Patten Hall Renovation Project".

Question 2 Section L (Quotation Preparation) mandates that past performance examples must include a description of the "roof type," and

Section D mentions shipping products to the job site for "roofing purposes". Since the Section

C Statement of Work involves interior renovations, abatement, and MEP upgrades rather than roofing, please confirm bidders should submit relevant interior/MEP experience instead of roofing experience.

Answer 2 Roof repairs are removed from the requirement as stated in Question and Answer 1.

The relevant technical experience (past

Continued...

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) contract examples" shall be related to the requirements stated in Section C.

Question 3 The specific Davis-Bacon General

Wage Decision for Nassau County is not attached to the solicitation. Please provide the applicable wage determination so accurate labor burdens can be calculated.

Answer 3 The primary Davis-Bacon General Wage

Decision (WD) for Nassau County, New York, is

NY20260012. Pull the latest WD for NY20260012 from SAM.gov by going to the SAM.gov Home Page, click on the Wage Determinations link, insert

NY20260012 in the Wage Determination search line, and download the WD NY20260012 for

Suffolk/Nassau.

Question 4 Is there a cutoff for submitting questions?

Answer 4 The cutoff for submitting questions is

8 September 2020 by 11:59 PM.

Question 5 We would be interested to provide a proposal for this project! Will there be a way to schedule a site visit?

Answer 5 There will be no more site visits. We had two site visits this week and the date to submit final Questions is 8 September 2026.

Question 6 Are drawings available for this project?

Answer 6 They are to be provided on

Solicitation Amendment 1.

Question 7 Do you have a manufacturer and model for the textile tile flooring?

Answer 7 Textile Composite Floor (tiles) or equivalent modular carpet tiles- Sized at

24¿x24¿ with a face weight between 12-22 oz per square yard, no thicker than ¼¿.

Question 8 Do you have a manufacturer for the

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) metal cabinets?

Answer 8 No, but the cabinet selected must be fully welded, of 14-to-16-gauge steel, and with full extension drawer slides rated at no less than 200 pounds weight capacity.

Question 9 Can you provide the abatement report?

Answer 9 Attachment C, ACM Lead Reports

Question 10 Do you have a manufacturer and model for the backup generator? Would you be able to provide the KW requirement for the generator?

Answer 10 We do not have a recommended type.

Contractor to propose an adequately sized generator based upon electrical requirements of the specified areas stated in the Statement of

Work.

Question 11 Can you provide the floor plan for the building?

Answer 11 Attachments A, B and D.

Question 12 Section 26 requires a new backup generator and ATS but does not specify the required kW/kVA rating. Please provide the generator sizing and confirm if a natural gas supply line currently exists at the designated concrete pad location.

Answer 12 Building currently has natural gas supply in the building. Contractor to provide adequately sized and rated generator based upon the electrical requirements of the specified areas.

Question 13 Sections 18 and 20 require the contractor to locate and repair plumbing leaks on the 2nd and 3rd floors. Will the Government establish a predetermined bid allowance for these repairs since the extent of concealed pipe damage is unknown?

Answer 13 For solicitation evaluation purposes, Contractors shall quote the labor and material

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C) estimated for four individual plumbing repairs, estimated at fifteen feet per job repair.

Question 14 Sections 24 and 25 require lead and asbestos abatement. Will USMMA personnel clear medical equipment, furniture, and sensitive records from these spaces prior to mobilization, or must the contractor include secure moving and storage in their firm-fixed-price proposal?

Answer 14 All medical equipment, furniture, sensitive records, and other pertinent material will be removed and returned by the

Government.

Question 15 The period of performance is 365 days during normal business hours of 0700 to

1630. Will Patten Hall remain fully occupied and operational during these hours, and if so, are there specific phasing requirements or restrictions for noisy work and utility shutdowns?

Answer 15 Patten Clinic will remain operational during renovation. We will coordinate the partial shutdown of specific rooms as needed.

There are given vacation breaks on the campus which the Contractor can include in its phased planning of scheduled work.

Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

2026-09-08T15:31:25-0400
THEODORE JOHN NIGRO JR