About this file
This document is Amendment 003 to Solicitation 6923G226Q000017 issued by the Maritime Administration (USMMA Procurement) and serves as a Questions and Answers response document. The amendment posts governmental responses to contractor inquiries regarding a refurbishment project scheduled for performance from July 1, 2026 to February 1, 2027.
The project encompasses renovation of locker room and bathroom facilities at the U.S. Merchant Marine Academy, Kings Point, New York. Scope includes flooring installation (Regupol or approved equal system), masonry repairs to column bases, HVAC support and minor improvements, electrical work including NFPA 101 means of egress compliance and 13-inch LED ceiling flush mount disk lights (wet-location rated), plumbing with heavy-duty shower drains, door and window repair/replacement (repair and reuse as baseline expectation), locker fabrication and installation, and miscellaneous interior finishing. The government clarifies that the project is a limited life-extension refurbishment, not full modernization, favoring repair and reuse where practical, with anticipated defects included in base scope and unforeseen latent conditions handled under Differing Site Conditions. All quotes will be evaluated on highest technical rating with fair and reasonable pricing; missing technical documents will render offers nonresponsive. Key administrative requirements include 2-business-day government review timelines for submittals and RFIs, weekly progress meetings with standardized reporting, and COR approval for product substitutions via formal submittal process. Contractor shall provide reasonable allowances typical for aged facility refurbishment and perform field verification as-built drawings are not guaranteed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 2 - SF30.pdf | ||
| Amendment 1 - SF30.pdf | ||
| Attachment 2 - Lockers Layout.pdf | ||
| 6923G226Q000017 - Solicitation.pdf | ||
| Attachment 1 - QA Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: is not is required copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7.ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
PAGESOF
Contractor
The hour and date specified for receipt of Offers to sign this document and return
Theodore J. Nigro
See continuation page
MARITIME ADMINISTRATION
USMMA PROCUREMENT
300 STEAMBOAT ROAD
KINGS POINT NY 11024-1699
6923G2
6923G226Q000017
06/23/2026
06/11/2026
1 11
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
6923G226Q000017/0003
The purposes of this Amendment are to post the additional governmental response to the
Questions & Answers submitted.
NOTE: All quotes will be evaluated based on the
Highest Technically rated with a fair and
Reasonable Priced. The Government will evaluate all offers basis to determine if the offeror meets the requirements described in the SOW and past performance of similar size, scope and complexity.
Missing Technical documents will deem your offer nonresponsive.
Period of Performance: 07/01/2026 to
02/01/2027
6923G226Q000017 - Questions
6923G226Q000017 Page 3 of 11
Flooring
1.1.8 – Can you define “acceptable limits”. Is there a technical reference? Who will decide if the limits are acceptable? Can you describe the process to obtain approval from manufacturer?
Response: Acceptable limits shall be as defined by the flooring manufacturer (Regupol or approved equal) for the specified system. Contractor shall test and comply with manufacturer’s published requirements and submit results to COR for review prior to mitigation. Installation must follow manufacturer instructions.
1.1.9.- Could you please clarify who is responsible for establishing the requirements for the scope of work labeled “as required'? If the scope of work is not clearly defined and it needs a post-award determination by a third party if work is required or not could you clarify how the requested fixed price should be determined? Understanding this will help ensure that all parties are aligned on expectations and responsibilities."
Response: These items shall be determined based on field conditions observed during construction and must be coordinated with the COR. Bidders shall include reasonable allowances typical for refurbishment work in an aged facility, not full reconstruction.
1.1.10- Could you please clarify who is responsible for establishing the requirements for the scope of work labeled “as necessary'? If the scope of work is not clearly defined and it needs a post-award determination by a third party if work is necessary or not could you clarify how the requested fixed price should be determined? Understanding this will help ensure that all parties are aligned on expectations and responsibilities."
Response: These items shall be determined based on field conditions observed during construction and must be coordinated with the COR. Bidders shall include reasonable allowances typical for refurbishment work in an aged facility, not full reconstruction.
1.1.11- "Can you specify the level of expectation regarding the 'repair ALL cracks' requirement? Specifically, could you provide details on the number, dimensions, and types of cracks to be addressed? This information will help us accurately scope and plan the repairs.
Response: Repair is limited to visible, active, or installation-impacting defects necessary to achieve a sound, uniform substrate suitable for flooring installation, not cosmetic repair of all hairline cracking.
6923G226Q000017 Page 4 of 11
1.1.16- Could you please clarify who is responsible for establishing the requirements for the scope of work labeled “required'? Understanding this will help ensure that all parties are aligned on expectations and responsibilities."
Response: These items shall be determined based on field conditions observed during construction and must be coordinated with the COR. Bidders shall include reasonable allowances typical for refurbishment work in an aged facility, not full reconstruction.
Masonry
1.1.1 – Can you define the number of column bases?
Response: Contractor shall verify field conditions. Scope is limited to repair of existing column bases observed within work areas, not replacement or structural reconstruction.
HVAC
1.2. 3- Could you please clarify who is responsible for establishing the requirements for the scope of work labeled “as necessary'? If the scope of work is not clearly defined and it needs a post-award determination by a third party if work is necessary or not could you clarify how the requested fixed price should be determined? Understanding this will help ensure that all parties are aligned on expectations and responsibilities."
Response: Limited to support, repair, insulation, and minor improvements to existing systems. Full system redesign or replacement is not included, unless required for code compliance or to restore function.
Electric
1.3.3 – Please confirm that the requirement labeled “provide all required means of egress in accordance with NFPA 101” is limited to electrical systems and that architectural or structural modifications are not required in the scope of work.
Response: Requirement is limited to electrical scope only (lighting, exit signs, emergency power). No structural or architectural reconfiguration is required.
1.3.4- Could you please clarify who is responsible for establishing the requirements for the scope of work labeled “as necessary'? If the scope of work is not clearly defined and it needs a post-award determination by a third party if work is necessary or not could you clarify how the requested fixed price should be determined? Understanding this will help ensure that all parties are aligned on expectations and responsibilities. "If existing wiring
6923G226Q000017 Page 5 of 11 and accessories are inaccessible and cannot be “ensured” or guaranteed for compliance with NFPA 70, will there be a modification to the scope of work?
Response: Work is limited to accessible systems within project areas. If concealed conditions prevent verification or compliance, contractor shall notify COR. Any major upgrades beyond visible/accessed systems may be handled via modification.
Miscellaneous
1.4.2 - "In light of the substantial price difference between repairing or replacing doors, could you clarify how the requested fixed price should be determined? Should we assume, the door will be replaced in our price estimate? Additionally, can you establish the process for assessing the condition of the door for the use? Will the General Contractor have the authority to make that determination? This will help that both parties have a mutual understanding and agreement on the implications between repair or replace." Can you confirm that the door frame will be reutilized?
Response: Repair and reuse is the baseline expectation. Replacement only where doors are non-functional, unsafe, or non-compliant. Contractor shall carry pricing for typical refurbishment conditions—not full replacement. Frames to remain where serviceable
1.4.3 - Could you please clarify who is responsible for establishing the requirements for the scope of work labeled “as required'? If the scope of work is not clearly defined and it needs a post-award determination by a third party if work is required or not, could you clarify how the requested fixed price should be determined? Understanding this will help ensure that all parties are aligned on expectations and responsibilities." Please confirm that if the assigned authority does not establish the requirement for door replacement, the government has confirmed that the required hardware retrofits can be performed.
Response: COR will make final determination. If door is retained, contractor shall perform required hardware updates to provide operational condition.
1.4.4- Please confirm that the government has confirmed that the existing plywood panel to be refurbished is an appropriate material to resist outdoor weather conditions with the specified finishing method.
Response: Existing plywood to be reused and refinished as specified; no replacement required unless deteriorated beyond repair.
6923G226Q000017 Page 6 of 11
Women’s Locker Room
Flooring
2.1.2 - The scope of work requires the removal of “contaminants” from the concrete substrate. Please define the level and type of contamination and that the government has established that existing contamination is not composed of hazardous materials. What is the standard to remove or mitigate the contaminants?
Response: Contaminants include adhesives, coatings, oils, debris, and surface residues typical of aged locker rooms. Hazardous materials are not anticipated, but contractor must follow SOW procedures if discovered
2.1.6. - Please define the standard that shall be met to establish the “approved cleaning method”
Response: Cleaning must follow industry standard mechanical prep + HEPA cleaning, and be acceptable to flooring manufacturer requirements.
Lockers
3.2.1 – Can you confirm that individual existing lockers fit through the door?
Response: Assume removal via existing openings with standard disassembly as needed.
3.2.3 - Item 3.2.2 requires that the configuration and lay-out conform with the attached lay-out. However 3.2.3 requires that the final lay-out and configuration is approved by the COR. Has the COR approved the attached lay-out referred to in 3.2.2.? Both items seem to be contradictory. Can you please clarify?
Response: The attached layout is conceptual. Final layout requires COR approval prior to fabrication, which governs.
3.2.4- Can you define the electrical requirements of each locker? Do they require power?
Can you define the locker attachment method to the wall? Can you define the floor level tolerance for the installation of the lockers?
6923G226Q000017 Page 7 of 11
Response:
• Lockers do not require power unless noted otherwise
• Mounting: anchored to wall/floor as per manufacturer
• Floor tolerances: assume typical slab conditions; minor leveling included, not full slab correction
Miscellaneous
3.7.1 - "In light of the substantial price difference between repairing or replacing the window, could you clarify how the requested fixed price should be determined? Should we assume, the window will be replaced? Additionally, can you establish the process for assessing the condition of the window for the use? Will the General Contractor have the authority to make that determination? This will help that both parties have a mutual understanding and agreement on the implications between repair or replace." Can you confirm that the window sill and flashing will be reutilized?
Response: Repair and reuse is the baseline. Replacement only if required to restore operation or weather performance. Sill/flashing to remain where serviceable.
3.7.3 - Can you define “cementitious masonry material”? The requirement is to restore wall integrity. To ensure we fully understand the requirement regarding restoring the integrity of the masonry wall, could you please provide additional details on the specific standards or criteria you expect for this restoration? Clarifying these expectations will help us accurately assess the work needed to achieve the desired outcome and ensure that all parties are aligned."
Response: Standard cement-based patching/grout compatible with CMU, used to restore integrity and finish continuity—not structural rebuilding.
Visitor Bathroom
4.1.2- Could you please specify what you mean by 'proper floor drainage'? It would be helpful to understand the standards, dimensions, and design elements you expect to ensure effective drainage and to address any potential issues. Can you confirm that the floor drain invert will not be modified as it is not included in the scope of work?
Response: Provide positive slope to existing drains per ANSI/TCNA standards. Drain invert elevations are not to be modified.
6923G226Q000017 Page 8 of 11
PROJECT ACTIVITIES
6. Approvals. – Please establish the time scheduled by the government to review and return submittal with comments. This will assist us to accurately prepare the schedule needed to achieve the desired outcome and ensure that all parties are aligned."
Response: 2 Business days
9. Weekly progress meeting. – Please define the “report” requirements. What are the expectations and contents of the report? Who should attend the meeting on behalf of the General Contractor?
Response: Report shall include:
• Progress summary
• Schedule update
• Issues/RFIs
• Safety notes
• Upcoming activities
11. Acceptance - Please define the process for acceptance. Please define the process to establish substantial completion.
Response:
• Substantial Completion: space is usable for intended function
• Final Acceptance: all punch list items complete and documentation submitted
Other:
1- Please define the process for product substitutions.
Response: Submit via formal submittal process for COR approval prior to procurement.
6923G226Q000017 Page 9 of 11
2- Please define the process to issue and respond to Requests For Information.
Specifically the time allocated for the government to respond to Requests For Information.
Response: Target 2 business days depending on complexity.
3- Will the General Contractor have access to power during construction? Will temporary power be required?
Response: Existing building utilities will be available where accessible, but contractor shall carry minor temporary provisions as needed.
4- Will the General Contractor have access to heating in the winter months during construction? Will temporary heat be required?
Response: Existing building utilities will be available where accessible, but contractor shall carry minor temporary provisions as needed.
5- Will the General Contractor and its subconsultants have access to restroom facilities during construction? Office space for the superintendent?
Response: Limited access to restrooms and staging areas may be coordinated
No dedicated office guaranteed
6- Will the General Contractor have access to water during construction?
Response: Yes
7- Will the General Contractor have access to secured spaces to store materials and equipment?
Response: Limited secure storage may be coordinated
8- The contract incorporates FAR 52.236.21 Specifications and Drawings For Construction. This project does not include drawings for construction. Please confirm if the Statement Of Work shall be considered as the Specifications For Construction and that all clauses in the FAR referring to the Specifications will be referenced to the Scope of Work.
Response: The Statement of Work serves as the governing technical specification for construction.
9- Can the government provide us with as-built drawings?
Response: Not guaranteed; contractor shall rely on field verification.
6923G226Q000017 Page 10 of 11
10- Is the area to be renovated watertight?
Response: Building is assumed generally serviceable but aged; minor infiltration conditions may exist and should be handled as part of refurbishment intent.
OTHERS:
1 General Abacus do not have pricing as of yet for Lockers or flooring, still TBD.
Apparently will be forwarded no later than 6/24. Response: Due date is 6/26/26.
2 Flooring 1.1.11/1.1.12 For all existing concrete slabs? Is contractor responsible for unforeseen unfloor slab cracks ?
Response:
Yes – requirements apply to all existing concrete slabs within the project areas.
Per SOW, the Contractor is responsible to:
• “Repair all cracks, spalled areas, holes, and surface defects”
• “Feather and smooth repairs to provide a uniform substrate” [6923G226Q0...licitation | PDF]
Interpretation / Intent:
• Anticipated slab defects are included in base scope (minor/moderate repairs typical of an aging facility).
• Unforeseen latent conditions (e.g., structural failure, extensive slab replacement) shall be addressed under Differing Site Conditions and brought to COR/CO for direction before proceeding.
3 Lockers 3.2.2/3.2.3 For any revision to the locker layout?
The number of lockers for supply will remain @ #25 pieces ?
Response: Not accurate, please see Locker quantity is defined in layout.
4 Lockers 3.2.4 For relocated electrical, piping etc. everything is to remain surface mounted ?
Response: Clarification / Intent:
• Systems should remain surface-mounted where feasible to minimize invasive work, consistent with a modest refurbishment.
https://usmmadoit-my.sharepoint.com/personal/mcinnisc_usmma_edu/Documents/Microsoft%20Copilot%20Chat%20Files/6923G226Q000017+-+Solicitation.pdf
6923G226Q000017 Page 11 of 11
• Concealment is not required unless specifically necessary for safety, code compliance, or functionality.
• All relocations must remain code-compliant.
5 Electric 5.5.2 Is there a spec. for the LED Flush mount ceiling lights ?
Response:
Yes – the specification is as follows:
• 13-inch LED Ceiling Flush Mount Disk Lights
• Wet-location rated
• Final layout and fixture selection subject to COR approval via submittals
6 Plumbing 5.7.3 Is there a spec for the shower drains? Are they custom made or an ordered item ?
Response:
Shower drains shall be:
• Heavy-duty floor drains with hair-catching basins
• Fully removed and replaced
• Cleaned and restored for proper function
Clarification / Intent:
• Drains are standard commercial products, not custom fabricated.
• Final selection shall be submitted via cut sheets for COR approval per Submittals section.
OVERALL PROJECT INTENT
This project is a limited, life-extension refurbishment, not a full modernization.
Accordingly:
• Favor repair, reuse, and surface-mounted solutions where practical
• Avoid unnecessary demolition or infrastructure upgrades
• Focus on durability, code compliance, and 5–6 year service life extension
| Amendment of solicitation/modification of contract |
| Contract ID code |
| Amendment/modification number |
| Effective date |
| Requisition/purchase requisition number |
| Project number |
| Issued by |
| Code |
| Administered by |
| Code |
| Name and address of contractor |
| Code |
| Facility code |
| Amendment of solicitation number |
| Dated |
| Modification of contract/order number |
| Dated |
| This item only applies to amendments of solicitations |
| Accounting and appropriation data |
| This item applies only to modifications of contracts/orders. |
| This change order is issued pursuant to: |
| The above numbered contract/order is modified to reflect the administrative changes |
| This supplemental agreement is entered into pursuant to authority of: |
| Other |
| Important: |
| Description of amendment/modification |
| Name and title of signer |
| Contractor/offeror |
| Date signed |
| Name and title of contracting officer |
| Signature of Contracting Officer |
| Date signed |
| Previous edition unusable |
| Standard form 30 (rev. 11/2016) |
| Continuation sheet |
| Reference Number |
| Name of Offeror or Contractor |
| OPTIONAL FORM 336 (4-86)) |
Sponsored by GSA FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .