Attachments 1-7 FrogSwitch_HazmatSurvey_SOW.pdf

PDF 9 MB Posted

Attached to
Hazardous Building Materials Sampling Survey Frog, Switch & Manufacturing Company, Carlisle, PA
Solicitation number
6913G625Q300045
Issued by

About this file

This document is a Statement of Work (SOW) for a Hazardous Building Materials Sampling Survey at the former Frog, Switch & Manufacturing Company in Carlisle, Pennsylvania, commissioned by the U.S. Department of Transportation's Volpe National Transportation Systems Center under an Interagency Agreement with the EPA Targeted Brownfields Assessments program. The survey requires a Pennsylvania-certified asbestos inspector to conduct a comprehensive investigation of hazardous building materials across multiple site structures, including collecting bulk samples to identify and document the presence, locations, and quantities of asbestos-containing materials (ACM), lead-based paint (LBP), and polychlorinated biphenyls (PCBs).

The contractor will perform a visual inspection of accessible areas, collect approximately 111 bulk material samples for laboratory analysis, and prepare a detailed report documenting findings, including sample locations, material conditions, quantities, photographs, and recommendations for potential renovation, demolition, or redevelopment activities. The work must comply with federal, state, and local regulations, with the survey covering buildings such as machine shops, foundry complex, pattern shops, and offices. The period of performance is from the date of award to November 1, 2025, with fieldwork to be completed as soon as possible after contract award, and approximate work hours from 8:00 a.m. to 4:30 p.m. Monday through Friday.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

except

SOP-24

Hazardous Building Materials Survey

Table 1 - Deliverable Schedule and Details

¯0 400 800 1,200 1,600 Feet

Attachment 1 Site Location

Field Sampling Plan

Frog, Switch & Manufacturing Company 600 East High St

Carlisle, PA U.S. Department of Transportation

Volpe National Transportation Systems Center May 2025

Spatial Reference:

NAD 1983 UTM Zone 18N Upper Left: 1027895E 14611347.97N ft

Sources: Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, (c) OpenStreetMap contributors, and the GIS User Community, Sources: Esri, TomTom, Garmin, FAO, NOAA, USGS, © OpenStreetMap contributors, and the GIS User Community, Esri, USGS, Maxar

0 40 80 Miles

Property Boundary (approx.)

02-21-0318-353

02-21-0316-045

-2

1-

-0

-21

-03

-04

-2

1-

-0

-2

1-

-0

-2

1-

-0

02-21-0316-047

-2

1-

-3

-2

1-

-3

0 250 500 Feet

Tax Parcels Site Location

AL250040001

M ay

5, :4 3p m e bi dl in gm ey er

G :\J

O

BS

\0

4\

0\ D

W G

\A L2

.d w g L ay ou t:

AL

-1

4x

0S

C

D es c.

R

EV

IS

IO

N

S D at e

N o.

Title

EA

ST

H

IG

H S

TR

EE

T

Sheet No. 1 OF 3

Xr ef

(s

XY

CAD File:

4/28/2025

FB 598 PG 4-5

Project No.

Date

Reviewed

Scale

Drawn Surveyed

Field Book

2025 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.C

La nd

S ur ve yi ng En vi ro nm en ta l

En gi ne er in g

Ar ch ite ct ur e

TH

E

FR

O

G , S

W

ITC

H

M A

N

UF

A C

TU

RI

N G

C O

M

PA

N Y

1"=80'

CR

EB

RL

AL-1

ALTA/NSPS

LAND TITLE

SURVEY

2601 Market Place

(717) 651-9850 Harrisburg, PA 17110

Suite 350

2500400

LOCATION MAP

NOT TO SCALE

SITE

TITLE COMMITMENT INFORMATION

GENERAL NOTES

MAP REFERENCES

UTILITY NOTE

SURVEYED LEGAL DESCRIPTION

SURVEY CERTIFICATION

BO

R

O U

G H

O F

C

AR

LI

SL

E, C

U M

BE

R

LA

N

D C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

Fi na l T itl e C om m itm en t 5/

/2 ay

5, :4 3p m e bi dl in gm ey er

G :\J

O

BS

\0

4\

0\ D

W G

\A L2

.d w g L ay ou t:

AL

-1

4x

0S

C o f 3

D es c.

R

EV

IS

IO

N

S D at e

N o.

Title

EA

ST

H

IG

H S

TR

EE

T

Sheet No. 2 OF 3

Xr ef

(s

XY

CAD File:

4/28/2025

FB 598 PG 4-5

Project No.

Date

Reviewed

Scale

Drawn Surveyed

Field Book

2025 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.C

La nd

S ur ve yi ng En vi ro nm en ta l

En gi ne er in g

Ar ch ite ct ur e

TH

E

FR

O

G S

W

ITC

H A

N D

M A

N

UF

A C

TU

RI

N G

C O

M

PA

N Y

1"=50'

CR

EB

RL

AL-1

ALTA/NSPS

LAND TITLE

SURVEY

2601 Market Place

(717) 651-9850 Harrisburg, PA 17110

Suite 350

2500400

LEGEND

BO

R

O U

G H

O F

C

AR

LI

SL

E, C

U M

BE

R

LA

N

D C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

Fi na l T itl e C om m itm en t 5/

/2 ay

5, :4 3p m e bi dl in gm ey er

G :\J

O

BS

\0

4\

0\ D

W G

\A L2

.d w g L ay ou t:

AL

-1

4x

0S

C o f 3

D es c.

R

EV

IS

IO

N

S D at e

N o.

Title

EA

ST

H

IG

H S

TR

EE

T

Sheet No. 3 OF 3

Xr ef

(s

XY

CAD File:

4/28/2025

FB 598 PG 4-5

Project No.

Date

Reviewed

Scale

Drawn Surveyed

Field Book

2025 BL COMPANIES, INC. THESE DRAWINGS SHALL NOT BE UTILIZED BY ANY PERSON, FIRM OR CORPORATION WITHOUT THE SPECIFIC WRITTEN PERMISSION OF BL COMPANIES.C

La nd

S ur ve yi ng En vi ro nm en ta l

En gi ne er in g

Ar ch ite ct ur e

TH

E

FR

O

G S

W

ITC

H A

N D

M A

N

UF

A C

TU

RI

N G

C O

M

PA

N Y

1"=50'

CR

EB

RL

AL-1

ALTA/NSPS

LAND TITLE

SURVEY

2601 Market Place

(717) 651-9850 Harrisburg, PA 17110

Suite 350

2500400

BO

R

O U

G H

O F

C

AR

LI

SL

E, C

U M

BE

R

LA

N

D C

O U

N

TY

, P

EN

N

SY

LV

AN

IA

Fi na l T itl e C om m itm en t 5/

/2

SOP 024 – Hazardous Building Materials Survey Page 1 of 4

1.0Introduction

Environmental investigations may include the assessment of buildings or structures that potentially contain hazardous building materials. This can include but is not limited to asbestos-containing materials, lead-based paints, and PCB-containing materials. This Volpe SOP outlines the procedures for conducting a hazardous building materials survey and should be used by Volpe in conjunction with the professional judgement of an accredited inspector.

This SOP does not cover the proper use of respiratory protection which should be appropriately utilized by the inspector in accordance with the contractor’s HASP and SOPs.

2.0Definitions

1. Asbestos-containing Material (ACM) – a material that contains greater than 1% asbestos

2. Friable – ACM that can be crumbled, pulverized, or crushed into a powder with hand pressure when dry

3. Surfacing Material (SM) – ACM that is sprayed, troweled, or otherwise applied to surfaces (walls, ceilings, structural members) for acoustical, fireproofing insulation, or for other purposes such as decoration.

4. Thermal System Insulation (TSI) – ACM applied to pipes, boilers, tanks, ducts, etc. to prevent heat loss, heat gain, or water condensation

5. Miscellaneous (MISC) – ACM that does not include SM or TSI

6. Lead-based Paint – Paint that contains lead at concentrations greater than or equal to 0.5% by weight, or 5,000 mg/kg

7. Polychlorinated biphenyl (PCB)-containing material – a material that contains PCBs at greater than or equal to 50 parts per million by weight

3.0Equipment

1. Personal protective equipment (PPE)

2. Warning signage

3. Site-specific Health and Safety Plan (HASP)

4. Field notebook

5. Camera

6. Contractor/Inspector-supplied sampling equipment

7. Paint scraper

8. Utility knife

9. Hand tools (e.g. screwdriver, wrench, etc.)

10. Pocket scale

Standard Operation Procedure (SOP) Prepared: J. Klaybor

Title: Hazardous Building Materials Survey Reviewed: C. Fry

No: 024 Ver. 1.0 Date: 06/09/23 Approval:

SOP 024 – Hazardous Building Materials Survey Page 2 of 4

11. Sample containers

4.0Procedures

1. Once a building inspection is deemed necessary, Volpe shall contract the appropriate person(s) to complete the work. Volpe will share the survey scope and pertinent details with the inspector including building plans, photographs, and previous inspection survey reports as they are available. Volpe shall inform the inspector whether or not destructive samples may be collected as part of the survey.

2. The inspector shall be accredited under the Asbestos Hazard Emergency Response Act (AHERA) to conduct an asbestos building inspection. The inspector must additionally be licensed by the state in which the building is located, if applicable. The inspector shall provide a copy of all certifications and licenses to the Volpe Program Manager prior to conducting the work.

3. Volpe will coordinate building access with the site owner and EPA during a time that minimizes disturbances.

Ensure that all parts of the building will be accessible and unlocked. If any parts of the building are unsafe or otherwise inaccessible, communicate this with the inspector and ensure that this information is included in the final survey inspection report.

4. Begin the inspection by performing a building walk through with the inspector and site owner to review the building layout and identify areas where sampling will be required.

44.1 Asbestos

5. An asbestos building inspection may be included as part of the hazardous building materials survey. The inspector shall inspect for friable and non-friable ACM by either collecting bulk samples and having them analyzed or assuming a material contains asbestos. The inspector shall coordinate with Volpe to develop a sampling plan, which should generally include the collection of the following bulk material samples for asbestos analysis:

a. For surfacing material, a minimum of three samples shall be collected from each homogeneous area that is 1,000 ft2 or less, five from each homogenous area that is greater than 1,000 ft2 but less than or equal to 5,000 ft2, and seven from each homogeneous area that is greater than 5,000 ft2.

b. For thermal systems insulation, a minimum of three samples shall be collected from each area plus one sample per patched section if the patch is less than six square or linear feet. No samples need to be collected from any homogenous area of thermal system installation if the inspector determines that the TSI is fiberglass, foam, rubber, or other non-asbestos-containing building material.

c. For miscellaneous material, a minimum of two samples shall be taken from each homogeneous area of friable miscellaneous material.

d. A material may be assumed to be ACM instead of sampled.

6. If bulk material samples are to be collected, the area should be secured so that all persons not directly involved in the sample collection are excluded from the work area. Warning signs shall be posted at each entrance.

7. The inspector shall don all appropriate PPE according to regulations, the HASP, and contractor SOPs. This includes but is not limited to a properly fitting respiratory protection, gloves, eye protection and, if friable asbestos is expected to be disturbed, protective clothing.

8. The inspector shall collect bulk samples according to their own SOPs but should follow best practices including ensuring that the area being sampled is sufficiently wet, decontaminating sampling tools between sample locations, and minimizing disturbance to the material being sampled.

SOP 024 – Hazardous Building Materials Survey Page 3 of 4

9. The inspector shall map the location of all samples on a drawing that includes the building layout and sample IDs.

10. All bulk material samples shall be sent to a state-certified laboratory to be analyzed by either transmission electron microscopy (TEM) or polarized light microscopy (PLM) as deemed appropriate by the inspector. Positive stop analysis may be utilized when asbestos is identified at a concentration greater than 1% in one of multiple samples of similar material.

11. The inspector shall prepare and submit an asbestos building inspection survey report that includes a summary of materials identified or assumed to be ACM. A description of each ACM shall include the material’s location, condition, friability, length or area, and a photograph. The sample location drawings, laboratory analytical results, and inspector certifications shall be appended to the report.

44.2 Lead

12. Paints produced prior to 1978 may be lead-based. A hazardous building materials survey may include the analysis of paints to determine lead concentrations. Paint may be surveyed by a contracted inspector or by Volpe field staff who have been trained in sample collection if the surfaces to be sampled are known to not be ACM.

13. Each unique color and layer of paint on the building’s interior and exterior shall be sampled.

14. The sampler shall don appropriate PPE according to the HASP, which includes gloves and eye protection.

15. Use a razor-sharp scraper to remove a four-square inch section of paint from the painted surface.

16. Place the paint in a sample container and ship to the laboratory for lead analysis. Handle samples in accordance with Volpe SOP-019.

17. For non-destructive sampling or sample screening, an X-ray fluorescence (XRF) handheld scanner may be used by a trained individual to estimate lead content.

18. Photographs, location drawings, and sample results shall be included in the survey report. Field activities should be recorded in the field notebook by Volpe Staff in accordance with Volpe SOP-001.

4.3 PCBs

19. Building materials produced between 1950 and 1979 such as paints, caulks, and coatings may contain PCBs. A hazardous building materials survey may include the analysis of building materials to determine PCB concentrations. Materials may be surveyed by a contracted inspector or by Volpe field staff who have been trained in sample collection if the surfaces to be sampled are known to not be ACM.

20. Each unique building material that may include PCBs on the building interior and exterior shall be surveyed.

21. The sampler shall don appropriate PPE according to the HASP, which includes gloves and eye protection.

22. Use a razor-sharp scraper to remove approximately 10 grams of material.

23. Place the paint in a jar and ship to the laboratory for PCB analysis. Handle samples in accordance with Volpe SOP-

019.

24. Light ballasts may also be included in the survey. Ballasts that do not have a “No PCBs” sticker may be assumed to contain PCBs.

25. Photographs, location drawings, and sample results shall be included in the survey report. Field activities should be recorded in the field notebook by Volpe Staff in accordance with Volpe SOP-001.

4.4 Other Materials

26. Hazardous materials other than asbestos, lead, and PCBs may be included in a hazardous building materials survey

(such as mold, etc.) and should be assessed in accordance with best practices and industry standards as identified in an inspector’s work plan and approved by the Volpe Program Manager.

SOP 024 – Hazardous Building Materials Survey Page 4 of 4

5.0Quality Assurance and Control (QA/QC)

The Volpe Program Manager is responsible for ensuring that the inspector is accredited according to applicable regulations. Volpe Field Staff are responsible for ensuring that the survey is completed according to scope and under the appropriate procedures. All samples for analysis shall be sent to a state-certified laboratory.

6.0Limitations and Precautions

Asbestos and other hazardous building materials pose a risk to human health. Inspections that disturb these materials should be handled with extreme care and follow best practices. This SOP does not cover the use of respiratory protection, which should be appropriately utilized by the inspector in accordance with applicable regulations and contractor’s HASP and SOPs. Hazardous building materials surveys should only be conducted by an inspector who is appropriately certified and/or licensed according to applicable federal and state regulations. The professional judgement of the inspector and applicable local laws may and should supersede the procedures of this SOP when necessary and as approved by the Volpe Program Manager.

7.0References

EPA. (2013). Guidance Document: Bulk Sampling for Asbestos; SESDGUID-104-R1

EPA (2021). PCBs In Building Materials: Determining the Presence of Manufactured PCB Products in Buildings or Other Structures

HUD. (n.d) Appendix 13.2 Paint Chip Sampling

ASBESTOS IDENTIFICATION SURVEY REPORT

PROJECT LOCATION:

Frog Switch

600 East High Street Carlisle, Pennsylvania

INSPECTION DATE:

May 3, 2021 and May 7, 2021

PREPARED FOR:

Mr. Warren Bieger

Mr. Daniel M. Gibbs Frog Switch

600 East High Street Carlisle, Pennsylvania 17013

CALI PROJECT NUMBER:

21-1034-019

INSPECTION REPORT DATE:

May 18, 2021

ASBESTOS IDENTIFICATION SURVEY PERFORMED BY:

Andrew R. Spriggle, Pennsylvania Asbestos Inspector #032501

Richard E. Roush, Pennsylvania Asbestos Building Inspector and Manager Planner and Lonnie R. Eslinger, Jr., Industrial Hygienist

CUMBERLAND ANALYTICAL LABORATORIES, INC.

125 Frytown Road

Carlisle, Pennsylvania 17015 Phone: (717) 379-3782

Fax: (717) 776-6436 E-Mail: rich.roush@c-analytical.com www.cumberlandanalyticallabs.com

Table of Contents

Polarized Light Microscopy (PLM) Results Data Table:

SAMPLE NUMBER/

DESCRIPTION/LOCATION

ASBESTOS

PRESENT COLOR

ASBESTOS

TYPE

PERCENTAGE

OTHER

MATERIALS

L1428-01: Rope Material (Frog Shop) Yes White 75% Chrysotile 25% Cellulose

L1428-02: Rope Material (Frog Shop) Sample Not Analyzed - Stop Positive.

L1428-03: Rope Material (Frog Shop) Sample Not Analyzed - Stop Positive.

L1428-04: Refractory Material (Frog Shop) No Red None Detected 100% Non-Fibrous Materials

L1428-05: Refractory Material (Frog Shop) No Tan None Detected 100% Non-Fibrous Materials

L1428-06: Refractory Material (Frog Shop) No Tan None Detected 100% Non-Fibrous Materials

L1428-07: Refractory Material (Frog Shop) No Tan None Detected 15% Fibrous Glass 85% Non-Fibrous Materials

L1428-08: TSI (Frog Shop) Yes White 10% Amosite 90% Non-Fibrous Materials

L1428-09: TSI (Frog Shop) Sample Not Analyzed - Stop Positive.

L1428-10: TSI (Frog Shop) Sample Not Analyzed - Stop Positive.

L1428-11: Beige Tile 12” x 12” (Frog Shop Lunch) No Beige None Detected 100% Non-Fibrous Materials

L1428-11M: Mastic Associated with Beige Tile 12” x 12” (Frog Shop Lunch)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-12: Beige Tile 12” x 12” (Frog Shop Lunch) No Beige None Detected 100% Non-Fibrous Materials

L1428-12M: Mastic Associated with Beige Tile 12” x 12” (Frog Shop Lunch)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-13: Beige Tile 12” x 12” (Frog Shop Lunch) No Beige None Detected 100% Non-Fibrous Materials

L1428-13M: Mastic Associated with Beige Tile 12” x 12” (Frog Shop Lunch)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-14: Ceiling Tile (Frog Shop Lunch) No White/Tan None Detected 60% Cellulose

10% Fibrous Glass 30% Non-Fibrous Materials

L1428-15: Ceiling Tile (Frog Shop Lunch) No White/Tan None Detected 60% Cellulose

10% Fibrous Glass 30% Non-Fibrous Materials

L1428-16: Ceiling Tile (Frog Shop Lunch) No White/Tan None Detected 60% Cellulose

10% Fibrous Glass 30% Non-Fibrous Materials

L1428-17: Exterior Parging (Frog Shop) No Gray None Detected 100% Non-Fibrous Materials

DESCRIPTION/LOCATION

ASBESTOS

PRESENT COLOR

ASBESTOS

TYPE

PERCENTAGE

OTHER

MATERIALS

L1428-18: Exterior Parging (Frog Shop) No Gray None Detected 100% Non-Fibrous Materials

L1428-19: Exterior Parging (Frog Shop) No Gray None Detected 100% Non-Fibrous Materials

L1428-20: 1 x 1 Ceiling Tile (Warehouse) No Tan None Detected 95% Cellulose

5% Non-Fibrous Materials

L1428-21: 1 x 1 Ceiling Tile (Warehouse) No Tan None Detected 95% Cellulose

5% Non-Fibrous Materials

L1428-22: 1 x 1 Ceiling Tile (Warehouse) No Tan None Detected 95% Cellulose

5% Non-Fibrous Materials

L1428-23: Window Glazing (Old Machine Shop) No Gray None Detected 100% Non-Fibrous Materials

L1428-24: Window Glazing (Old Machine Shop) No Gray None Detected 100% Non-Fibrous Materials

L1428-25: South Lab (Foundry 12” x 12” on Wood)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-25M: Mastic Associated with South Lab (Foundry 12” x 12” on Wood)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-26: South Lab (Foundry 12” x 12” on Wood)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-26M: Mastic Associated with South Lab (Foundry 12” x 12” on Wood)

No

Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-27: South Lab (Foundry 12” x 12” on Wood)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-27M: Mastic Associated with South Lab (Foundry 12” x 12” on Wood)

No Yellow None Detected

<1% Cellulose 99% Non-Fibrous Materials

L1428-28: Core Room Dry Wall Compound (Foundry); Drywall Only

No White/Tan None Detected 5% Cellulose

<1% Fibrous Glass 94% Non-Fibrous Materials

L1428-29: Core Room Dry Wall Compound (Foundry); Joint Compound Only

No White None Detected 100% Non-Fibrous Materials

L1428-30: Spray on Ceiling (Foundry) No Black None Detected 90% Cellulose

<1% Fibrous Glass 10% Non-Fibrous Materials

L1428-31: Spray on Ceiling (Foundry) No Black None Detected 90% Cellulose

<1% Fibrous Glass 10% Non-Fibrous Materials

L1428-32: Spray on Ceiling (Foundry) No Black None Detected 90% Cellulose

<1% Fibrous Glass 10% Non-Fibrous Materials

L1428-33: Beige Floor Tile 12” x 12” (Foundry) No Gray None Detected 100% Non-Fibrous Materials

L1428-33M: Mastic Associated with Beige Floor Tile 12” x 12” (Foundry)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-34: Beige Floor Tile 12” x 12” (Foundry) No Gray None Detected 100% Non-Fibrous Materials

ASBESTOS

PRESENT COLOR

ASBESTOS

TYPE

PERCENTAGE

OTHER

MATERIALS

L1428-34M: Mastic Associated with Beige Floor Tile 12” x 12” (Foundry)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-35: Beige Floor Tile 12” x 12” (Foundry) No Gray None Detected 100% Non-Fibrous Materials

L1428-35M: Mastic Associated with Beige Floor Tile 12” x 12” (Foundry)

No Yellow None Detected <1% Cellulose

99% Non-Fibrous Materials

L1428-36: 2 x 4 Ceiling Tile (Foundry) No White/Tan None Detected 35% Cellulose

35% Fibrous Glass 30% Non-Fibrous Materials

L1428-37: 2 x 4 Ceiling Tile (Foundry) No White/Tan None Detected 35% Cellulose

35% Fibrous Glass 30% Non-Fibrous Materials

L1428-38: 2 x 4 Ceiling Tile (Foundry) No White/Tan None Detected 35% Cellulose

35% Fibrous Glass 30% Non- Fibrous Materials

L1428-39: Drywall Compound (Foundry) No White/Tan None Detected 5% Cellulose

<1% Fibrous Glass 94% Non-Fibrous Materials

L1428-40: Drywall Compound (Foundry) No White/Tan None Detected 5% Cellulose

<1% Fibrous Glass 94% Non-Fibrous Materials

L1428-41: Drywall Compound (Foundry) No White/Tan None Detected 5% Cellulose

<1% Fibrous Glass 94% Non-Fibrous Materials

L1428-42: Transite South Side Roof (Foundry) Yes Gray 10% Chrysotile 90% Non-Fibrous Materials

L1428-43: Transite Roof South Side (Foundry) Sample Not Analyzed - Stop Positive.

L1428-44: Transite Roof South Side (Foundry) Sample Not Analyzed - Stop Positive.

L1428-45: Composite Drywall/Compound (Machine Shop); Drywall Only

No White/Tan None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-46: Composite Drywall/Compound (Machine Shop)

Yes White/Tan <1% Chrysotile 5% Cellulose

94% Non-Fibrous Materials

L1428-47: Composite Drywall/Compound (Machine Shop)

Yes White/Tan <1% Chrysotile 5% Cellulose

94% Non-Fibrous Materials

L1428-48: 12” x 12” Beige Floor Tile (Guard Shack)

No Beige None Detected 100% Non-Fibrous Materials

L1428-48M: Mastic Associated with 12” x 12” Beige Floor Tile (Guard Shack)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-49: 12” x 12” Beige Floor Tile (Guard Shack)

No Beige None Detected 100% Non-Fibrous Materials

L1428-49M: Mastic Associated with 12” x 12” Beige Floor Tile (Guard Shack)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-50: 12” x 12” Beige Floor Tile (Guard Shack)

No Beige None Detected 100% Non-Fibrous Materials

ASBESTOS

PRESENT COLOR

ASBESTOS

TYPE

PERCENTAGE

OTHER

MATERIALS

L1428-50M: Mastic Associated with 12” x 12” Beige Floor Tile (Guard Shack)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-51: 2 x 4 Ceiling Tile (Guard Shack) No White/Tan None Detected 35% Cellulose

35% Fibrous Glass 30% Non-Fibrous Materials

L1428-52: 2 x 4 Ceiling Tile (Guard Shack) No White/Tan None Detected 35% Cellulose

35% Fibrous Glass 30% Non-Fibrous Materials

L1428-53: 2 x 4 Ceiling Tile (Guard Shack) No White/Tan None Detected 35% Cellulose

35% Fibrous Glass 30% Non-Fibrous Materials

L1428-54: 12” x 12” Yellow (Guard Shack) No Yellow None Detected 100% Non-Fibrous Materials

L1428-54M: Mastic Associated with 12” x 12” Yellow (Guard Shack)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-55: 12” x 12” Yellow (Guard Shack) No Yellow None Detected 100% Non-Fibrous Materials

L1428-55M: Mastic Associated with 12” x 12” Yellow (Guard Shack)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-56: 12” x 12” Yellow (Guard Shack) No Yellow None Detected 100% Non-Fibrous Materials

L1428-56M: Mastic Associated with 12” x 12” Yellow (Guard Shack)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-57: Drywall/Compound Composite (Guard Shack)

No White/Tan None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-58: Drywall/Compound Composite (Guard Shack)

No White/Tan None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-59: Drywall/Compound Composite (Guard Shack)

No White/Tan None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-60: 2 x 4 Ceiling Tile (Guard Shack) No White/Tan None Detected 20% Cellulose

40% Fibrous Glass 40% Non-Fibrous Materials

L1428-61: 2 x 4 Ceiling Tile (Guard Shack) No White/Tan None Detected 20% Cellulose

40% Fibrous Glass 40% Non-Fibrous Materials

L1428-62: 2 x 4 Ceiling Tile (Guard Shack) No White/Tan None Detected 20% Cellulose

40% Fibrous Glass 40% Non-Fibrous Materials

L1428-63: 1 x 1 Ceiling Tile (Main Office) No White/Gray None Detected <1% Cellulose

90% Fibrous Glass 9% Non-Fibrous Materials

L1428-63M: Mastic Associated with 1 x 1 Ceiling Tile (Main Office)

No Brown None Detected <1% Cellulose

<1% Fibrous Glass 99% Non-Fibrous Materials

L1428-64: 1 x 1 Ceiling Tile (Main Office) No White/Gray None Detected <1% Cellulose

90% Fibrous Glass 9% Non-Fibrous Materials

ASBESTOS

PRESENT COLOR

ASBESTOS

TYPE

PERCENTAGE

OTHER

MATERIALS

L1428-64M: Mastic Associated with 1 x 1 Ceiling Tile (Main Office)

No Brown None Detected <1% Cellulose

<1% Fibrous Glass 99% Non-Fibrous Materials

L1428-65: 1 x 1 Ceiling Tile (Main Office) No White/Gray None Detected <1% Cellulose

90% Fibrous Glass 9% Non-Fibrous Materials

L1428-65M: Mastic Associated with 1 x 1 Ceiling Tile (Main Office)

No Brown None Detected <1% Cellulose

<1% Fibrous Glass 99% Non-Fibrous Materials

L1428-66: 12” x 12” Multi Color 1st Floor (Main Office)

No Tan None Detected 100% Non-Fibrous Materials

L1428-66M: Mastic Associated with 12” x 12” Multi Color 1st Floor (Main Office)

No Brown None Detected 100% Non-Fibrous Materials

L1428-67: 12” x 12” Multi Color 1st Floor (Main Office)

No Tan None Detected 100% Non-Fibrous Materials

L1428-67M: Mastic Associated with 12” x 12” Multi Color 1st Floor (Main Office)

No Brown None Detected 100% Non-Fibrous Materials

L1428-68: 12” x 12” Multi Color 1st Floor (Main Office)

No Tan None Detected 100% Non-Fibrous Materials

L1428-68M: Mastic Associated with 12” x 12” Multi Color 1st Floor (Main Office)

No Brown None Detected 100% Non-Fibrous Materials

L1428-69: Window Caulking (Main Office) No Tan None Detected 100% Non-Fibrous Materials

L1428-70: Transite Roof (Main Office) Yes Gray 10% Chrysotile 90% Non-Fibrous Materials

L1428-71: Composite Drywall/Compound (Main Office)

Yes White/Tan <1% Chrysotile 5% Cellulose

94% Non-Fibrous Materials

L1428-72: Composite Drywall/Compound (Main Office)

Yes White/Tan <1% Chrysotile 5% Cellulose

94% Non-Fibrous Materials

L1428-73: Composite Drywall/Compound (Main Office); Wall Mix

No White/Tan/

Gray None Detected 100% Non-Fibrous Materials

L1428-74: Vault 12” x 12” (Main Office) No White None Detected 100% Non-Fibrous Materials

L1428-74M: Mastic Associated with Vault 12” x 12” (Main Office)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-74: Leveling Compound Associated with Vault 12” x 12” (Main Office)

No Gray None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-75: Vault 12” x 12” (Main Office) No White None Detected 100% Non-Fibrous Materials

L1428-75M: Mastic Associated with Vault 12” x 12” (Main Office)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-75: Leveling Compound Associated with Vault 12” x 12” (Main Office)

No Gray None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-76: Vault 12” x 12” (Main Office) No White None Detected 100% Non-Fibrous Materials

ASBESTOS

PRESENT COLOR

ASBESTOS

TYPE

PERCENTAGE

OTHER

MATERIALS

L1428-76M: Mastic Associated with Vault 12” x 12” (Main Office)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-76: Leveling Compound Associated with Vault 12” x 12” (Main Office)

No Gray None Detected 5% Cellulose

95% Non-Fibrous Materials

L1428-77: North Roof Coating (Foundry) Yes Gray 10% Chrysotile 90% Non-Fibrous Materials

L1428-78: Center Roof Material (Foundry) Yes Gray 20% Chrysotile 80% Non-Fibrous Materials

L1428-80: Linoleum (Break Room) No White/Gray None Detected 10% Fibrous Glass

90% Non-Fibrous Materials

L1428-80M: Mastic Associated with Linoleum (Break Room)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-81: Linoleum (Break Room) No White/Gray None Detected 10% Fibrous Glass

90% Non-Fibrous Materials

L1428-81M: Mastic Associated with Linoleum (Break Room)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-82: Linoleum (Break Room) No White/Gray None Detected 10% Fibrous Glass

90% Non-Fibrous Materials

L1428-82M: Mastic Associated with Linoleum (Break Room)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-83: 12” x 12” Flooring (Break Room) No White None Detected 100% Non-Fibrous Materials

L1428-83M: Mastic Associated with 12” x 12” Flooring (Break Room)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-84: 12” x 12” Flooring (Break Room) No White None Detected 100% Non-Fibrous Materials

L1428-84M: Mastic Associated with 12” x 12” Flooring (Break Room)

No Yellow None Detected 100% Non-Fibrous Materials

L1428-85: 12” x 12” Flooring (Break Room) No White None Detected 100% Non-Fibrous Materials

L1428-85M: Mastic Associated with 12” x 12” Flooring (Break Room)

No Yellow None Detected 100% Non-Fibrous Materials

File details come from the government source that posted it. Updated .