QA_10.29.26.pdf
PDF 179 KB Posted
- Solicitation number
- 69056726R000019
About this file
This is a Questions and Answers document for Project No. ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1. The document addresses three technical questions regarding temporary roadway rockfall protection measures, specifically Mobile Rockfall Barriers (MRB), dated October 29, 2026.
The questions and answers clarify contractor obligations for rockfall protection installation. Regarding station ranges in Table 269-1, the MRB must extend at least 50 feet beyond active scaling or other upslope work areas; the contractor's means and methods will dictate the exact length of active work areas. On whether a single MRB can be relocated between station ranges or if both ranges require simultaneous protection, the answer specifies that temporary roadway rockfall protection needs to be in place during all work activities listed in Table 269-1. Regarding the 180-foot length specification on Sheet I.5, it is not a minimum required length but illustrative only; the MRB length will be determined by the contractor's means and methods and must extend at least 50 feet beyond active scaling or other upslope work areas. All three responses were provided on October 29, 2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ida-kooten8450-1_plans_RFP.pdf | ||
| RFP_69056726R000019_ID FLAP KOOTEN 8450(1).pdf | ||
| Physical Data.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. ID FLAP KOOTEN 8450(1)
Project Yellowstone Trail Road, Segment 1
General Technical Question Answer Date
X
Do the station ranges in Table 269-1 already include the 50-ft extension, or must the MRB extend 50 ft beyond those stations?
The contractor's means and methods will dictate the exact length of active scaling or other upslope work areas. The MRB must extend at least 50 ft beyond active scaling or other upslope work areas.
10/29/26
X
May a single MRB be used at one station range and then relocated to the other, or must both ranges be protected at the same time?
Temporary roadway rockfall protection needs to be in place during the work activities in Table 269-1.
10/29/26
X Is the 180-ft length on Sheet I.5 a minimum required length, or illustrative only?
The contractor's means and methods will dictate the exact length of active scaling or other upslope work areas. The MRB must extend at least 50 ft beyond active scaling or other upslope work areas.
10/29/26