QA_11.19.26.pdf

PDF 188 KB Posted

Attached to
ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements
Solicitation number
69056726R000009
Issued by

About this file

This is a Questions and Answers document for Project ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements, issued by the Western Federal Lands Highway Division (WFLHD). The document addresses five technical inquiries submitted during the presolicitation phase regarding material specifications, design alternatives, and contractor participation.

Key responses clarify that project-specific alternative materials may be proposed during the solicitation period but would be evaluated as value engineering change proposals (VECP) under FAR Part 48 after task order issuance. The WFLHD Construction Operations Engineer and Pavement Engineer retain technical approval authority for Section 305 FDR material and related VECPs. Specific material testing and submittal requirements will be detailed in the upcoming solicitation documents. The geogrid stabilization requirements specified in FP-24 section and any special contract modifications will be identified in the solicitation, with the government indicating that coated, knitted polyester geogrids would be acceptable if they meet required properties. Regarding MATOC contractor participation across Idaho, Montana, and Surrounding Areas, the government stated it cannot predict which contractors will submit proposals. Answers were provided on 9/14/26 and 11/19/26.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. ID FLAP CLEAR 4783(1)

Project Dent Bridge Road Improvements

# General Technical Question Answer Date

1 X

Can a project-specific alternative material be evaluated during design or presolicitation, or only through a MATOC prime after the task-order RFP is issued?

A question or RFI can be submitted during the solicitation/offer period however proposed changes to the pavement or geotechnical design would most likely be evaluated under FAR Part 48, value engineering change proposal (VECP), after the task order is issued.

9/14/26

2 X

Who owns the technical approval and specification review for the Section 305 FDR material?

The WFLHD Construction Operations

Engineer and WFLHD Pavement Engineer would evaluate VECP related to Section

305.

9/14/26

3 X

What testing and submittal information would be expected—for example, testing of representative project materials, compressive strength, durability or moisture conditioning, and any field-trial requirements?

The specific material requirements for the project such as submittal requirements, field testing, non-field testing, etc. will be identified in the upcoming solicitation documents.

9/14/26

4 X

The geogrid stabilization requirements for this task order (FP-24 section and any special contract requirements that modify it), and whether a coated, knitted polyester geogrid would be acceptable if it meets the required properties.

The geogrid stabilization requirements for this task order (FP-24 section and any special contract requirements that modify it), and whether a coated, knitted polyester geogrid would be acceptable if it meets the required properties.

11/19/26

5 X

Which of the Idaho, Montana and Surrounding

Areas MATOC holders are expected to propose, so I can get pricing to them.

We do not know which of the MATOC contractors will propose.

11/19/26

Check General or Technical