This is a Questions and Answers document for Project ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements. The document addresses three technical inquiries related to alternative materials and design specifications for the project, all dated September 14, 2026.
The Q&A clarifies that project-specific alternative materials may be submitted as questions or RFIs during the solicitation/offer period; however, proposed changes to pavement or geotechnical design will be evaluated as value engineering change proposals (VECP) under FAR Part 48 after task order issuance. Technical approval and specification review for Section 305 FDR material will be the responsibility of the WFLHD Construction Operations Engineer and WFLHD Pavement Engineer. Specific material requirements, including submittal requirements, field testing, and non-field testing specifications, will be detailed in the upcoming solicitation documents rather than specified in this Q&A document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prelim Letter_ID FLAP CLEAR 4783(1).pdf | ||
| PROJECT DESCRIPTION_ID FLAP CLEAR 4783(1).pdf | ||
| ida-clear4783-1_PLAN_preliminary.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. ID FLAP CLEAR 4783(1)
Project Dent Bridge Road Improvements
# General Technical Question Answer Date
1 X
Can a project-specific alternative material be evaluated during design or presolicitation, or only through a MATOC prime after the task-order RFP is issued?
A question or RFI can be submitted during the solicitation/offer period however proposed changes to the pavement or geotechnical design would most likely be evaluated under FAR Part 48, value engineering change proposal (VECP), after the task order is issued.
9/14/26
2 X
Who owns the technical approval and specification review for the Section 305 FDR material?
The WFLHD Construction Operations
Engineer and WFLHD Pavement Engineer would evaluate VECP related to Section
305.
9/14/26
3 X
What testing and submittal information would be expected—for example, testing of representative project materials, compressive strength, durability or moisture conditioning, and any field-trial requirements?
The specific material requirements for the project such as submittal requirements, field testing, non-field testing, etc. will be identified in the upcoming solicitation documents.