This is Amendment No. A002 to Solicitation No. 69056726R000003, issued by the Federal Highway Administration (FHWA) Western Federal Lands Division on March 9, 2026, for the National Forest System Road 221 Rehabilitation project (ID FS NEZPR117 221(1)) in the Idaho and Montana region. The amendment extends the proposal due date from March 13, 2026 to March 17, 2026 at 1400 hours local time. The solicitation is a negotiated Request for Proposal (RFP) for construction work and is limited to Idaho, Montana, and surrounding areas MATOC IDIQ contract holders only. Performance is required to begin within 10 calendar days of the notice to proceed and be completed within 60 calendar days thereafter, with performance and payment bonds required within 10 calendar days of award.

Amendment A002 revises the bid schedule by reducing the quantity of Asphalt Concrete Pavement (Item A0440, Pay Item 40301-0000) from 6,100 tons to 1,400 tons and updates the summary of quantities and tabulation of quantities accordingly. Offerors must submit revised pages A-7 through A-11 with their proposals. The work encompasses a comprehensive road rehabilitation project including mobilization, clearing and grubbing, subexcavation, select borrow, soil erosion control, geotextile and geosynthetic materials, reinforced soil slopes, full depth reclamation with cement, asphalt concrete pavement, chip seal, micro surfacing, pipe culverts, temporary stream diversion, erosion control products, signage, pavement markings, and temporary traffic control. Sealed bids in original and 1,400 copies are due at the FHWA office in Vancouver, Washington. Offers must acknowledge receipt of this amendment prior to the submission deadline using specified methods.

View the file

Other files

File Type Posted
QA_03-16-2026.pdf PDF
QA_03-09-2026.pdf PDF
QA_03-06-2026_3.pdf PDF
QA_03-06-2026_2.pdf PDF
Amendment A001.pdf PDF
QA_03-06-2026.pdf PDF
QA_03-02-2026.pdf PDF
QA_02-27-2026.pdf PDF
QA_02-12-2026.pdf PDF
idf-nezpr221-1_SWPPP.pdf PDF
idf-nezpr221-1_GEO_GM3025.pdf PDF
idf-nezpr221-1_WFLHD-28.pdf PDF
RFP_ID FS NEZPR117 221(1)_69056726R000003.pdf PDF
idf-nezpr221-1_GEO_GR0625.pdf PDF
idf-nezpr221-1_plans_RFP.pdf PDF
Exisiting Ground Surface Files.zip ZIP file
idf-nezpr221-1_control-points.xlsx XLSX spreadsheet
idf-nezpr221-1_USFS_National_Core_BMPs.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

N/A 1 2

A002 03/09/2026 N/A

5. PROJECT NUMBER (If applicable) ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

N/A N/A

N/A

X 69056726R000003

02/06/2026

N/A

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended.

ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation See page 2

N/A

N/A N/A

Amendment No. A002, dated 03/09/2026 ID FS NEZPR117 221(1)

Solicitation No. 69056726R000003 National Forest System Road 221 Rehabilitation

REVISIONS ARE AS FOLLOWS:

SF 1442, SOLICITATION, OFFER, AND AWARD

Page A-3, Block 13A. Revises proposal due date from 03/13/2026 to 03/17/2026.

BID SCHEDULE

Page A-7 through A-11. Updates the quantity of item A0440, Asphalt Concrete

Pavement from 6,100 tons to 1,400 tons.

CONTRACT CLAUSES

PLANS

Plan sheet B.1 through B.2 Revises Summary of Quantities

Plan sheet D.3 Revises the Tabulation of Quantities for Roadway

Quantities and adds a quantities table for Item 40301-0000

Asphalt Concrete Pavement.

ENCLOSURES

Pages:

A-3

A-7 through A-11

Plan Sheets:

B.1 through B.2

D.3

New proposal due date: 03/17/2026

Notice to Offerors: Please submit revised pages A-7 through A-11 with your offer.

SOLICITATION, OFFER,

AND AWARD

2. TYPE OF SOLICITATION

6. PROJECT NO. 4. CONTRACT NO. 5. REQUISITION/PURCHASE REQUEST NO.

PAGE OF PAGES

7. ISSUED BY CODE 8. ADDRESS OFFER TO

SOLICITATION

(Construction, Alteration, or Repair)

1. SOLICITATION NO. 3. DATE ISSUED

IMPORTANT -- The "offer" section on the reverse must be fully completed by offeror.

9.

INFORMATION

a. NAME

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder."

CALL:

FOR

SEALED BID (IFB)

NEGOTIATED (RFP)

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

690567

Federal Highway Administration

FHWA WESTERN FED LANDS DIVISION

610 E FIFTH STREET

Vancouver WA 98661

ACQUISITIONS

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

360-619-7520

See Block 10 x

69056726R000003

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date)

THIS TASK ORDER REQUEST FOR PROPOSAL IS BEING SOLICITATED TO THE IDAHO, MONTANA, AND

SURROUNDING AREAS MATOC IDIQ HOLDERS. ONLY CONTRACTORS AWARDED AN IDIQ

CONTRACT WILL BE CONSIDERED.

This solicitation is designated ID FS NEZPR117 221(1), National Forest System Road

221 Rehabilitation

IN STRICT ACCORDANCE WITH:

Federal Acquisition Regulations (FAR) and Transportation Acquisition Regulations

(TAR)

General Wage Decision

Special Contract Requirements

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-24

11. The Contractor shall begin performance within

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

award, notice to proceed. The performance period is mandatory negotiable. (See ________________________________________________.)

13. ADDITIONAL SOLICITATION REQUIREMENTS:

is not required.is, b. An offer guarantee

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

d. Offers providing less than

12b. CALENDAR DAYSYES NO

(If "YES", indicate within how many calendar days after award in Item 12b.)

10 calendar days and complete it within ________________ ________________ calendar days after receiving

*Page A-5

NSN 7540-01-155-3212

x x x x copies to perform the work required are due at the place specified in Item 8 by _____________ ___________________ (hour) local time calendar days for Government acceptance after the date offers are due will not be considered and will be rejected . _________________

STANDARD FORM 1442 (Rev. 8/2014)

Prescribed by GSA

FAR(48 CFR) 53.236-1(d)

A-3

1400a. Sealed offers in original and

03/10/2026_______________________

02/06/2026

________________03/13/2026

Revised by Amendment A002 Revised by Amendment A001

03/17/2026

Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Unit bid prices should be quoted no more precisely than the nearest cent (2 decimal places). Unit bid prices quoted more precisely will be rounded up to the nearest cent by the Government. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.

BID SCHEDULE

A-7Bid Schedule Project: ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation

Revised by Amendment A002 Revised by Amendment A001

BID SCHEDULE

Project No : ID FS NEZPR117 221(1) Schedule : A

Project Name : National Forest System Road 221 Rehabilitation

Schedule Type : Base

Contract Quantity Pay Items

No Contract Quantity Pay Items

AMD# Line Item Number

Pay Item Number

Description Supplemental Description

Quantity Unit Unit Price Amount

A0020 15101-0000 MOBILIZATION ALL LPSM

A0040 15201-0000

CONSTRUCTION

SURVEY AND

STAKING

ALL LPSM

A0060 15301-0000 CONTRACTOR

QUALITY CONTROL ALL LPSM

A0080 15401-0000 CONTRACTOR

TESTING ALL LPSM

A0100 15501-0000 CONSTRUCTION

SCHEDULE ALL LPSM

A0120 15705-1400

SOIL EROSION

CONTROL, FIBER

ROLL

1,600.000 LNFT

A0140 15706-1600

SOIL EROSION

CONTROL,

STABILIZED

CONSTRUCTION EXIT

2.000 EACH

A0160 20101-0000 CLEARING AND

GRUBBING 2.100 ACRE

A0180 20301-2400 REMOVAL OF SIGN 95.000 EACH

A0200 20402-0000 SUBEXCAVATION 4,550.000 CUYD

A0220 20410-0000 SELECT BORROW 4,550.000 CUYD

A0240 20702-0000 STABILIZATION

GEOTEXTILE 2,110.000 SQYD

A0260 20706-0300

REINFORCEMENT

GEOSYNTHETIC,

TYPE 3

13,770.000 SQYD

A0280 25101-0200 PLACED RIPRAP,

CLASS 2 50.000 CUYD

A0300 25101-0300 PLACED RIPRAP,

CLASS 3 115.000 CUYD

A0320 25701-0000

CONTRACTOR

PROVIDED RETAINING

STRUCTURE DESIGN

(REINFORCED SOIL

SLOPE) ALL LPSM

A0340 26101-1000

REINFORCED SOIL

SLOPE, WELDED

WIRE FACE

1,300.000 SQFT

A0360 30202-2000

ROADWAY

AGGREGATE,

METHOD 2

6,200.000 TON

A0380 30202-2000

ROADWAY

AGGREGATE,

METHOD 2

(TEMPORARY)

340.000 TON

A0400 30502-0800

FULL DEPTH

RECLAMATION WITH

CEMENT, 8-INCH

DEPTH

112,710.000 SQYD

A0420 30510-0000 CEMENTITIOUS

MATERIAL 190.000 TON

A0440 40301-0000 ASPHALT CONCRETE

PAVEMENT 1,400.000 TON

A0460 40702-0300 CHIP SEAL, TYPE 1C 410,300.000 SQYD

A-8Bid Schedule Project: ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation

Revised by Amendment A002

A002

A0500 40711-0000 EMULSIFIED ASPHALT 740.000 TON

A001 A0520 40901-3000 MICRO SURFACING,

TYPE 3 410,300.000 SQYD

A001 A0520 40901-2000 MICRO SURFACING,

TYPE 2 410,300.000 SQYD

A0540 41102-0000 PRIME COAT 111,000.000 SQYD

A0560 41201-0000 TACK COAT 90.000 TON

A0580 41401-2000 CRACKS, CLEANING

AND SEALING 1,200.000 LNFT

A0600 41801-2000

ASPHALT CONCRETE

PAVEMENT PATCH,

TYPE 2

3,000.000 SQYD

A0620 60201-0800 24-INCH PIPE

CULVERT 800.000 LNFT

A0640 60201-1000 36-INCH PIPE

CULVERT 350.000 LNFT

A0660 60201-2000 96-INCH PIPE

CULVERT 75.000 LNFT

A0680 60210-0800 END SECTION FOR 24-

INCH PIPE CULVERT 22.000 EACH

A0700 60210-1000 END SECTION FOR 36-

INCH PIPE CULVERT 10.000 EACH

A0720 60501-0000

STANDARD

UNDERDRAIN

SYSTEM

(TEMPORARY)

740.000 LNFT

A0740 61921-1000 REMOVE AND RESET

FENCE 100.000 LNFT

A0760 62201-0250

DUMP TRUCK, 10

CUBIC YARD MINIMUM

CAPACITY

100.000 HOUR

A0780 62201-1600

BULLDOZER,

UNIVERSAL BLADE,

100HP MINIMUM

100.000 HOUR

A0800 62201-2800

MOTOR GRADER, 8

FOOT MINIMUM

BLADE

120.000 HOUR

A0820 62201-3300

HYDRAULIC

EXCAVATOR, 3.0

CUBIC YARD MINIMUM

CAPACITY WITH

THUMB ATTACHMENT

220.000 HOUR

A0840 62201-3750 CHAIN SAW 60.000 HOUR

A0860 62301-0000 GENERAL LABOR 160.000 HOUR

A0880 62501-0000 TURF

ESTABLISHMENT 1.500 ACRE

A0900 62801-0000 TEMPORARY STREAM

DIVERSION ALL LPSM

A0920 62901-0000 ROLLED EROSION

CONTROL PRODUCT 1,550.000 SQYD

A0940 63302-0000 SIGN SYSTEM 975.000 SQFT

A0960 63308-2000 OBJECT MARKER,

TYPE 2 5.000 EACH

A0980 63308-3000 OBJECT MARKER,

TYPE 3 13.000 EACH

A1000 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(WHITE)

584,000.000 LNFT

A1020 63401-0300

PAVEMENT

MARKINGS, TYPE B,

SOLID

(YELLOW)

603,400.000 LNFT

A1040 63401-0400

PAVEMENT

MARKINGS, TYPE B,

BROKEN

(YELLOW)

33,000.000 LNFT

A1060 63501-0000 TEMPORARY TRAFFIC

CONTROL ALL LPSM

A-9Bid Schedule Project: ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation

A1080 63501-2000

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

SIGNAL SYSTEM

ALL LPSM

A1100 63506-0500 TEMPORARY TRAFFIC

CONTROL, FLAGGER 2,000.000 HOUR

A1120 63507-0600 TEMPORARY TRAFFIC

CONTROL, PILOT CAR 100.000 DAY

A1140 63507-0700

TEMPORARY TRAFFIC

CONTROL, TRAFFIC

CONTROL

SUPERVISOR

100.000 DAY

A1160 64704-1000

ENVIRONMENTAL

DESIGN, STREAMBED

MATERIAL

50.000 CUYD

Submitted By: Schedule Total:

A-10Bid Schedule Project: ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation

BID SCHEDULE SUMMARY

Schedule Bid Total

Schedule A - Base $

A-11Bid Schedule Project: ID FS NEZPR117 221(1), National Forest System Road 221 Rehabilitation

Sheet and Description

D E F G H I J

Line Graph Approach Roads

Soil Erosion and

Sediment Control

Drainage Walls Temporary

Traffic Control Plan

Permanent Traffic

Control Plan

BID

SCHEDULE

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0080 15401-0000 CONTRACTOR TESTING LPSM ALL

A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0120 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1530 70 1600

A0140 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT EACH 2 2

A0160 20101-0000 CLEARING AND GRUBBING ACRE 2 0.1 2.1

A0180 20301-2400 REMOVAL OF SIGN EACH 89 6 95

A0200 20402-0000 SUBEXCAVATION CUYD 4140 410 4550

A0220 20410-0000 SELECT BORROW CUYD 4140 410 4550

A0240 20702-0000 STABILIZATION GEOTEXTILE SQYD 1920 190 2110

A0260 20706-0300 REINFORCEMENT GEOSYNTHETIC, TYPE 3 SQYD 12520 1250 13770

A0280 25101-0200 PLACED RIPRAP, CLASS 2 CUYD 44 6 50

A0300 25101-0300 PLACED RIPRAP, CLASS 3 CUYD 107 8 115

A0320 25701-0000 CONTRACTOR PROVIDED RETAINING STRUCTURE DESIGN (REINFORCED SOIL SLOPE) LPSM ALL

A0340 26101-1000 REINFORCED SOIL SLOPE, WELDED WIRE FACE SQFT 1200 100 1300

A0360 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 5798 102 300 6200

A0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 (TEMPORARY) TON 326 14 340

A0400 30502-0800 FULL DEPTH RECLAMATION WITH CEMENT, 8-INCH DEPTH SQYD 107310 5400 112710

A0420 30510-0000 CEMENTITIOUS MATERIAL TON 179 11 190

A002 A0440 40301-0000 ASPHALT CONCRETE PAVEMENT TON 1289 111 1400

A0460 40702-0300 CHIP SEAL, TYPE 1C SQYD 396000 142 14158 410300

A0500 40711-0000 EMULSIFIED ASPHALT TON 709 1 30 740

A001 A0520 40901-2000 MICRO SURFACING, TYPE 2 SQYD 396000 142 14158 410300

A001 A0520 40901-3000 MICRO SURFACING, TYPE 3 SQYD 396000 142 14158 410300

A0540 41102-0000 PRIME COAT SQYD 107311 3689 111000

A0560 41201-0000 TACK COAT TON 87 3 90

A0580 41401-2000 CRACKS, CLEANING AND SEALING LNFT 1060 140 1200

A0600 41801-2000 ASPHALT CONCRETE PAVEMENT PATCH, TYPE 2 SQYD 2887 113 3000

A0620 60201-0800 24-INCH PIPE CULVERT LNFT 756 44 800

A0640 60201-1000 36-INCH PIPE CULVERT LNFT 325 25 350

A0660 60201-2000 96-INCH PIPE CULVERT LNFT 72 3 75

A0680 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 22 22

A0700 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 10 10

A0720 60501-0000 STANDARD UNDERDRAIN SYSTEM (TEMPORARY) LNFT 700 40 740

A0740 61921-1000 REMOVE AND RESET FENCE LNFT 90 10 100

A0760 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY HOUR 100

A0780 62201-1600 BULLDOZER, UNIVERSAL BLADE, 100HP MINIMUM HOUR 100

A0800 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 120

PAY ITEM

NUMBER

LINE

ITEM

NO.

c:

\p w _w or k_ w fl\ d0 id f-ne zp r2

-1

_1

_s oq _A

1.

xl sm

]S he et 9-

M ar

-2

9:

A

M

A M E N D

SUMMARY OF QUANTITIES

Milestone: Revised by Amendment A002; Date Completed: 3/9/2026

Remarks and/or Determination of

Estimated Quantity

Estimated Quantities

ALLOW-

ANCEUNITPAY ITEM DESCRIPTION

PROJECT

B.1ID FS NEZPR117 221(1)

SHEET

NUMBER

Sheet and Description

D E F G H I J

Line Graph Approach Roads

Soil Erosion and

Sediment Control

Drainage Walls Temporary

Traffic Control Plan

Permanent Traffic

Control Plan

BID

SCHEDULE

A0820 62201-3300 HYDRAULIC EXCAVATOR, 3.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT HOUR 220

A0840 62201-3750 CHAIN SAW HOUR 60

A0860 62301-0000 GENERAL LABOR HOUR 160

A0880 62501-0000 TURF ESTABLISHMENT ACRE 1.2 0.3 1.5

A0900 62801-0000 TEMPORARY STREAM DIVERSION LPSM ALL

A0920 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 1480 70 1550

A0940 63302-0000 SIGN SYSTEM SQFT 923 52 975

A0960 63308-2000 OBJECT MARKER, TYPE 2 EACH 4 1 5

A0980 63308-3000 OBJECT MARKER, TYPE 3 EACH 12 1 13

A1000 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE) LNFT 580895 3105 584000

A1020 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW) LNFT 600431 2969 603400

A1040 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW) LNFT 32662 338 33000

A1060 63501-0000 TEMPORARY TRAFFIC CONTROL LPSM ALL

A1080 63501-2000 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM LPSM ALL

A1100 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1940 60 2000

A1120 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR DAY 97 3 100

A1140 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR DAY 97 3 100

A1160 64704-1000 ENVIRONMENTAL DESIGN, STREAMBED MATERIAL CUYD 42 8 50

ALLOW-

ANCE

Estimated Quantities Remarks and/or

Determination of Estimated Quantity c:

\p w _w or k_ w fl\ d0 id f-ne zp r2

-1

_1

_s oq _A

1.

xl sm

]S he et

2)

SUMMARY OF QUANTITIES

A M E N D

LINE

ITEM

NO.

9- M ar -2

9:

A M

Milestone: Revised by Amendment A002; Date Completed: 3/9/2026

PAY ITEM

NUMBER PAY ITEM DESCRIPTION UNIT

PROJECT

B.2ID FS NEZPR117 221(1)

NUMBER

Revised by Amendment A001

Revised by Amendment A002

:0

P

M

M a r c h

T

A B

U L

A T

IO

N

O F

P L

A N

A N

D P

R O

F

IL

E Q

U A

N T

IT

Y c p w w o r k w f l\ d

\i d f n e z p r

D

.d g n

TABULATION OF QUANTITIES

PROJECT

NUMBER

D.3ID FS NEZPR117 221(1)

File details come from the government source that posted it. Updated .