QA_07-14-2026.pdf

PDF 184 KB Posted

Attached to
MT DAR MALM 2026(1), Defense Access Roads FY 2026
Solicitation number
69056726B000004
Issued by

About this file

This is a Questions and Answers document for federal contract solicitation MT DAR MALM 2026(1), Defense Access Roads FY 2026.

The document addresses five inquiries from bidders regarding project timeline and material specifications. The substantial and final completion date, along with the expected project start date, are both 6/22/26, with references to page A-5, Block 11 of the Invitation for Bids. Regarding inclement weather delays, bidders are directed to FAR Clause 52.249-10 (Default for Fixed-Price Construction) on page C-103 of the IFB, and to sections FP24 108.04 (Determination and Extension of Contract Time) and 108.06 (Stop Work Order) for specific guidelines. No organized site visit is provided, though the routes are noted as accessible. A technical clarification specifies that magnesium chloride is not an acceptable substitute for calcium chloride; bidders must bid in accordance with the solicitation documents as written. Response dates range from 6/22/26 to 7/14/26.

View the file

Other files

File Type Posted
BidTab_MT DAR MALM 2026(1).pdf PDF
BidSum_MT DAR MALM 2026(1).pdf PDF
QA_07-15-2026.pdf PDF
QA_07-01-2026.pdf PDF
QA_06-22-2026.pdf PDF
IFB_69056726B000004_MT DAR MALM 2026(1).pdf PDF
DAR Grizzly Bear Sightings Log.docx DOCX document
mtd-malm2026-1_plans.pdf PDF
2024 bear safety and ecology education.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. MT DAR MALM 2026(1)

Project Defense Access Roads FY 2026

# General Technical Question Answer Date

1 X What is the substantial and final completion date?

See page A-5, Block 11 of the Invitation for

Bids (IFB).

6/22/26

2 X What is the expected project start date?

See page A-5, Block 11 of the Invitation for

Bids (IFB).

6/22/26

3 X Are there established guidelines for inclement weather delays?

See FAR Clause 52.249-10, Default (Fixed-

Price Construction) on page C-103 of the

Invitation for Bids (IFB) and refer to the FP-

24, 108.04 Determination and Extension of

Contract Time and 108.06 Stop Work Order.

6/22/26

4 X Is there an organized site visit?

No, there is no organized site visit. The routes are accessible.

7/1/26

5 X Can magnesium chloride be used as a substitute for calcium chloride?

Magnesium Chloride is not allowed. Bid per the solicitation documents.