QA_06-22-2026.pdf

PDF 181 KB Posted

Attached to
MT DAR MALM 2026(1), Defense Access Roads FY 2026
Solicitation number
69056726B000004
Issued by

About this file

This is a Questions and Answers document for the Defense Access Roads FY 2026 federal construction project (Project No. MT DAR MALM 2026(1)). The document does not address specific required products or services, but rather provides clarifications on project timeline and contractual procedures for bidders on the Invitation for Bids (IFB).

The document confirms that both the substantial and final completion date and the expected project start date are June 22, 2026, with specific details referenced in Block 11 of the IFB (page A-5). For inclement weather delays, the answer directs bidders to FAR Clause 52.249-10 (Default for Fixed-Price Construction) on page C-103 of the IFB and references sections 108.04 (Determination and Extension of Contract Time) and 108.06 (Stop Work Order) of the FP-24 standard specifications. All three questions were answered on June 22, 2026, and are classified as General questions rather than Technical questions.

View the file

Other files

File Type Posted
BidTab_MT DAR MALM 2026(1).pdf PDF
BidSum_MT DAR MALM 2026(1).pdf PDF
QA_07-15-2026.pdf PDF
QA_07-14-2026.pdf PDF
QA_07-01-2026.pdf PDF
IFB_69056726B000004_MT DAR MALM 2026(1).pdf PDF
DAR Grizzly Bear Sightings Log.docx DOCX document
mtd-malm2026-1_plans.pdf PDF
2024 bear safety and ecology education.pdf PDF
WFLHD Construction Contract Administration_FY 23 V2.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. MT DAR MALM 2026(1)

Project Defense Access Roads FY 2026

# General Technical Question Answer Date

1 X What is the substantial and final completion date?

See page A-5, Block 11 of the Invitation for

Bids (IFB).

6/22/26

2 X What is the expected project start date?

See page A-5, Block 11 of the Invitation for

Bids (IFB).

6/22/26

3 X Are there established guidelines for inclement weather delays?

See FAR Clause 52.249-10, Default (Fixed-

Price Construction) on page C-103 of the

Invitation for Bids (IFB) and refer to the FP-

24, 108.04 Determination and Extension of

Contract Time and 108.06 Stop Work Order.

6/22/26